Loading...
HomeMy WebLinkAboutWater System ReportWater System Report for Castlerock Subdivision College Station, Texas September 2006 Revised July 2007 Prepared For: DDH Investments, Inc. 4490 Castlegate Drive College Station, Texas 77845 (979) 690-7250 Prepared By: Civil Development, Ltd. 2033 Harvey Mitchell Parkway South College Station, Texas 77840 (979) 764-7743 GENERAL INFORMATION Location: The Castlerock Sub division is located on the south side of SH 40 in southern College Station near Arrington Road. Area: Land Use: Phases lA, lC, 2-8 = 73 .0 ac. 285 lots Phase 1B = 3.6 ac. 7 lots Single Family Residential (Phases lA, 1 C, 2-8) Commercial A-P (Phase lB) Note: The water system for Castlerock Subdivision was modified from its original design to include the commercial tracts along SH 40. Since the required fire demand for the commercial areas are significantly higher that in residential areas, the system was analyzed with the full fire demand at the hydrant that serves the commercial tracts. WATER SYSTEM ANALYSIS Design Criteria Domestic Demand: Avg. Demand: Peaking Factor: Peak Demand: Design Demand: 100 gpd per capita 2.67 persons per lot 267 gpd per lot 0.185 gpm 4.0 0.74 gpm 1.5 gpm Commercial Demand: 50 gpd per capita 30 persons/acre Peaking Factor 4.0 Fire Flow Demand: 2500 gpm at the single hydrant in Phase lB (lBFHl) Pipe: PVC DR-14 C909 Roughness Coeff: 150 Hydraulic Software: Haestad Methods Water CAD v.6.0 Primwy Water Supply: 24" line along SH 47 Existing City System Pressure Tests Flow Hydrant #: V-064 Flowrate: 1430 Adj. Hydrant#: R-030 Static Pressure: 102 psi (235 ft water) Residual Pressure: 102 psi (assume 100 psi or 23 1 ft. water) Analysis Summary Criteria Min. Pressure -static (psi) Min. Pressure -fire (psi) Max. Velocity (fps) Max. Length of 6" pipe (ft) (connected to 2_ 8 "on both ends) Max Length of 6 "pipe (ft) (not connected on both ends Max. Length of 3 "pipe (ft) Required 35 20 12 1500 800 500 Provided 94 .96 73 .72 10.09 1108 256 438 Applicable Exhibits: Exhibit A -City of Co llege Station Fire Flow Test Report Exhibit B -Water System Schematic Layout Conclusion Exhibit C -WaterCAD Model -Domestic Flow Conditions Exhibit D -WaterCAD Model -Fire Flow Conditions The revised water system for Castlerock Subdivision Phases 1 A, 1 B, 1 C and 2-8 meets or exceeds all of the design criteria for the City of College Station. It will provide adequate water pressure and flowrate for both domestic and fire demands. '. ( 12/20/2005 09 :37 FAX 979 764 345 2 COLLhu C. ;'.) 