HomeMy WebLinkAboutLetter of AckowlegementHester Engineering Company
Civil Engineering Services
7607 Eastmark Drive, Suite 253-B
College Station, Texas 77840
979-693-1100
mhester@hester-engr.com
April 10, 2008
Josh Norton
City of College Station Engineering Division
P.O. Box 9960
College Station, Texas 77842
979-764-3570
Re: Horse Haven Estates Phase Four
Construction Plan Submittal
Dear Josh,
The purpose of this letter is to acknowledge that the construction plans for the
water, sanitary sewer, streets and drainage for the above referenced project, to the best of
my knowledge, do not deviate from the B/CS Design Guideline Manual. Any alternate
design or construction methodology is listed below.
1. The Notice of Intent (NOi) will be submitted by the Contractor. A Storm Water
Pollution Prevention Plan (SW3P) has been prepared and is included in the construction
plans with all required information.
I also acknowledge to the best of my knowledge, that the details provided in the
construction plans are in accordance with the Bryan/College Station Standard details.
At your nvenience please review the plans and call to discuss.
Attachments:
Drainage Report
4-sets of Construction Plans
2-copies of Engineers Estimate
Water System Analysis
Sanitary Sewer Design Report
f'( ( ·0'6
q:6{
o/o
oi·LoD