HomeMy WebLinkAboutApplicationFOR OFFICE USE ONLY
CASE NO.: l'5 . 2.0
C ITY OF C m.LEGE STATIO
Home ofTexa.r A&M Univmity"
DATE SUBMITIED: 0 \ • '2.. 3 • l S
TIME: \Q: Q 0
STAFF: _.f\~:l _______ _
DEVELOPMENT PERMIT APPLICATION
MINIMUM SUBMITTAL REQUIREMENTS:
[8J $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee. Fee is 1% of
acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior
to the issuance of any plans or development permit).
D Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
[8J Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
Date of Optional Preapplication or Stormwater Management Conference
SPECIAL FLOOD HAZARD AREA? 0 Yes [8J No
(Zone A or Zone AE on FEMA FIRM panels)
NAME OF PROJECT Creek Meadows Lift Station Improvements (Final Phase)
ADDRESS
LEGAL DESCRIPTION (Lot, Block, Subdivision) Creek Meadows -Master Planned Subdivision
APPLICANT I PROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name RME Consulting Engineers (c/o Rabon Metcalf) E-mail rabon@rmengineer.com
Street Address PO Box 9253
---------------------------------~
City College Station State TX Zip Code 77842
-------~ -------
Phone Number (979) 764-0704 Fax Number (979) 764-0704 ----------------
PROPERTY OWNER'S INFORMATION:
Name Creek Meadows Partners, LP (c/o Chris Rhodes) E-mail chris.rhodes@oldhamgoodwin.com
Street Address 2800 South Texas Avenue, Suite 401
City Bryan State TX Zip Code 77802
Phone Number (979) 268-2000 Fax Number
ARCHITECT OR ENGINEER'S INFORMATION:
Name Same As Applicant E-mail
Street Address
City State Zip Code
Phone Number Fax Number
10/10 Page 1of4
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a pennit · issued.
2. The permit may be revoked if any false statements are made herem.
3. If revo ed. all work must cease un penn is re-fssued.
4. Development shall not be used or occup·ed un ·1 a C 'ficate of Occupancy is issued,
5. The permi v-111 expire if no significant work ts p ogressing within 24 months of issuance.
6. Other permits may be requ red to fulfill locaJ, state, and federal requirements Owner I obtajn or show
compliance with all nece ry State and Federal Permits prior to coostruction including NOi and SWPPP.
7. If required, Elevabon Certificates will be proVided th eleva ions cenified during construction (forms a b pre-
pour) and post construction.
8. Owner hereby g·. e con ent to City representatives to make reasonable mspectJons required to verify
compliance.
9. If, stonnwater ml a on is required, including detention pond proposed part of this ProJect. 1t shall be
designed and constructed first in the con llUction equence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of e City of Co lege Station, measures shall be taken
to in ufe that all debns from construction. eros·on, and sedimenta ·on shall not be deposited in city s . or
existing drainage faaltties. All development shall be In accordance 'th the plans and specificetio ubmitted to
and approved by the City Engineer for the above named project All of the app icable codes and oromarn:es of the
City of Col ege Station shall apply
11. The info lion and co ciusions con amed m the attached plans and supporting documents will comply with the
current requirements of the City of College Station. Texas City Code, Chapter 13 and associated BCS Unified
Design Guideltnes Technical Speciflca 'ons. and Standard Details. de elopment has n designed in
acx:ordance with all appllcab!e codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Re ea of plan to (name or flrm) is authorized for bkfding purposes
only. I unders1and that nal approval and release of plans and development for construction is contingen on
contractors gnature on approved Development Permit
13. I, THE OWNER. AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEVELOP ENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE. TRUE. ANO
ACCURATE ---~
Pro .. I I
Date
Engineer Certification:
1. The project has been designed to ensure that slormwater mitigation, including de ention ponds. proposed a part
of the project I be constructed rst m the construction sequence.
2. I ·n obtain or can show compliance with all necessary Local, State and ederat Permits prior to constructJon
lncluding NOi and SWPPP. Des gn wlll not preclude compliance with TPDES: i.e., Project over 10 acres may
require a edimentation ba · n
3. The information and conciusions contained in the attached plans and upporting document comp with the
current requirements of the City of College Stabon, Texas City Code. Ch per 13 nd associated BCS Unified
Design Guidelines. All development has been des19ned in accordance with all applicab e codes and ordinances
of the City of College Station an State and Federal Regula ons.
4. I. THE ENGINEER, AGREE T AND CERTIFY THAT All STATEMENTS HEREIN, ANO IN ATTACHMENTS
FOR TH ENT P RMIT APPLICATION, ARE. TO TH BEST OF MY KNOWLEDGE, TRUE, AND
Date
0110 Pa 2of4
The following CERTIFICATIONS apply to development in Special Flood Hazard Areas.
Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only
Permits:*
A. I, Not Applicable certify, as demonstrated in the attached drainage study, that the
alterations or development covered by this permit, shall not:
(i) increase the Base Flood elevation;
(ii) create additional areas of Special Flood Hazard Area;
(iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway
and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can
also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or
areas where the depth of from the BFE to natural ground is 18 inches or greater;
(iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond
the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than
one foot per second without acceptable compensation as set forth in the City of College Station Code of
Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor
(v) increase Base Flood velocities.
beyond those areas exempted by ordinance in Section 5.11 .3a of Chapter 13 Code of Ordinances.
Engineer Date
Initial
D * If a platting-status exemption to this requirement is asserted, provide written justification under separate
letter in lieu of certification.
Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits:
B. I, Not Applicable , certify to the following:
(i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is
designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm.
Engineer Date
Additional certification for Floodway Encroachments:
C. I, Not Applicable , certify that the construction, improvement, or fill covered by this
permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments.
Engineer Date
10/10 Page 3 of 4
Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate
required).
Residential Structures:
D. I, Not Applicable , certify that all new construction or any substantial improvement
of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an
elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with
elevations certified during construction (forms at slab pre-pour) and post construction.
Engineer I Surveyor Date
Commercial Structures:
E. I, Not Applicable , certify that all new construction or any substantial improvement
of any commercial, industrial, or other non-residential structure are designed to have the lowest floor, including all
utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation
Engineer I Surveyor Date
OR
I, Not Applicable , certify that the structure with its attendant utility, ductwork,
basement and sanitary facilities is designed to be flood-proofed so that the structure and utilities, ductwork,
basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all
areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the
hydrostatic and hydrodynamic conditions.
Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-
pour) and post construction.
Engineer I Surveyor Date
Conditions or comments as part of approval:
Print Form
10/10 Page 4 of4