11\.l l UN 1·uu . UTL. N ~(College Station Utilities ~ Rel/able, Affordable, Community Owned 1601 GRAHAM ROAD COLLEGE STATION TEXAS 77845 Date: 19 DECEMBER 2005 Number pages including cover sheet - 1 Fax number: 764-7759 Attention: JOE SCHULTZ Company: TEXCON From: Butch Willis Water Wastewater Division Phone: 979-764-3435 Fax: 979-764-3452 FLOW TEST REPORT Nozzle size: 2.5 inch Location: CASTLE GA TE AT HWY 40 Flow hydrant number: V-064 Pitot reading: 73 (GPM): 1430 Static hydrant number: R-030 Static PSI: 102 Residual PSI: 102 ~UUJ Exhibit A < I 0 (J\ ~ D (/) w L D D (/) _.,. ...... to L D (/) U1 ...... L 0 w ro -0 -.J CASTLEROCK SUBDIVISION PHASES 1-8 WATER SYSTEM SC HEMATIC LAYOUT CD L 0 ...... L ...... 0 f\) ,, I L 0 CD ~ [\) L ,_. -0 0 -0 [\) _.,. w ...... f\) J> ,, I w 2d1 w ...... L L 0 0 [\) \1) (J\ -0 w U1 (]\ L ro 0 (J\ T . RE"1SIONS "(( c~E~P.!!Po!!~!:M-* b'°!J!.:po~•L+===~~"°"!C==:Psc.=~i:· l!ij'°![l j2ro]!SCALC~ 2033 Marvey Mitchell Pan.way South College Ste11ion. Tens 77840 P.O. Box 11919. Co#ege Station. Te•as 77842 (979) 754.7743 Fa~: (979) 164-7759 Exhibit C Castlerock Subdivision, Phases 1-8 Water System Analysis -DOMESTIC FLOW July 13, 2006 Water CAD JUNCTION SUMMARY Computation of Lowest Pressure Label lAFHI 1AFH2 1BFH2 I Bl I lCFHl 1102 1103 1104 1107 1108 1109 lJlO 1101 2FHI 2FH2 2101 2102 2103 2104 2105 2106 2107 3FHI 3FH2 3101 3102 3103 4101 4102 5FH1 5FH2 5101 5102 6FH1 6101 7101 7102 8101 I ' Calculated _ Elov~tmn +~<m•nd ~ ~~~:;:" .. p,,,:~" _ 291 0.00 522.1 99.99 290 7.50 522.1 100.42 297 292.5 293 297 302 303 293 292 291 297 290 283 286 288 288 287 283 283 283 284 28 1 282 282 273 280 279 280 282 286 283 280 288 291 291 294 299 4.00 0.00 7.50 0.00 0.00 0.00 36.00 42.00 0.00 0.00 0.00 0.00 0.00 6.00 6.00 22.50 0.00 0.00 4.50 0.00 7.50 9.00 3.00 25.501 15.00 12.00 19.50 6.00 57.00 7.50 9.00 9.00 48.00 9.00 40.501 24.00 522.49 522.49 522.19 522.5 522.5 522.49 522.16 522.09 522.11 522.2 522.52 522.06 522.07 522.07 522.06 52 1.41 522.06 522.05 522.05 522.04 522.01 522 522.03 521.25 521.87 522 521.6 522 522.01 522 52 1.95 522.02 522.02 522.05 522.09 522.161 97.56 99.51 99.16 97.56 95.40 94.96 99.15 99.55 99.99 97.43 100.60 I 03.43 102.13 101.27 101.27 101.42 103.43 103.43 103.42 102.99 104.27 103.84 103.85 107.41 104.65 105.14 104.53 103.84 102.11 103.40 104.68 I 01.25 99.95 99.97 98.68 96.55 Lowest Pressure = 94.96 E:xhihit C Pa ~L' I or I Exhibit D Castlerock Subdivision, Ph ases 1-8 Revised Water System Analysis -FIRE FLOW July 13, 2007 * Note: Revision includes land use changes in Phases I B and IC to include commercial lots. Water CAD JUNCTION SUMMARY Computation of Lowest System Pressure Label I Elevation .. ft lAFHI 291 1AFH2 290 1BFH2 297 lBJl 292.5 lCFHI 293 1102 297 