HomeMy WebLinkAboutAcknowledgement of City StandardsJune 22, 2009
Erika Bridges, E.l.T.
Graduate Civil Engineer
City of College Station
1101 Texas Avenue South
College Station, TX 77842
RE: Creek Meadows -Section lA, Phase 4A
Acknowledgement of City Standards
RME No. 202-0316
Erika Bridges:
P.O. Box 9253, College Station, TX 77842
Off/Fax: (979) 690-0329
email: civil@rmengineer.com
The purpose of this letter is to acknowledge that the construction plans for the public
infrastructure improvements, for the above referenced project, to the best of my knowledge, do
not deviate from the latest B/CS Design Guideline Manual. With the exception of the following
items:
•!• All segments of sanitary sewer line installed for this phase of construction except
between MH 79 to MH 80 and MH 80 to MH 68, do not meet the minimum flow velocity
of 2.0 ft/s at peak flow conditions. The design of this line complies with minimum size,
type and slope, however, the low number of dwelling units discharging to this line
prevents peak flows from reaching a flow velocity of 2.0 ft/sin all proposed segments;
I also acknowledge, to the best of my knowledge that the details provided in the construction
plans are in accordance with the B/CS Standard Details.
Please do not hesitate to call if you have any questions.
Sincerely,
CDI-202-0316-L48 Pagel of 1