Loading...
HomeMy WebLinkAboutTCEQNovember 7, 2008 David Loflin Texas Commission of Environmen1tal Quality Water Supply Division MC 153 P.O. Box 13087 Austin, TX 78711 P.O. Box 9253, College Station, TX 77842 Off/Fax: (979) 690-0329 email: civil@rmengineer.com RE: Creek Meadows: Section 5, Phase One -College Station, TX TCEQ Exception Letter for Water Improvements RME No. 202-0359 Mr. David Loflin: The above referenced project will install the following improvements within the distribution system of the Wellborn S.U.D.: •!• Approximately 1,589 linear feet of 8" & 6" PVC (C-909, Class 200) water line; •!• Approximately 429 linear feet of 3" PVC (DR 21, D2241, Class 200) water line; •!• Applicable valves & fittings. Design and construction of these improvements will be in accordance with the latest Bryan/College Station Unified Wate:r & Sewer Design Guideline Manual, Standard Details, and Specifications and Chapter 290 of the TCEQ Rules & Regulations. This quantity of water line is less than 10% of the total length of water line within the City's current distribution system. Therefore, an exception for plan review is being requested for this project and its water system improvements. Please call should you have any que:;tions or require assistance. Sincerely, Rabon A. Metcalf, P. xc: Carol Cotter, P.E. Development Services City of College Station 1101 Texas Avenue South College Station, TX 77840 CD 1-202-0359-L 10 Page 1 of 1 PUBLIC WATER SY:STEM PLAN REVIEW SUBMITTAL FORM (Complete and Attach to Submittal Package) Date: November 7, 2008 TCEQ PWS Identification No.*: .:.;02=-1.:..:0;..;::0~1-=-6 _____ CCN No. or Application No.**: .... 1"""13:;...4;;.;:0'-------- Water System Name: .=.;W~e:.!ll~b~o;!.!m~S::..:.U:!!.=D;.:... _______________ """"'."""_:-"."'" ___________ _ Water System Owner:_W.:..:...:e:..:..:ll=b=o.:..:m..:...=S.:..:.U::..:·:D.:..... ________ Type of Entity.:...: -=S~.U=-·:.:D~·--------- Address: P.O. Box 250, Wellborn, TX 77881 Phone: (979) 690-9799 Responsible Official: Steven Cast Title: Manager County (system location): Brazos County Subdivision Sec., Phase, Unit, etc. Creek Meadows -Section 5, Ph 1 _______________ __._Mechanism & Source of Financing:-=-P~ri:...:.v.=a.::te~---------- Engineer: Rabon A. Metcalf, P.E. Hegistration Number:.-=88:..;5::...;;8;;.;:3'---------------- Firm Name: RME Consulting Engineers _____ Phone: (979) 690-0329 Firm Address: P.O. Box 9253, College Station, TX 77842 Fax: (979) 690-0329 • If no PWS Number exists, the owner must submit a business plan, if required, in accordance with §290.39(f) and (g). -If a required CCN number does not exist, an acceptable application to obtain a CCN number must be made before a project submittal can be technically reviewed. In addition, if a submittal is for a project located outside the CCN area, a CCN amendment application must be submitted before a project may be reviewed for construction approval. Please mfer to 30 TAC Chapter 291 for additional information regarding CCNs. If this is a new (proposed) system, you must attach the following with this submittal: NOT APPLICABLE D Attach a list of all water utilities within % mile of the proposed service area boundaries D Copies of formal applications for service from each of the following D any municipality if the system is within its ET J; D any district or other political subdivision whose corporate boundaries are within % mile of the proposed service area boundaries D any other water service provider whose certificated service area boundary is within % mile of the proposed service area boundaries D Documentation that all application requirements including payment of fees were complied with. D Copies of written responses from each of the entities listed above. D Business plan, if required by 30 TAC 290.39(f) & (g). The business plan financial requirements for non-community water systems must confirm capital availability to construct the system according to TCEQ requirements. This would consist of a balance sheet that s'lows liabilities as well as assets, not just a bank confirmation of a