HomeMy WebLinkAboutCost Estimate'ENGINEE.R'-S~CONSTRUCTION'COST<ESTIMATE ..
. ··--.·t1>tz-~ •. s:QJ~~~~~cc11a~~til~f ~~~t(~~E$rAtroN .
: ;..~ '
.· UNITPRICEIN •. fOTAl.PRlCE: · .. · · :FrqµR~s · . 1~ ~k~J.iR,Es'.:: rfEM::oESCRIPTION ~-:,PRICE·IN.•WORi;>.s · . rrEM ··.······QE.!t .. ~.-.· .__· .• ·. ,)4'(); I l UNIT
0.09
2 50
3 3852
4
AC Clearing and Grubbing, dispose of off-site complete
for _______________ Dollars
and Cents per cubic yard.
CY Excavation of Top Soil -4" Depth; to be hauled off & disposed
of off-site complete
for Dollars
and Cents per cubic yard.
(Quantity measured in place)
SF Furnish and Install 4" Reinforced Concrete Sidewalk, complete
and in place
for _______________ Dollars
and Cents per square foot
LS Furnish and Install all necessary Erosion and Sediment Control
Measures {Silt Fencing) complete and in place
for Dollars
=an""'d.,__ __________ Cents lump sum.
SUB-TOTAL:
{ITEMS 1-4)
10% CONTINGENCY
TOTAL ESTIMATED CONSTRUCTION COSTS:
$800.00 $72.00
$6.00 $300.00
$4.00 $15,408.00
$1,000.00 $1,000.00
$16,780.00
$1,678.00
$18,458.00