Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Cost Estimate
Item 1 2 3 4 5 6 7 8 9 10 11 12 13 14 COLLEGE HILLS ELEMENTARY SCHOOL RENOVATION 8" Waterline Preliminary Engineer's Estimate April 2008 Description Unit Quantity Unit Cost 8" PVC (AWWA C909-CL 200) w/ Struct. Embedment LF 289 $ 55.00 6" PVC IAWWA C909-CL 200) w/ Struct. Embedment LF 60 $ 50.00 Connect to ExistinQ 8" Waterline EA 1 $ 2,300.00 8" x 8" M.J. Tee EA 1 $ 800.00 8" MJ .. Gate Valve EA 6 $ 750.00 8" x 45° M.J. Bend EA 4 $ 700.00 8" x 6" M.J. Tee EA 3 $ 760.00 8" x 6" M.J. Reducer EA 1 $ 750.00 6" M.J. Gate Valve EA 2 $ 650.00 6" x 45° M.J. Bend EA 2 $ 600.00 8" x 4" M.J. Tee EA 1 $ 750.00 4" M.J. Gate Valve EA 1 $ 550.00 Standard Fire Hydrant Assembly EA 2 $ 3,000.00 Trench Safety LF 349 $ 5.00 Total Amount $ 15,895.00 $ 3,000.00 $ 2,300.00 $ 800.00 $ 4,500.00 $ 2,800.00 $ 2,280.00 $ 750.00 $ 1,300.00 $ 1,200.00 $ 750.00 $ 550.00 $ 6,000.00 $ 1,745.00 $ 43,870.00