Loading...
HomeMy WebLinkAboutApplicationFOR OFFICE USE ONLY CASE NO.: l'5 . 2.0 C ITY OF C m.LEGE STATIO Home ofTexa.r A&M Univmity" DATE SUBMITIED: 0 \ • '2.. 3 • l S TIME: \Q: Q 0 STAFF: _.f\~:l _______ _ DEVELOPMENT PERMIT APPLICATION MINIMUM SUBMITTAL REQUIREMENTS: [8J $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee. Fee is 1% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). D Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. [8J Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). Date of Optional Preapplication or Stormwater Management Conference SPECIAL FLOOD HAZARD AREA? 0 Yes [8J No (Zone A or Zone AE on FEMA FIRM panels) NAME OF PROJECT Creek Meadows Lift Station Improvements (Final Phase) ADDRESS LEGAL DESCRIPTION (Lot, Block, Subdivision) Creek Meadows -Master Planned Subdivision APPLICANT I PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name RME Consulting Engineers (c/o Rabon Metcalf) E-mail rabon@rmengineer.com Street Address PO Box 9253 ---------------------------------~ City College Station State TX Zip Code 77842 -------~ ------- Phone Number (979) 764-0704 Fax Number (979) 764-0704 ---------------- PROPERTY OWNER'S INFORMATION: Name Creek Meadows Partners, LP (c/o Chris Rhodes) E-mail chris.rhodes@oldhamgoodwin.com Street Address 2800 South Texas Avenue, Suite 401 City Bryan State TX Zip Code 77802 Phone Number (979) 268-2000 Fax Number ARCHITECT OR ENGINEER'S INFORMATION: Name Same As Applicant E-mail Street Address City State Zip Code Phone Number Fax Number 10/10 Page 1of4 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a pennit · issued. 2. The permit may be revoked if any false statements are made herem. 3. If revo ed. all work must cease un penn is re-fssued. 4. Development shall not be used or occup·ed un ·1 a C 'ficate of Occupancy is issued, 5. The permi v-111 expire if no significant work ts p ogressing within 24 months of issuance. 6. Other permits may be requ red to fulfill locaJ, state, and federal requirements Owner I obtajn or show compliance with all nece ry State and Federal Permits prior to coostruction including NOi and SWPPP. 7. If required, Elevabon Certificates will be proVided th eleva ions cenified during construction (forms a b pre- pour) and post construction. 8. Owner hereby g·. e con ent to City representatives to make reasonable mspectJons required to verify compliance. 9. If, stonnwater ml a on is required, including detention pond proposed part of this ProJect. 1t shall be designed and constructed first in the con llUction equence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of e City of Co lege Station, measures shall be taken to in ufe that all debns from construction. eros·on, and sedimenta ·on shall not be deposited in city s . or existing drainage faaltties. All development shall be In accordance 'th the plans and specificetio ubmitted to and approved by the City Engineer for the above named project All of the app icable codes and oromarn:es of the City of Col ege Station shall apply 11. The info lion and co ciusions con amed m the attached plans and supporting documents will comply with the current requirements of the City of College Station. Texas City Code, Chapter 13 and associated BCS Unified Design Guideltnes Technical Speciflca 'ons. and Standard Details. de elopment has n designed in acx:ordance with all appllcab!e codes and ordinances of the City of College Station and State and Federal Regulations. 12. Re ea of plan to (name or flrm) is authorized for bkfding purposes only. I unders1and that nal approval and release of plans and development for construction is contingen on contractors gnature on approved Development Permit 13. I, THE OWNER. AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOP ENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE. TRUE. ANO ACCURATE ---~ Pro .. I I Date Engineer Certification: 1. The project has been designed to ensure that slormwater mitigation, including de ention ponds. proposed a part of the project I be constructed rst m the construction sequence. 2. I ·n obtain or can show compliance with all necessary Local, State and ederat Permits prior to constructJon lncluding NOi and SWPPP. Des gn wlll not preclude compliance with TPDES: i.e., Project over 10 acres may require a edimentation ba · n 3. The information and conciusions contained in the attached plans and upporting document comp with the current requirements of the City of College Stabon, Texas City Code. Ch per 13 nd associated BCS Unified Design Guidelines. All development has been des19ned in accordance with all applicab e codes and ordinances of the City of College Station an State and Federal Regula ons. 4. I. THE ENGINEER, AGREE T AND CERTIFY THAT All STATEMENTS HEREIN, ANO IN ATTACHMENTS FOR TH ENT P RMIT APPLICATION, ARE. TO TH BEST OF MY KNOWLEDGE, TRUE, AND Date 0110 Pa 2of4 The following CERTIFICATIONS apply to development in Special Flood Hazard Areas. Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only Permits:* A. I, Not Applicable certify, as demonstrated in the attached drainage study, that the alterations or development covered by this permit, shall not: (i) increase the Base Flood elevation; (ii) create additional areas of Special Flood Hazard Area; (iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Code of Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor (v) increase Base Flood velocities. beyond those areas exempted by ordinance in Section 5.11 .3a of Chapter 13 Code of Ordinances. Engineer Date Initial D * If a platting-status exemption to this requirement is asserted, provide written justification under separate letter in lieu of certification. Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits: B. I, Not Applicable , certify to the following: (i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm. Engineer Date Additional certification for Floodway Encroachments: C. I, Not Applicable , certify that the construction, improvement, or fill covered by this permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments. Engineer Date 10/10 Page 3 of 4 Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate required). Residential Structures: D. I, Not Applicable , certify that all new construction or any substantial improvement of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-pour) and post construction. Engineer I Surveyor Date Commercial Structures: E. I, Not Applicable , certify that all new construction or any substantial improvement of any commercial, industrial, or other non-residential structure are designed to have the lowest floor, including all utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation Engineer I Surveyor Date OR I, Not Applicable , certify that the structure with its attendant utility, ductwork, basement and sanitary facilities is designed to be flood-proofed so that the structure and utilities, ductwork, basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the hydrostatic and hydrodynamic conditions. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. Engineer I Surveyor Date Conditions or comments as part of approval: Print Form 10/10 Page 4 of4