deposit account. Alternatively, if the project is being constructed with loan funds, then a loan commitment letter from the lender specific to that project will suffice D Justification for constructing a separate system (unless none of the entities listed above exist) D Plans and specifications with an engineering report all sealed by design engineer. Type of Project (please check the appropriate boxes): ../ Distribution System Modifications D Well completion data on previously approved well D Pressure Maintenance Facilities Modifications D Disinfection Facilities or Other Modifications D Preliminary Engineering Report w/o plans D Modification of Surface Water Treatmert Plant D D D D D D D Storage Capacity Modifications Water Well Construction, Proposed Proposed Innovative Process Study Ground Water Treatment Plant, New Surface Water Treatment Plant, New Tex. Water Dev. Board Proj. No. _____ _ Other(PleaseExplain) ________________________________ _ IF THIS SUBMITTAL IS A REVISION OF PREVIOUSLY SUBMITTED PLANS, PLEASE ENTER THE ASSIGNED TCEQ LOG NUMBER: . Plec:1se call (512) 239-6960 if you have questions regarding this form. Your cooperation will help us provide better service. Additional helpful information and rules are available at our website: http://www. tceq.state. tx. us/permitting/waterpermludlp/anrev. html __ ,,,,,,, I hereby certify that the above information is, to the best of my knowledge, true and correcs--~~~~ .~: -~~~~ -. . ,.. .· . ,., * . : * :· * ~ Rabon A. Metcalf, P .E. November 7, 2008 ~: : ·:: ~-~oN •••• M.. ~~~ ·::] Printed Engineer's Name Date I. ·• ,3533 : : o;· .. :/C[NS<t-?.·~~-l 'b ¢' S • • • • • • • • G" 11 0 Revised 9/12/02 l\\ SiONAL 't_.°0--\1 ~ C:\USERS\USER\RME\PROJECTS\202-0359 CMP-SECTION S\ENGINEERING\ TCEQ FORM 10233-WAT~~"\)>)>~""Q°'V~L- November 7, 2008 Louis Heron ID, P .E. Texas Commission of Environmental Quality Plans & Specification Review MC 148 P.O. Box 13087 Austin, TX 78711-3087 RE: Chapter 317 Summary Transmittal Letter Permittee: City of College Station P.O. Box 9253, College Station, TX 77842 Off /Fax: (979) 690-0329 email: civil@rmengineer.com Permit Number: Lick Creek WWTP: WQ0010024-006 Project Name: Creek Meadows (Section 5, Phase One)-College Station, TX County: Brazm. County Grant No.: NIA Mr. Louis Heron: The purpose of this letter is to provide the TCEQ with the information necessary to comply with the requirements of Chapter 217.8(c) of the TCEQ's rules entitled, Design Criteria for Sewerage Systems. The necessary information includes: 1. Engineering Firm: RME Consulting Engineers 1391 Seamist Lane <77845> P.O. Box 9253 College Station, TX 77842 2. Design Engineer: Rabon A. Metcalf, P .E. Off/Fax: (979) 690-0329 3. Location: Brazos County, TX 4. Project Identifier: Creek Meadows: Section 5, Phase One -Paving, Drainage & Utility Improvements 5. Operator: City of College Station 6. Collection System: City of College Station -Pu.Jlic Utilities Department CD l-202-0359-L09 Page I of 2 fo\ m· \\·1 ·0 r;;A6 LU ,, . Creek Meadows (Section 5, Phase One) TCEQ Chap 217 Summary Transmittal Letter November 7, 2008 7. Plan & Specification Comp:tiance: Design and construction of these improvements are in accordance with the Bryan/College Station Unified Water & Sewer Specifications, Design Guidelines Manual, and Chapter 217 of the TCEQ Rules & Regulations. This sanitary sewer improvement project will be constructed with the City of College Station performing a technical review. Tue plans and specificatiom: which describe the project identified in this letter are in substantial compliance with ~ ll the requirements of Chapter 217. 8. Variances: No variances are being sougl:.t for these proposed sanitary sewer improvements. 9. Project Scope: The above referenced proje~t will install the following sanitary sewer improvements within the CCN of the City of College Station (CoCS): •:• Approximately 2,3331.inear feet of gravity sewer: o 8" & 6" PVC (SDR 26, D3034) & (SDR 26 Class 160); •:• Applicable manholes, cleanouts, and service leads; Sincerely, xc: CD I-202-0359-L09 Page 2 of2