OFFSITE 24" WATER LINE ESTIMATE FOR OVERSIZE PARTICIPATION
Item
No.
1.00
I.OJ
l.02
l.03
1.04
l.05
l.06
l.07
2.00
Description
WATER LINE IMPROVEMENTS
August 26, 2010
MBESl NO. 10530005
Mobil ization and Storrnwater Pollution Prevention Plan (includes
installation and maintenance of erosion control structures
throughout the entire proj ect)
24" ANSI/A WW A Cl51 /A2 l.5, CL 200 DIP Water Line (i ncludes
installation, testing, and clean-up)
36" Steel Encasement (3/8" thick), Str. Backfill
24" Butterfly Valve
24"x45 deg Bend
6" Flush Valve
2" Blow-off Assembly
MISCELLANEOUS
2.0 I Silt Fence
2.02 Hydro Seeding with Fiber Mulch
3.00 BONDING
3.0 I Performance Bond
Estimated Quantity Estimated Estimated Total
Unit Cost Cost
l.00 LS $3,500.00 $3,500.00
l,577 LF $68.50 $I 08,024.50
60 LF $177.00 $10,620.00
l EA $5,475.00 $5,475.00
6 EA $ l ,544.00 $9,264.00
EA $1,000.00 $1,000.00
EA $750.00 $750.00
Subtotal Item 1.00: $138,633.50
1,557 LF $3.00 $4,67 1.00
2,595 SY $0.75 $1,946.25
Subtotal Item 2.00: $6,617.25
I EA $12,400.00 $12,400.00
Subtotal Item 3.00: $12,400.00
PROJECT COST: $1 57,650.75
SONOMA SUBDIVISION
OFFSITE 8" WATER LINE ESTIMATE FOR OVERSIZE PARTICIPATION
Item
No.
1.00
1.0 I
1.02
1.03
1.04
1.05
1.06
2.00
Description
WATER LINE IMPROVEMENTS
August 26, 2010
MBESI NO. 10530005
Mobilization and Stormwater Pollution Prevention Plan (includes
installation and maintenance of erosion control structures
throughout the entire project)
8" A WWA C909, CL 200 PVC Water Line (includes installation,
testing, and clean-up)
16" Steel Encasement (3/8" thick), Str. Backfill
8" M.J. Gate Valve
8"x45 deg Bend
2" Blow-off Assembly
MISCELLANEOUS
2.01 Silt Fence
2.02 Hydro Seeding with Fiber Mulch
Estimated Quantity Estimated Estimated Total
Unit Cost Cost
1.00 LS $3,500.00 $3,500.00
1,577 LF $14.00 $22,078.00
56 LF $53.00 $2,968.00
EA $1,012.00 $1,012.00
6 EA $327.00 $1,962.00
EA $750.00 $750.00
Subtotal Item 1.00: $32,270.00
1,557 LF $3.00 $4,671.00
2,595 SY $0.75 $1,946.25
Subtotal Item 2.00: $6,617.25
CONSTRUCTION COST: $38,887.25