Loading...
HomeMy WebLinkAboutAcknowledgement of City StandardsAugust 17, 2009 Erika Bridges, E.I.T. Graduate Civil Engineer City of College Station 1101 Texas Avenue South College Station, TX 77842 RE: Creek Meadows -Section lA, Phase 4B Acknowledgement of City Standards RME No. 202-0316 Erika Bridges: P.O. Box 9253, College Station, TX 77842 Off/Fax: (979) 690-0329 email: civil@rmengineer.com The purpose of this letter is to acknowledge that the construction plans for the public infrastructure improvements, for the above referenced project, to the best of my knowledge, do not deviate from the latest B/CS Design Guideline Manual. With the exception of the following items: •!• All segments of sanitary sewer line installed for this phase of construction except between MH 83 to MH 84, do not meet the minimum flow velocity of 2.0 ft/s at peak flow conditions. The design of this line complies with minimum size, type and slope, however, the low number of dwelling units discharging into this line prevents peak flows from reaching a flow velocity of2.0 ft/sin all proposed segments; I also acknowledge, to the best of my knowledge that the details provided in the construction plans are in accordance with the B/CS Standard Details. Please do not hesitate to call if you have any questions. Sincerely, CD l-202-03 l 6-L60 Page I of I