Loading...
HomeMy WebLinkAboutTCEQJuly 21 , 2008 Jimmy Easterly Managing Member The Summit Crossing, LLC 4002 Aspen Dr. Bryan, TX 77802 P.O. Box 9253, College Station, TX 77842 Off/Fax: (979) 690-0329 email: civil@rmengineer.com RE: University Summit, Phase One -NOi & SWPP Packet Final Plat & Engineering RME No. 227-0341 Jim Easterly: Please find attached three (3) copies (1 -24x36 and 2 -1lxl7) of the referenced SWPPP and two (2) copies of its associated Construction Site Notice and NOi with one (1) copy of the Payment Submittal Form. Please provide one full-size copy of the SWPPP, signed and completed Construction Site Notice ~md NOi to the TCEQ as directed below, and retain one copy of each for your records. Near the middle of page one of the :~OI, please complete the area requesting the e-pay voucher number or the check/money order number and name on the check/money order. The TCEQ requires that the permit document:. and the payment for the application fee be processed separately. Application fees have increased to $225.00 for NOI's submitted on-line or $325.00 for mail-in forms. Both fees may b;! paid on-line at https://www6.tceg.state.tx.us/epay/. Next, proceed to Section E and sign where indicated for certification. (Please note: The individual who signs in Section E must be authorized to sign for the permitted entity, according to 30 Texas Administrative Code §305.44, and is considered the Site Operator who is solely liable for all inspection reports and maintenance required by TCEQ, unless a Letter of Delegation is issued to the Site Operator's Representative responsible for all inspection reports and maintenance of the SWPPP). Submit the signed and completed NOi on-line per the instructions given at http://www6.tc•~g.state.tx.us/steers/ or mail a signed copy of the NOi to: Texas Commission on Envir:mmental Quality Storm Water Processing Cer.ter (MC228) P.O. Box 13087 Austin, Texas 78711-3087 If mailing the payment fo r the application fees, complete the Payment Submittal Form as directed, staple the check/money order for the $325.00 or $225.00 mail-in application fee where indicated and mail to: CDl-227-034 l-L04 Page I of2 Texas Commission on Enviro:1Illental Quality Financial Administration Division Cashier's Office, MC-214 P.O. Box 13088 Austin, Texas 78711-3088 P.O. Box 9253, College Station, TX 77842 Off /Fax: (979) 690-0329 email: civil@rmengineer.com Finally, be sure to post a laminated copy of the half-sized SWPPP, signed NOI and Construction Site Notice at the construction site, at a location visible from the Right-of-Way. Please note that NOI's submitted on-line are valid immediately following submission and NOI's mailed to the TCEQ are considered valid seven (7> days after postmarked. If you have questions regarding the process for on-line payments or on-line submission of NO I's, please see the TCEQ website at http://www.tceq.state.tx.us/ or call the Storm Water Quality Division at (512) 239-4671. Please contact us should you have any other questions. Sincerely, Rabon A. Metcalf, P .E. rabon@rmengineer.com CD l-227-034 l-L04 Page 2 of2 , Notice of Intent (NOi) for Storm Water Discharges Assoc:iated with Construction Activity under TPDES General Permit (TXR150000) TCEQ Office Use Only Permit No.: TXR15 RN: CN: Ref No: Sign up now for ePermits 'JOI at bttps://www6.tceg.state.tx.us/steers/ Get Instant Permit Covemge and only pay a $225 application fee. If filing a paper NOi you can pay tile application fee on line? Go to https://www6.tccq.statc.tx.us/epay/ IMPORTANT: •Use the INSTRUCTIONS to fill out each questirn in thjs form. •Use the attached CUSTOMER CHECKLIST to make certain all you filled out all required information. •Incom lete a lications WILL dela a roval or result in automatic Denial. Renewal of General Permit Is this NOI to renew an ACTIVE permit? 0 Yes -What is your permit number? Permit No. TXRts _______ _ 0 No - a permit number wjll be issued. Application Fee if mailing a paper NOi: You must pay the S325 Application Fee to TCEQ for the application to be considered complete. Payment and NOi must be mailed to separate addresses. See instructions for correct mailing addresses. Provide your payment information below, for us to verify payment of the application fee: O Mailed: Check/Money Order No.: Company Name on checking account: O EPAY: Voucher No.: ls the Payment Voucher copy attached? oYes A. OPERATOR (applicant) I. If the applicant is currently a customer with TCEQ, what is the Customer Number (CN) issued to this entity? CN ( carch Central Re ist ) 2. What is the Legal Name of the entity (applicant) applying for this permit? Rhodes Building Systems, Inc. (The legal name must be spelled exactly as filed with the Texas Secrl'lary of State, County, or in the legal document forming the entity.) 3. What is the name and title of the person signing the application? (The person must be an official meeting signatory requirem(:nts in TAC 305.43(a).) Name: Jimmy Easterly Job Title: Managing Partner 4. What is the Operator's (applicant) mailing add ress as recognized by the US Postal Service? ("·erify at USPS.com) Address: 4002 Aspen Drive City: Bryan Country Mailing Information (ifoutside USA). 