Loading...
HomeMy WebLinkAboutDevelopment Permit12/17 /2007 10:57 FAX 9797643737 ;e .......... , i ~'" .. ,,.·,."·:". . ·~: . : ... . . : : . . . . :· .. ~o~:Q)~£STATioN ' pi,,_;-f&D<ti<l.p-•:~ SITE LEGAL DESCRIPTION: City of College Station Edelweiss Gartens Park Edelweiss Gartens Phase 8 CCS PARKS & REC. DEVELOPMENT PERMIT PERMIT NO. 07-107 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE ADDRESS: Corner of Victoria and Hartford DRAJNAGE BASIN: Lick Creek DATE OF ISSUE: December 12, 2007 OWNER: VALID FOR 12 MONTHS CONTRACTOR: City of College Station PO Box9960 College Station, Texas 77842 TYPE OF DEVELOPMENT: SPECIAL CONDITIONS: Full Development Permit All construction must be in compliance with the approved construction plans All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section 7.5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Jrdinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of ariy tree required to remain is also prohibited. Full Development Permit The Contractor shall take all necessary precautions to prevent slit and debris from leaving the immediate construction site in accordance with tl'le approved erosion control plan as well as tl'le City of College Station Drainage Policy and Design Criteria. If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet City, State and Federal requirements. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due tCI heavy machinery and/or equipment as wen as erosion, siltation or sedimentation resulting from the permitted work. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction. erosion, and sedimentation shall not be deposited , n city streets, or existing drainage facilities. I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. l 2-/!'L/07 I _Owner/A~o;?~to~ C>~~~ Date