HomeMy WebLinkAboutCost EstimateNO.
1
2
3
4
5
6
Engineer's Cost Estimate
CREEK MEADOWS -SECTION lA, lB, 2, 3, & 4
DETENTION, GRADING & DRAINAGE IMPROVEMENTS
COLLEGE STATION, BRAZOS COUNTY, TEXAS
UNIT
DESCRIPTION QUANTITY UNIT COST
Mobilization, Construction Staking, All Required LS $2,500.00 Testing by Contractor & Trench Safety
SWPP Measures (Rock Rip-Rap, Silt Fencing, 1 LS $5,500.00 Construction Entrance, Hydro-Seeding)
Clearing, Grubbing & Demolition 1 LS $1 ,000.00
In-Place Earthwork Excavation 125 CY $4.00
In-Pace Earthwork Embankment (Excavated On-350 CY $6.50 Site & Imported Common Fill)
4' Wide Concrete Pilot Channel (Includes Flumes & 485 SY $10.00 Interceptors)
ESTIMATED CONSTRUCTION COST=
10% CONTINGENCY=
TOTAL
COST
$2,500.00
$5,500.00
$1 ,000.00
$500.00
$2,275.00
$4,850.00
$16,625.00
$1 ,662.50
GRAND TOTAL= $18,287.50
,
RME Consulting Engineers
TEXAS FIRM REGISTRATION No. F-4695
POST OFFICE BOX 9253
COLLEGE ST A TION, TEXAS 77842
OFF/FAX: (979) 764-0704
E-mail: civil@rmengineer.com
Estimates and projections prepared by RME Consulting Engineers relating to construction costs and
schedules, operation and maintenance costs, equipment characteristics and performance, and operating
results are based on this office's experience, qualifications and judgment as a design professional. Since
RME has no control over weather, cost and availability of labor, material and equipment, labor
productivity, construction contractor's procedures and methods, unavoidable delays, construction
contractor's methods of determining prices, economic conditions, competitive bidding or market
conditions and other factors affecting such estimates or projections, this office does not guarantee that
actual rates, costs, performance, schedules, etc., will not vary from estimates and projections prepared by
the Engineer of record.
CD1-260-0454-E02 1 of 1