5. Phone No.: ( 979 ) 218-6775 6. Fax No.: ( ) 7. Indicate the type of Customer: D Individual 0 CorporatiOn D State Government Dother Government TCEQ-20022 (03/05/2008) Suite No./Bldg. NoJMail Code: State: TX ZlP Code: 77802 Country Code: Postal Code: Extension: E-mail Address: jimeasterly@gmail.com D 3ole Proprietorship-D.B.A. 0 Federal Government O :::ounty Government 0Dther (describe): OLimited Partnership 0General Partnership Deity Government Page I 8. Independent Operator: [IJYes 0No (If governmental entity, subsidiary, or part of a larger corporation, check "No".) 9. Number of Employees: [?:)0-20; []21-100; 0101-250; 0251-500; or 050 I or higher I 0. Customer Business Tax and Filing Numbers (J'his item is not applicable to Individuals, Government, GP or Sole Proprietor.) REQUIRED for Corporations and Limited Partnerships ( \'erif~· the entity's status and filin~ no. with TX SOS at 5121463-5555) State Franchise Tax ID Number: Federal Tax ID: TX SOS Charter (filing) Number: DUNS Number (if known): B. APPLICATION CONTACT If TCEQ needs additional information regarding this application, who should be contacted? 1. Name: Rabon A. Metcalf, P.E. I Title: Owner I Company: RME Consulting Engineers 2. Phone No.: ( 979 ) 690-0329 Extension: 3. Fax No.: 979 690-0329 E-mail Address: rabon@rmengineer.com c. REGULATED ENTITY (RE) INFORMATION ON PROJECT OR SITE I. TCEQ Issued RE Reference Number (RN): RN (Search Central R~istn•) 2. Name of Project or Site (the name as known by the community where this facility/project is located): University Summit -Phase One (example: phase and name of subdivision or name of project !hat's unique to the site) 3. Does the site have a physical address? If Yes, complete Section A for a physical address. If No, complete Section B for site location information. Section A: Enter the physical address for the site. (verify it with USPS.com or other delivery source) Street Number: Street Name: City: ZIP Code: Section B: Enter the site location information. If no physical address (Street Number & Street Name), provi:ie a written location access description to the site: (Ex.: phase I of Woodland subdivision located 2 miles w~st from intersection of Hwy 290 & IH35 accessible on Hwy 290 South) Approx. 2000' west on FM 60 from the intersection of FM 158, located on the south side of the road. City where the site is located or nearest city to site: ZIP Code where site is located: College Station, TX 77840 4. Identify the county where the site is located: Brazos 5. Latitude: N 30.65771 Longitude: w 96.28880 6. What is the primary business of this entity? ln your own words, briefly describe the primary business of the Regulated Entity: (Do not repeat the SIC and NAlCS code) Commercial Development 7. What is the mailing address for the regulated e:ntity? ls the RE mailing address the same as the Operator? l!JYes, address is the same as Operator LJ No, provide the address Street Number: j Street Name: City: j State: j ZIP Code: D. GENERAL CHARACTERISTICS 1. Is the site located on Indian Country Lands? 0No 0Yes -If Yes, do not submit this NOi. Contact EPA, Region VI If the site is on Indian country lands, vou must obtain au1horization through EPA, Region VI. 2. What is the Standard Industrial Classification (SIC) code (see instructions for common codes): (Searrh Osha.go\') Primary: 1542 Secondary: TCEQ-20022 (03/05/2008) Page2 3(a) What is the total number of acres disturbed? 5.0 acres 3(b) Is the project site part of a larger common plan of development or sale? 0Yes l:JNo If Yes, the total number of acres disturbed can be less than 5 acres. If No, the total number of acres disturbed must be ~; or more. If the total number of acres disturbed is less than 5 then the project site does not qualify for coverage through this Notice of Lntent. Coverage will be denied. See the requirements in the general permit for small construction sites. 4. Discharge Information (all mforma io UST be provided or the permit w·u b denied) 4( a) What is the name of the water body( s) to receive the storm water runoff or potential runoff from the site? Carters Creek 4(b) What is the segment number(s) of the classifi~d water body(s) that the discharge or potential discharge will eventually reach? 1209C 4(c) Are any of the surface water bodies receiving discharges from the construction site on the latest EPA-approved CWA 303(d) list of impaired waters? 0 Yes 0No If Yes, provide the name of the impaired water bod::.ly!....l.::(s)t..:..-------------------------~-1 4(d) Is the discharge into an MS4? E]Yes 0No If Yes, what is the name of the MS4 Operator? City of-=C,,.o""'ll"'e""g.::;e....;:S::;.;ta=tio""n:..:.-_________________ _ Note: The general permit requires you to send a copy of the NOi to the MS4 Operator. 