Loading...
HomeMy WebLinkAboutLetter of AckowlegementHester Engineering Company Civil Engineering Services 7607 Eastmark Drive, Suite 253-B College Station, Texas 77840 979-693-1100 mhester@hester-engr.com April 10, 2008 Josh Norton City of College Station Engineering Division P.O. Box 9960 College Station, Texas 77842 979-764-3570 Re: Horse Haven Estates Phase Four Construction Plan Submittal Dear Josh, The purpose of this letter is to acknowledge that the construction plans for the water, sanitary sewer, streets and drainage for the above referenced project, to the best of my knowledge, do not deviate from the B/CS Design Guideline Manual. Any alternate design or construction methodology is listed below. 1. The Notice of Intent (NOi) will be submitted by the Contractor. A Storm Water Pollution Prevention Plan (SW3P) has been prepared and is included in the construction plans with all required information. I also acknowledge to the best of my knowledge, that the details provided in the construction plans are in accordance with the Bryan/College Station Standard details. At your nvenience please review the plans and call to discuss. Attachments: Drainage Report 4-sets of Construction Plans 2-copies of Engineers Estimate Water System Analysis Sanitary Sewer Design Report f'( ( ·0'6 q:6{ o/o oi·LoD