Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Cost Estimate
NO. 1 2 3 4 5 6 7 8 9 Engineer's Cost Estimate-Rev. I A&M SUPER STORAGE UTILITY IMPROVEMENTS 17309 S.H. No. 6 SOUTH COLLEGE STATION, BRAZOS COUNTY, TEXAS DESCRIPTION QUANTITY UNIT WATER IMPROVEMENTS Mobilization & Trench Safety (Water Line) 1 LS 12" PVC Water Line (C909, CL 200) 505 LF 12" PVC Water Line (C909, CL 200) w/Structural 330 LF Backfill 6" PVC Water Line (C909, CL 200) w/Structural 93 LF Backfill Tie to Existing 12" PVC Water Line 1 LS 12" (MJ) Gate Valve & Box 3 EA 6" (MJ) Gate Valve & Box 3 EA 0.1. Fittings (Class 350) , 1 LS Standard Fire Hydrant Assembly 3 EA UNIT COST $3,500.00 $30.00 $35.00 $22.00 $750.00 $1,200.00 $600.00 $1,750.00 $2,100.00 TOTAL COST $3,500.00 $15,150.00 $11,550.00 $2,046.00 $750.00 $3,600.00 $1 ,800.00 $1,750.00 $6,300.00 SUB-TOTAL= $46,446.00 10% CONTINGENCY= $4,644.60 ESTIMATED CONSTRUCTION COST = $51,090.60 OFFIF AX: (979) 690-0329 E-mail: civil@rmengineer.com CD1-213-0308-E02 1of1