4(e) Is the discharge or potential discharge within the Recharge Zone, Contributing Zone, or Contributing Zone within the Transition Zone of the Edwards Aquifer? 0 Yes E]No If the answer is Yes, please note that a copy of the agency approved Plan required by the Edwards Aquifer Rule (30 TAC Chapter 213) must be included or referenced in the Stonn Water Pollution Prevention Plan. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-i E. CERTIFICATION Check "Yes" to the certifications below. Failure to certify to all items will result in denial. D Yes D Yes D Yes QYes I certify that I have obtained a copy and understand the terms and conditions of the general pennit (TXRl50000). I certify that the full legal name of tile entity (Operator) applying for this permit has been provided and is legally authorized to do business in Texas. I understand that a Notice of Termir1ation (NOT) must be submitted when this authorization is no longer needed. I certify that a storm water pollutior. prevention plan bas been developed and implemented prior to construction, and that is compliant with any appli ::able local sediment and erosion control plans and prepared and implemented as reauired in the general permit TXRI 50000. Operator Certification: I, Jjmmy Easterly Magagjgg Partger Typed or printed name (Required f mu!;f be legible) Title (Required .t legible) certify under penalty oflaw that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering th~ information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. proof of such authc:ri~a on u o ~ \aA (} I further certify thal\~ amth rized under 30 Texas Administrative Code §305A4 to sign and submit this document, and can provide documentation in Signature: / 1~ Date: /b~ 6'~ 00 I (Use bl~nk) TCEQ-20022 (~ 008) Page3 ----_. ----.--... ______ ·---,_:: ... ~ .. ::: -----.."':---.....___ CONSTRU<~TION SITE NOTICE FOR THE Texas Commis~;ion on Environmental Quality (TCEQ) Storm Water Program TPDES GENERAL PERMIT TXR150000 The following information is posted in compliance with Part Il.D.2. of the TCEQ General Permit Number TXR150000 for discharges of storm water :~unofffrom construction sites. Additional information regarding the TCEQ storm water permit program may be found on the internet at: · http://www.tceq.state.tx.us/permitting/water quality/stormwaterffXR 15 AIR.html -- Contact Name and Phone Number: Jimmy Easterly (979) 218-6775 Project Description: University Summit -Phase One On the south side of FM 60 approximately 2,000 feet west of its (Physical address or description of the site's intersection with FM 158. location, estimated start date and projected und date, or date that disturbed soils will be Estimated Start Date: 8/15/2008 stabilized) Estimated End Date: 8/15/2009 Location of Storm Water Pollution 3060 Development, LLC 4002 Aspen Dr. Prevention Plan : Bryan, TX n802 For Construction Sites Authorized Under Part 11.D.2. (Obtaining Authorization to Discharge) the following certification must be completed: I Jimmy Easterly (Typed or Printed Name Person Completing This Certification) certify under penalty of law that I have read and understand the eligibility requirements for claiming an authorization under Part ll.D.2. of TPDES General Permit TXRI 50000 and agree to comply with the terms of this permit. A storm water pollution prevention plan has been developed and implemented according to permit requirements. A copy of this signed notice is suppli to the operator of the M84 if discharges enter an MS4 system. I am aware there are significant penalti for ov ding false information or for conducting unauthorized discharges, including the possibility of fine and imp ·so e t wing violations. Si Date Texas Commission on Environmental Quality General Permit Payment Submittal Form $325 for a paper Construction NOi Application Fee Use this fonn to submit your Application Fee only if you are mailing your payment. •Complete items I through 5 below: •Staple your check in the space provided at the bottom of this document. •Do not mail this form with your Nor form. •Do not mail this form to the same address as your NOi. Mail this form and your check to: BY REGULAR U.S. MAIL BY OVERNIGHT/EXPRESS MALL Texas Commission on Environmental Quality Texas Commission on Environmental Quality Financial Administration Division Financial Administration Division Cashier's Office, MC-214 Cashier's Office, MC-214 P.O. Box 13088 12100 Park 35 Circle Austin, TX 78711-3088 Austin, TX 78753 Fee Code: GPA General Permit: TXR150000 I. Check I Money Order No: 2. Amount of Check/Money Order: 3. Date of Check or Money Order: 4. Name on Check or Money Order: 5. NOi INFORMATION If the check is for more than one NOi, list each Project/5ite (RE) Name and Physical Address exactly as provided on the NOi. DO NOT SUBMIT A COPY OF THE NOi WITH THIS FORM AS IT CO JLD CAUSE DUPUCATE PERMIT ENTRIES. See Attached List of Sites ill more soace is needed, yo 1 may attach a list.) Project/Site (RE) Name: Project/Site (RE) Physical Address: Staple Check In This Space TCEQ-20134 (3/05/2008) Page I