Loading...
HomeMy WebLinkAboutAcknowledgement of City Standards' July 16, 2012 Erika Bridges, E.I.T. Graduate Civil Engineer City of College Station 1101 Texas Avenue South College Station, TX 77842 7607 Eastmark Drive, Ste. 252 <77840> P.O. Box 9253, College Station, TX 77842 Off/Fax: (979) 764-0704 email: civil@rmengineer.com RE: Creek Meadows -Grading & Drainage Improvements (Pond 1 & 2) Acknowledgement of City Standards RME No. 260-0454 Erika Bridges: The purpose of this letter is to acknowledge that the construction plans for the public infrastructure improvements, for the above referenced project, to the best of my knowledge, do not deviate from the latest B/CS Design Guideline Manual. With the exception of the following items: •!• The four (4) foot wide concrete pilot channel installed in the bottom of the Detention Pond #2 does not meet the minimum longitudinal slope of 0.50%. The proposed concrete pilot channel is specified at a longitudinal slope of 0.28%, based on the existing elevations and design constraints of drainage system that cannot be changed; •!• The typical bottom slope of the detention pond built in this phase of construction does not meet the minimum cross slope of 5.00%. The Detention Ponds (Pond #1 & #2) are specified with a bottom cross-slope of 1.00%, based on design constraints of the detention pond that cannot be changed, or remain unchanged. I also acknowledge, to the best of my knowledge that the details provided in the construction plans are in accordance with the B/CS Standard Details. ve any questions. CD l-260-0454-L03 Page 1of1