Loading...
HomeMy WebLinkAboutCost Estimate; uem #I I 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 EDELWEISS GARTENS, PHASE 11 MBESI PRO.J #: 1059-0006 Engineer's Estimate of Construction Costs November 26, 2007 Description Unit Quantity Paving Construction Clearing and Grubbing (includes lot area) Ac. 14 Earthwork C.Y. 10,825 6" Lime Stabilized Subgrade (6% by wei!ilit) S.Y. 10,858 6" Crushed Limestone Base S.Y. 5,847 8" Crushed Limestone Base S.Y. 2,182 2" HMAC Surface Course (including prime coat) S.Y. 8,029 Concrete Curb and Gutter (all tvoes) L.F. 5,135 6" Reinforced Concrete Pavement S.Y. 473 4" Reinforced Concrete Sidewalk S.F. 14,635 Colored Sidewalk Ramps EACH 4 End/Road Markers EACH 3 Unit Price 1,500.00 7.50 3.6 8.35 10.25 10.00 10.25 39.00 3.50 615.00 250.00 Paving Subtotal D . S C rama2e •ystem onstruction 18" HDPE Pipe, (ADS, N-12 or approved equal w/water-L.F. 519 40.00 ti!ilit joints) Str. Backfill 24" HDPE Pipe, (ADS, N-12 or approved equal w/water-L.F. 705 48.00 tililit ioints) Str. Back.fill 30" HDPE Pipe, (ADS, N-12 or approved equal w/water-L.F. 155 55 .00 ti!!ht joints) Str. Backfill Standard I 0' Recessed Inlet EACH 4 3,500.00 Standard 5' Recessed Inlet EACH 6 2,750.00 Drainage System Subtotal w s c ater iystem onstruct1on 8" PVC, C909 Cl 200, Water Line, Str. Backfill L.F. 617 32.00 8" PVC, C909 Cl 200, Water Line, Non-Str. Back.fill L.F. 853 21.00 6" PVC, C909 Cl 200 Water Line, Str. Back.fill L.F. 608 24.00 6" PVC, C909 Cl 200 Water Line, Non-Str. Back.fill L.F. 598 20.00 Fire Hydrant Assembly EACH I 2,700.00 8"x8" M.J. Tee EACH I 450.00 8"x6" M.J. Tee EACH I 370.00 8" M.J. Gate Valve EACH 3 900.00 6" M.J. Gate Valve EACH 2 700.00 8"xl3" M.J. Anchor Coupling EACH 3 225.00 6"xl3" M.J. Anchor Coupling EACH 2 200.00 8"x45 deg. Bend EACH 12 325.00 6"xl 1.25 deg. Bend EACH 1 245.00 6"x45 deg. Bend EACH 4 245.00 2" BlowOffValveAssembly EACH 2 800.00 Water Service, 1.5" type K Conner, short side(< 20') EACH 11 750.00 Water Service, I" type K Conner, short side(< 20') EACH 5 600.00 Water Service, 1.5" tvoe K Copper, long side(> 20') EACH 18 1,600.00 Water Service, l" type K Conner, long side(> 20') EACH 1 1,450.00 Water System Subtotal I of2 Total 21 ,110 81 ,188 39,087 48,821 22,366 80,289 52,632 18,457 51,223 2,460 750 $418 384 20,760 33,840 8,525 14,000 16,500 $93 625 19,744 17,913 14,592 11,960 2,700 450 370 2,700 1,400 675 400 3,900 245 980 1,600 8,250 3,000 28,800 1,450 $121 129 Item # I 35 36 37 38 39 40 41 42 43 44 45 46 EDELWEISS GARTENS, PHASE 11 MBESI PROJ #: 1059-0006 Engineer's Estimate of Construction Costs November 26, 2007 Description Unit Quantity s s t c ewer >ys em onstru cti on 6" PVC, D-3034 SDR 26 L.F. 1,786 6" PVC, D-2241 SDR 26 L.F. 40 Str. Back:fill (5'-8' Deoth) L.F. 783 Str. Back:fill (8'-10' Depth) L.F. 761 Non-Str. Back:fill (5'-8' Depth) L.F. 171 Non-Str. Backfill (8'-10' Depth) L.F. 111 Standard Manhole, 0-6 ft. deen EACH 6 Extra Deoth for Manhole V.F. 10.7 Short Side 4" Sewer Service(< 20') EACH 19 Long Side 4" Sewer Service (>20') EACH 20 Trench Safety (sewer) L.F. 1.826 Unit Price 7.00 7.00 26.00 30.00 16.00 18.00 2,000.00 250.00 550.00 1,400.00 1.00 Sewer System Subtotal Erosion Control Construction Erosion Control Plan & Sedimentation Control (per Item 106) (includes silt fencing, construction exits, straw bale L.S. 1 15,000.00 barriers, inlet protection, grass seeding, and any other sedimentation control devices) Erosion Control Subtotal Total 12,502 280 20,358 22,830 2,736 1,998 12,000 2,683 10,450 28,000 1,826 $115,663 15,000 $15,000 Total Construction Cost f $763,800 The above construction estimate is based on the engineer's preliminary opinion of probable construction costs. This estimate constitutes our best judgment at this time. Please note that the engineer does not have any control over contractor or supplier workloads and the degree to which inflation may affect project costs between now and the bid date. During construction, additional features may become apparent as the work progresses, which will result in an increase in cost. -,~-L_iif::;. __ n,P-.E.--------1 ~1/!1°7 2 of2 ,... .... ,, .... ,,,,, --"':_~ ~ OF r12. \\\ _:~-<..t>-.... * ........... :+-'1~·,, ;;' * ..... ·· ... ii ,, ~ * :' .... * ~ ~······· .......................... : ...... ~ ~ JEFFERY L. ROBERTSON ~ ~·····:···························:·····~ ~ ~ :. 94745 :'fE,, .. ,~··.. ./µ;J 111 ~··.~(CENS~?..·0· ~ .;-It ''<S's "·········~ ..: \\\,!ONAL € ___ _ .. ,,,,,, ............