1103 302 1104 303 1107 293 1108 292 1109 291 1110 297 1101 290 2FH1 283 2FH2 286 2101 288 2102 288 2103 287 2104 283 2105 283 2106 283 2107 284 3FH1 28 1 3FH2 282 3101 282 3102 273 3103 280 4101 279 4102 280 5FH1 282 5FH2 286 5101 283 5102 280 6FHI 288 6101 291 7101 291 7102 294 8101 299 ' Demand 1--HGL _I Pressure -- ft I psi 0.00 472.40 78.48 7.50 472.20 78 .83 2,504.00 472.18 75.79 0.00 472.18 77.74 7.50 472.20 77 .53 0.00 473.41 76.33 0.00 473.40 74 .16 1 0.00 473.39 73.72 36.00 472.20 77.53 42.00 472.21 77.97 0.00 472.42 78.49 0.00 472.66 76.00 0.00 474.00 79 .61 0.00 472.22 81.87 0.00 472.32 80.61 6.00 472.20 79 .70 6.00 472.20 79.69 22.50 471.55 79.85 0.00 472.22 81.87 0.00 472.23 81.87 4.50 472.23 81.87 0.00 472.25 81.45 7.50 472.24 82.74 9.00 472.24 82.31 3.00 472.24 82 .31 25 .50 471.48 85.87 15.001 472.11 83 .12 12.00 472.221 83.60 19.501 471.82 82 .99 6.00 472.26 82 .31 57 .00 472.28 80.59 7.50 472.25 81.88 9.00 472.20 83.15 9.00 , 472.33 79 .75 48.00 472.33 78.45 1 9.00 472.40 78.48 1 40.50 472.46 77 .21 24 .00 472.36 75 .01 1 Lowest Pressure = 73.72 Exhibit [) l\1 ~L· I ,,j" I • ., . f • ' # .. Label I Length I -----· ----·---ft !Pl 212 lPlO 49 1P2 251 1P3 71 1P4 688 1P5 157 1P6 264 1P7 85 1P8 726 1P9 147 2Pl 289 2P10 281 2P2 110 2P3 438 2P4 264 2P5 511 2P6 263 2P7 49 2P8 267 2P9 296 3Pl 86 3P2 282 3P3 407 3P4 300 3P5 186 4Pl 256 4P2 354 5Pl 300 5P2 184 5P6 176 5P7 334 5P8 937 6Pl 298 6P2 455 6P3 469 7Pl 343 7P2 288 I 7P3 454 I I 8Pl 536 I 8P2 571 ; OS3 1199 I OS4 658 OS5 967 I Exhibit D Water CAD PIPE SUMMARY Computation of Highest Velocity Diameter Material Hazen--~illiams~ -I ---·-·--m 8 PVC 150.00 10 PVC 150.00 8 PVC 150.00 6 PVC 150.00 6 PVC 150.00 6 PVC 150.00 8 PVC 150.00 8 PVC 150.00 8 PVC 150.00 6 PVC 150.00 8 PVC 150.00 8 PVC 150.00 6 PVC 150.00 3 PVC 150.00 8 PVC 150.00 8 PVC 150.00 8 PVC 150.00 3 PVC 150.00 8 PVC 150.00 8 PVC 150.00 8 PVC 150.00 8 PVC 150.00 3 PVC 150.00 8 PVC 150.00 3 PVC 150.00 6 PVC 150.00 3 PVC 150.00 8 PVC 150.00 3 PVC 150.00 8 PVC 150.00 8 PVC 150.00 6 PVC 150.00 8 PVC 150.00 6 PVC 150.00 6 PVC 150.00 8 PVC 150.00 8 PVC 150.00 8 PVC 150.00 6 PVC 150.00 6 PVC 150.00 24 PVC 150.00 24 I PVC 150.00 24 i PVC 150.00 Discharge 1 Velocity I - --1 QDm ft/s 468.2 l 2.99 2469.3 10.09 -235.6 1.5 -56. l 0.64 -56.1 0.64 14.1 0.16 20.8 0.13 42.2 0.27 34.7 0.22 0.0 0 14.2 0.09 -133.5 0.85 -28.5 0.32 22.5 1.02 48.7 0.31 0.0 0 -48.7 0.31 4.5 0.2 -53.2 0.34 -112. l 0.72 -58.9 0.38 -24.4 0.16 25.5 1.16 -8.6 0.06 -15.0 0.68 31.5 0.36 19.5 0.89 -32.6 0.21 -9.0 0.41 -49.1 0.31 -55. l 0.35 21.4 0.24 -90.7 0.58 -2.0 I 0.02 46.0 0.52 101.7 0.65 -110.7 0.71 -151.2 0.97 81.4 