Loading...
HomeMy WebLinkAboutTCEQAugust 17, 2009 David Loflin Texas Commission of Environmental Quality Water Supply Division MC 153 P.O. Box 13087 Austin, TX 78711 P.O. Box 9253, College Station, TX 77842 Off/Fax: (979) 690-0329 email: civil@rmengineer.com RE: Creek Meadows (Section lA, Phase 4B) -College Station, TX TCEQ Exception Letter for Utility Improvements RME No. 202-0316 Mr. David Loflin: The above referenced project will install the following improvements within the distribution system of the Wellborn S.U.D.: •!• Approximately 869 linear feet of 6", and 4" PVC (C-909, Class 200) water line; •!• Applicable fire hydrants, services, valves & fittings. Design and construction of these improvements will be in accordance with the latest Bryan/College Station Unified Water & Sewer Design Guideline Manual, Standard Details, and Specifications and Chapter 290 of the TCEQ Rules & Regulations. This quantity of water line is less than 10% of the total length of water line within the City's current distribution system. Therefore, an exception for plan review is being requested for this project and its water system improvements. Please call should you have any questions or require assistance. Sincerely, xc: Erika Bridges, E.I.T. Graduate Civil Engineer City of College Station 1101 Texas Avenue South College Station, TX 77840 CD1-202-03 l 6-L6 l Page 1 of 1 PUBLIC WATER SYSTEM PLAN REVIEW SUBMITTAL FORM (Complete and Attach to Submittal Package) Date: August 17, 2009 TCEQ PWS Identification No.*: """02:..1.;..;:0:;..;:0'""1.;:;.6 ______ CCN No. or Application No. **:..;..11..:..;;3"'"'4'""0 ______ _ Water System Name: .:..:W:..::e~ll~b:.:::o.:..:rn~S.:..:.U:..:·.::D..:..· ------------------------- Water System Owner:_W=e=ll=b.=.o::...:rn-=-=S=-=.Uo..:..=D.:..... ________ Type of Entity'-: ...:S..._.U=.Do..:.. ________ _ Address: P.O. Box 250, Wellborn. TX 77881 Phone: (979) 690-9799 Responsible Official:-=S~te:.;v:...::e;.;.n""'C=a.=.st.:...-__________ Title: Manager County (system location): Brazos County Subdivision Sec., Phase, Unit, etc. Creek Meadows -Sect. 1A. Ph 4B __________________ Mechanism & Source of Financing:-'-P"""ri"""v..:::a~te"------------ Engineer: Rabon A. Metcalf, P.E. Registration Number:-=88::..:5::..:8::..:3=------------------ Firm Name: RME Consulting Engineers Phone: (979) 690-0329 Firm Address: P.O. Box 9253, College Station, TX 77842 Fax: (979) 690-0329 * If no PWS Number exists, the owner must submit a business plan, if required, in accordance with §290.39(f) and (g). ** If a required CCN number does not exist, an acceptable application to obtain a CCN number must be made before a project submittal can be technically reviewed. In addition, if a submittal is for a project located outside the CCN area, a CCN amendment application must be submitted before a project may be reviewed for construction approval. Please refer to 30 TAC Chapter 291 for additional information regarding CCNs. If this is a new (proposed) system, you must attach the following with this submittal: NOT APPLICABLE 0 Attach a list of all water utilities within % mile of the proposed service area boundaries 0 Copies of formal applications for service from each of the following 0 any municipality if the system is within its ET J; 0 any district or other political subdivision whose corporate boundaries are within % mile of the proposed service area boundaries 0 any other water service provider whose certificated service area boundary is within % mile of the proposed service area boundaries 0 Documentation that all application requirements including payment of fees were complied with. 0 Copies of written responses from each of the entities listed above. 0 Business plan, if required by 30 TAC 290.39(f) & (g). The business plan financial requirements for non-community water systems must confirm capital availability to construct the system according to TCEQ requirements. This would consist of a balance sheet that shows liabilities as well as assets, not just a bank confirmation of a deposit account. Alternatively, if the project is being constructed with loan funds, then a loan commitment letter from the lender specific to that project will suffice. 0 Justification for constructing a separate system (unless none of the entities listed above exist) 0 Plans and specifications with an engineering report all sealed by design engineer. Type of Project (please check the appropriate boxes): ./ Distribution System Modifications 0 Well completion data on previously approved well 0 Pressure Maintenance Facilities Modifications 0 Disinfection Facilities or Other Modifications 0 Preliminary Engineering Report w/o plans 0 Modification of Surface Water Treatment Plant 0 0 0 0 0 0 0 Storage Capacity Modifications Water Well Construction , Proposed Proposed Innovative Process Study Ground Water Treatment Plant, New Surface Water Treatment Plant, New Tex. Water Dev. Board Proj. No. _____ _ Other(PleaseExplain) _______________________________ _ IF THIS SUBMITTAL IS A REVISION OF PREVIOUSLY SUBMITTED PLANS, PLEASE ENTER THE ASSIGNED TCEQ LOG NUMBER: . Please call (512) 239-6960 if you have questions regarding this form. Your cooperation will help us provide better service. Additional helpful information and rules are available at our website: Rabon A. Metcalf, P .E. Printed Engineer's Name August 17, 2009 Date