MEMORANDUM
January 7, 2011 9\ _�1— l 1
TO: Renee Lane Development via email Brandofi@trilcaprrealty.com
FROM: Molly Hitchcock, AICP
Planning Administrator
SUBJECT: EDELWEISS RIDGE (FP-REPLAT)
I reviewed the above -mentioned FINAL PLAT - RESIDENTIAL application turned in for the
January 5th deadline and determined it to be incomplete. The following is the preliminary list of
items needed to complete the Submittal so that staff may conduct a thorough review. Please
submit the following information by 10 a.m. on any Monday for review that week:
Clear and consistent identification of the property owner. The application, final
plat document, and title report all identify a different owner.
The property owner's signature on the application and the proof of authority for
that person to sign on behalf of the partnership or trust. If the owner is Renee Lane
Development, LP, the proof of authority for Joobin Choobineh to sign on behalf of Leman
Enterprises Casa Verde, Inc. will be required.
A new title report current within 90 days or a nothing further certificate current
within 90 days to supplement the submitted title report.
An original tax certificate.
Please be aware that if this application is not completed before February 21, 2011, it will expire
and a new application and fees will be necessary to continue the platting process.
If you have any questions or need additional information, please call me at 979 4.3570.
7/ �-[I
cc: Jeff Robertson @ McClure and Browne Engineering via email jeffr@mccll�rebrowne.com
Case file No. 11-00500001
January 10, 2011
Renee Lane Development, LP., via email: bra ndonatricaprealty.comV
TO:
FROM:
SUBJECT:
CITY OF COUEGE. ST°\TION
Home of Texas A&M Univeniry�*
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842 , rV%
Phone 979.764.3570 / Fax 979.764.3496 k:/
MEMORANDUM
Molly Hitchcock, AICP
Planning Administrator
EDELWEISS RIDGE (FP-REPLAT)
Thank you for the submittal of the tax certificate and authority to sign. Please be aware that this
project will not be scheduled for consideration by the Planning & Zoning Commission until after
a nothing further certificate current within 90 days has been submitted.
This project will be distributed to staff this week for their review.
cc: McClure& Browne Engineering (Jeff Robertson), via fax 979.693.2554 J(1(1 ,
Case file no. 11-00500001 01-11,1I
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. All easements on site are existing. Electric facilities will be designed within existing
easements.
2. Developer provides temporary blanket easement for construction purposes or provides
descriptive easements for electric infrastructure as designed by CSU for electric lines (where
applicable, including street lights)
3. Developer may be responsible for locating easements on site to insure that electrical
infrastructure is installed within easement boundaries.
4. If applicable, the following easements will be required: None
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser.
4. Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required.
5. If conduit does not exist at designated transformer or other existing devices, developer will
furnish and install conduit as shown on CSU electrical layout.
6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU
specs and design.
7. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull
boxes and secondary pedestals provided by CSU).
8. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to:
wdavis@csbc.gov.
9. Developer provides load data to CSU as soon as it is available to avoid construction delays.
Delivery time for transformers not in stock is approximately 40 weeks.
10. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as
designed by CSU.
11. To discuss any of the above electrical comments please contact Weldon Davis at
979.764.5027 or Eric Horton at 979.764.6280.
Reviewed by: Weldon Davis Date: 1.12.11
ADDRESSING
1. Please rename Amanda Ln. The name sounds too much alike other names used in the City or
County.
Reviewed by: Mandi Alford Date: January 12, 2010
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: January 12, 2011
TxDOT Comments
1. No Comment (off state system, no anticipated impact)
Reviewed by: Chad Bohne Date: January 12, 2011
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review. 2 of 2