Loading...
HomeMy WebLinkAboutEstimateSONOMA SUBDIVISION OFFSITE 24" WATER LINE ESTIMATE FOR OVERSIZE PARTICIPATION Item No. 1.00 I.OJ l.02 l.03 1.04 l.05 l.06 l.07 2.00 Description WATER LINE IMPROVEMENTS August 26, 2010 MBESl NO. 10530005 Mobil ization and Storrnwater Pollution Prevention Plan (includes installation and maintenance of erosion control structures throughout the entire proj ect) 24" ANSI/A WW A Cl51 /A2 l.5, CL 200 DIP Water Line (i ncludes installation, testing, and clean-up) 36" Steel Encasement (3/8" thick), Str. Backfill 24" Butterfly Valve 24"x45 deg Bend 6" Flush Valve 2" Blow-off Assembly MISCELLANEOUS 2.0 I Silt Fence 2.02 Hydro Seeding with Fiber Mulch 3.00 BONDING 3.0 I Performance Bond Estimated Quantity Estimated Estimated Total Unit Cost Cost l.00 LS $3,500.00 $3,500.00 l,577 LF $68.50 $I 08,024.50 60 LF $177.00 $10,620.00 l EA $5,475.00 $5,475.00 6 EA $ l ,544.00 $9,264.00 EA $1,000.00 $1,000.00 EA $750.00 $750.00 Subtotal Item 1.00: $138,633.50 1,557 LF $3.00 $4,67 1.00 2,595 SY $0.75 $1,946.25 Subtotal Item 2.00: $6,617.25 I EA $12,400.00 $12,400.00 Subtotal Item 3.00: $12,400.00 PROJECT COST: $1 57,650.75 SONOMA SUBDIVISION OFFSITE 8" WATER LINE ESTIMATE FOR OVERSIZE PARTICIPATION Item No. 1.00 1.0 I 1.02 1.03 1.04 1.05 1.06 2.00 Description WATER LINE IMPROVEMENTS August 26, 2010 MBESI NO. 10530005 Mobilization and Stormwater Pollution Prevention Plan (includes installation and maintenance of erosion control structures throughout the entire project) 8" A WWA C909, CL 200 PVC Water Line (includes installation, testing, and clean-up) 16" Steel Encasement (3/8" thick), Str. Backfill 8" M.J. Gate Valve 8"x45 deg Bend 2" Blow-off Assembly MISCELLANEOUS 2.01 Silt Fence 2.02 Hydro Seeding with Fiber Mulch Estimated Quantity Estimated Estimated Total Unit Cost Cost 1.00 LS $3,500.00 $3,500.00 1,577 LF $14.00 $22,078.00 56 LF $53.00 $2,968.00 EA $1,012.00 $1,012.00 6 EA $327.00 $1,962.00 EA $750.00 $750.00 Subtotal Item 1.00: $32,270.00 1,557 LF $3.00 $4,671.00 2,595 SY $0.75 $1,946.25 Subtotal Item 2.00: $6,617.25 CONSTRUCTION COST: $38,887.25