0.92 -57.4 0.65 2937.5 2.08 468.2 0.33 468.2 I 0.33 Highest Velocity = 10.09 Exhibit D 1'~1ge 2 nr 2 I I ' I I I I I Sewer System Report for Castlerock Subdivision, Phases lA, lB, 1 C, 2A, 2B & 8 College Station, Texas September, 2006 Revised July 2007 Prepared For: DDH Investments 4490 Castlegate Drive College Station, Texas 77845 (979) 690-7250 Prepared By: Civil Development, Ltd. 2033 Harvey Mitchell Parkway South College Station, Texas 77840 (9 79) 764-7743 Location : General Land Use: Area: Design Criteria: GENERAL INFORMATION The Castlerock Subdivision, Phases lA, lB, lC, 2A, 2B and 8 are located on the south side of SH 40 in southern College Station near Castlerock Parkway. The area encompassed by Phase lB will be served by an existing 18" line that roughly parallels Spring Creek. This line was installed by the City of College Station several years ago and was intended to serve the entire area. All 7 lots that comprise this phase have direct access to this line. No additional sewer lines or manholes will be installed on that system with this project. Phase lC will involve the extension of 8" and 6" lines from the system that was built with Phase lA. It will be part of a larger system that will eventually include Phases 2A, 2B and 8 of the Castlerock Subdivision. This larger system was analyzed with the development of Phase lA. Since that time, the system has changed slightly to divide the original Phase 1B into Phase lB & lC. This analys is incorporates the changes since the original analysis was prepared. Phase lB Conm1ercial A-P Phase 1 C (and all others) Single Family Residential Phase lA (existing) = 13.4 ac. 30 lots Phase 1B 3.6 ac. 7 lots Phase lC 2.7 ac. 10 lots Phase 2A (future) 5.9 ac. 33 lots Phase 2B (fuhtre) 8.6 ac. 27 lots Phase 8 (fuhtre) 6.7 ac. 36 lots Primary Sewer Outfall: 18" sewer line along Spring Creek (Phase lB) 21" sewer line along Spring Creek (Phases 1 A, 1 C, 2A, 2B & 8) Commercial Demand (Phase JB): Avg. Pop Density: 30 people per acre Average Flow: 50 gpd/cap Peaking Factor: 4 Residential Demand (Phase JC): Avg. Pop Density: 2.67 people per lot Average Flow: 100 gpd/cap or 267 gpd per lot Peaking Factor: 4 Pipe: PVC D3034 SDR 26 Applicable Exhibits: Conclusion: Exhibit A -Sanitary Sewer System Schematic Exhibit B -Sanitary Sewer Analys is Spreadsheet The existing 18" line that will serve Phase lB was designed to include the flow from the area. This large line will easily handle the small flowrate from this development. The sewer system fo r Phases lA, 1 C, 2A, 2B and 8 of the Castlegate Subdivision, consists of a series of 6" and 8" lines that tie to the city's 