Loading...
HomeMy WebLinkAboutStaff CommentsSTAFF REVIEW COMMENTS NO. 1 Scott & White Hospital (NRA) — NRA Review 11-00500006 PLANNING 1) Please include the following required information in the title block of all sheets: a. Name, address, location, and legal description (as it will be platted). b. Name, address and telephone number of the applicant/owner. c. Name, address and telephone number of the engineer. d. Date of submittal (corrected). e. Total site area. 2) Please include the following information on the plan sheets (there is a sample matrix in the Unified Development Ordinance Section 7.9.B.3.c. that may be helpful). a) Total vertical square footage (for each fagade separately) b) Total vertical square footage of each building material (for each fagade separately) and its percentage c) Total vertical square footage of each color (for each fagade separately) and its percentage 3) Please include elevations of screening structures on site and the materials and colors to be used. 4) Are the hospital and CUP buildings a single structure? 5) Please indicate on the plans how each fagade is providing the required architectural relief specified in Section 7.9.2 "Building Mass & Design" of the Unified Development Ordinance. For the purposes of this section, the north, south and west facades are considered to be "facing public right-of-way." 6) Section 7.9.E.1. requires fagade articulation (wall plane projections or recessions with a minimum depth of 4 feet) on the first two (2) stories of any fagade facing a public right-of- way (north, south, west). No more than 33% of any fagade facing a public right-of-way can be on the same continuous geometric plane. 7) Section 7.95.2 requires that all facades facing a public right-of-way (north, south, west), have a minimum of 50% masonry (not split faced or smooth cmu). Reviewed by: Jennifer Prochazka Date: January 30, 2011 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. A temporary blanket easement will be required to extend the underground primary up to the hospital since it is not in a dedicated easement. 2. An additional 10' along the State Hightway feeder road to insure a 35' easement from the common corner of the Scarmardo tract down to Lakeway Drive. 3. Developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. 4. Continue the 35' easement from Lakeway down to the common corner of the Bert Wheeler parcel, to allow for water, sewer, cable, telephone, gas and (2) electrical utilities separate underground lines. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull boxes and secondary pedestals provided by CSU). 8. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to: wdavis@cstx.gov, or ehorton@cstx.gov. 9. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. 10. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. 11.To discuss any of the above. electrical comments please contact Weldon Davis at 979.764.5027 or Eric Horton at 979.764.6280. Reviewed by: Weldon Davis Date: 1.26.11 TxDOT Comments 1. No Comment (not applicable) Reviewed by: Chad Bohne Date: January 27, 2011