HomeMy WebLinkAboutStaff CommentsENGINEERING COMMENTS NO. 1 1. EC-01 -Should erosion control be added at the pond discharge points? Revised accordingly. 2. EC-01 -Should there be stabilized construction entrances at each of the ponds rather than on Backwater Ln., which is existing? Revised accordingly. 3. Please provide a Letter of Acknowledgment noting any deviations from our standards. Attached. 4. Please provide a Cost Estimate with construction costs related to public infrastructure only. Attached. 5. GP-01-04 -Please label the side slopes in all areas that are being regraded. No longer applicable due to reduced Scope of Work. 6. GP-03 -Please maintain a minimum 0.5% slope along the concrete flume. The slope (0.28%) shown in Pond #2 is the maximum that can be achieved due to existing elevations between the box culvert of Creek Meadow Blvd and upstream to the storm sewer discharge at the cul-de-sac of Cripple Creek Court. This deviation is cited in the B/CS Letter of Acknowledgement. 7. GP-04 -In the area where pipes will be surcharged, please label the flowline elevations at the inlets upstream. No longer applicable due to reduced Scope of Work. 8. GP-04 -Water-tight rings are required to be added on the surcharged pipes. Please show and label water-tight rings and add a detail & spec for their installation. No longer applicable due to reduced Scope of Work. 9. GP-04 -Please label the existing and proposed 100-yr WSE. No longer applicable due to reduced Scope of Work. 10. GP-04 -It looks like the proposed normal water level is higher than the top of the 18- inch discharge pipe. Is this pipe going to be plugged or removed? Correct. This is an existing low-flow drain pipe. During small rainfall events the low-flow pipe is only engaged. During substantial rainfall both the low-flow pipe and the spillway is engaged to meter flow from Pond #1. 11 . MD-01 -Please clarify why the weir structures for Ponds 1 & 4 are being modified. No longer applicable due to reduced Scope of Work. 12. MD-01 -Please label the modified weir details with flowlines/elevations. No longer applicable due to reduced Scope of Work. Reviewed by: Erika Bridges Date: 4/5/12