21" trunk line along Spring Creek. The analysis in Exhibit B checks the calculated slope req uired to pass the estimated flow against the minimum slope required by TCEQ. The spreadsheet indicates the minimum required slope is much greater than the computed slope, so we conclude that the system is more than capable of carrying the anticipated flows from the development. (j) -I )> -I rn I G) I ~ )> -< +>-0 \1 -II !J\ ' ~ ~ ~· 1\ =I i i §I I I I \ 1\ ~ .\ 1·· -···- I I I I I I I I ~ I I I I I I I I I I I I I I I I I I I I I I I I I \\ ,, \1 '' \'\. I I I I ,, ,, I .-- ~ \\ ~\ 11 11 \ SEWER SCHEMATIC EXHIBIT I I. ·I ,• , .. . Line From To ' 267 GPD per MH # i MH# GPO/lot Person <l.l -0 0 z <l.l E -o 0 0 ..... z t.i... B :::: 0 (.J.., GPD Outfall #1 - Serves Phase l A, l C, 2, 2A and 8 81 !Cl 36 0 9,612 1C2 _ IC! 5 0 1,335 ICI IA2 3 0 801 Exhibit B Castlerock Subdivision -Phases lA, lB, lC, 2, 2A and 8 Sanitary Sewer Analysis Flow Calculations Average Daily Flows (ADF) GPD CFS Infiltration Peaking (10% ADF) Factor CFS Peak Flows CFS Size Material (i n.) I Pipe Calculations Inside Diameter Inches Manning Friction Slope Peak Flows % Min. Design Slope Peak Flows % 9,6 12 0.0149 0.0015 4.00 0.06 8 03034 7.754 0.0030 0.40 Pipe I Slope Check I OK 1,335 0.0021 0.0002 4.00 0.0 I 6 D3034 5.793 0.0003 0.80 [ OK 10,947 11,748 0.0182 0.0018 4.00 0.07 8 03034 7.754 0.0045 0.40 l OK IAI 1A2 28 0 7,476 -7,476 0.0116 0.0012 4.00 0.05 8 03034 7.754 0.0018 0.40 ! OK IA2 IA3 3 0 801 19,224 20,025 0.0310 0.0031 4.00 0.13 8 03034 7.754 0.0130 0.40 i OK --,-~~-1-~~~-+-~~--t~~~-+-~~~-t-~~~--t~~~+-~~~--t~~~-+-~~-r~--+~~~-+-~~~-t-~~--+~~~--,.-~~ 2A1 __ ~2_1 ~1~_3_3~-+'~-o~__.~__,8,_8 _11-+--~~--~-+-~-8~,8_1_1 -1-_o._0_13_6-+-~-o ._0_0_14~-1--4_.o_o~+---o_.0_6~1--~8-1-_0_3_03_4__.~7_._75_4~-+--o_.0_0_2s--+~o_.4_0~~1~o_K~ 21 IA3 19 0 5,073 8,811 13,884 0.0215 0.0021 4.00 0.09 8 0 3034 7.754 0.0062 0.40 ! OK IA 4 IA3 ~IA_4~11~~3 ~-1~~0 ~-+-~~80_l_,_~_3_3,~9_09-+-~-3~4,_7_10_,__o_.0_5_37-+-~-0._0_05_4~-+--4_.o_o~f--o_.2_2~-1--~8-+-_0_3_03_4-+~7_.7_5_4~-+-o_.0_3_9_0-+-~0._40~! OK 22 IA4 ·~-~3 ~-+-~-o~--+~-~8_0_1-+-~~--~+-~~8_0_1 -+-0_._00_1_2-+-~o_._OO_O_l~-+--4_.o_o~+---0 ._0_1 ~1~~8 +-_0_30_3_4--+~7_.7_5_4~_, __ 0._0_00_0~I ~0._4_0 ~ __ 0_K~ !AS 0 0 -35 ,511 35,511 0.0549 0.0055 4.00 ' 0.23 8 0 3034 7.754 0.0408 : 0.40 I OK --~~~~~~-+-~~~+-~~--t~~~~-1--~~~+-~~-t-~~~~+-~~-+-~~~1~~+-~~--+~~~-+~~~+---~~--;-~~ Outfa ll #2 -Serves Phase 1 B I I 181 ~,~-0~---;,~-3.-6 -1 ---<~~-,8-1-+-~-3-3,-90-9-+-~-34-,-09-0-+--0-.0-52-7-+-~0-.-00-5-3~+--4-.0-0 __.~0-.2-2~·•~-l-8-+--0-22-4-l-+-~l -7.-26-3~+---0-.0-0-0-5 ~1~0-.-20~~1~0-K~ Exhibit B