HomeMy WebLinkAboutLetter from BTU06/23/2009 13:58 979-694-4141
06/23/200g 12:16 9798215796
****•******• TM• •-U'OSE""9 '¥'0U ltMl:E '~
P. 0. Box 1()(10
Bryan, TX 77805
Ptionlt: 979-82, •5700
Fax; 979o82 i -5795
http:/lwww,btut111tl ... com
City of College Station
To whom it co:n.cems:
BAKER BEXCO
BTU LINE DESIGN
June 23, 2009
This is to i.ofon:n. you that Creek Meadows Partners have complied with 111.l ofBTU's
li:ne extension policy and bas ;iaid BTIJ an Aid T.n Construction equal to the amount B.'3k
for pi:::r BTU policy for Section 2 Phase lA in Creek Meadows Subdivision. They have
installed all of the underground conduit per our specifications and we have released the
job to install all conductors and cquipmei::i.t by BTU's crews.
If you have any questions please gjve me call.
Thank You
Tom .Brent
J::d~ Field Engineering and Job Scheduling Manager
tbrent(QJbtutili ti es. com
979-821-5773
Cell == 979-777-8051
PAGE 01/01
PAGE 01