Loading...
HomeMy WebLinkAboutCost Estimate (2)NO. 1 2 3 4 5 6 Engineer's Cost Estimate CREEK MEADOWS -SECTION lA, lB, 2, 3, & 4 DETENTION, GRADING & DRAINAGE IMPROVEMENTS COLLEGE STATION, BRAZOS COUNTY, TEXAS UNIT DESCRIPTION QUANTITY UNIT COST Mobilization, Construction Staking, All Required 1 LS $2 ,500.00 Testing by Contractor & Trench Safety SWPP Measures (Rock Rip-Rap, Silt Fencing, 1 LS $5,500.00 Construction Entrance, Hydro-Seeding) Clearing, Grubbing & Demolition 1 LS $1 ,000.00 In-Place Earthwork Excavation 125 CY $4.00 In-Pace Earthwork Embankment (Excavated On-350 CY $6.50 Site & Imported Common Fill) 4' Wide Concrete Pilot Channel (Includes Flumes & 485 SY $10.00 Interceptors) ,,,,,, ESTIMATED CONSTRUCTION COST= 10% CONTINGENCY= TOTAL COST $2,500.00 $5,500.00 $1 ,000.00 $500.00 $2,275.00 $4,850.00 $16,625.00 $1 ,662.50 GRAND TOTAL= $18,287.50 , RME Consulting Engineers TEXAS FIRM REGISTRATION No. F-4695 POST OFFICE BOX 9253 COLLEGE ST A TION, TEXAS 77842 OFF/FAX: (979) 764-0704 E-mail: civil@rmengineer.com Estimates and projections prepared by RME Consulting Engineers relating to construction costs and schedules, operation and maintenance costs, equipment characteristics and performance, and operating results are based on this office's experience, qualifications and judgment as a design professional. Since RME has no control over weather, cost and availability of labor, material and equipment, labor productivity, construction contractor's procedures and methods, unavoidable delays, construction contractor's methods of determining prices, economic conditions, competitive bidding or market conditions and other factors affecting such estimates or projections, this office does not guarantee that actual rates, costs, performance, schedules, etc., will not vary from estimates and projections prepared by the Engineer of record. CD1-260-0454-E02 1 of 1