HomeMy WebLinkAboutWater and Wastewater Report~ James· F. Turner Engineers, l. P: . J FT E -----------··--. · -------.. ··-----~ Consulting Engineers
Heights Venture Architects
1111 North Loop West Suite 800
Houston, TX 77008
Attn: Mike Kravetz
Re: Water and Wastewater Demand Report
Navarro West Center
Wellbourn & Navarro Road
College Station, TX
Dear Mike,
May 28, 2008
Thts .repprt is intended to meet the City of College Stahon design requirements for the proposed
site improvements, abiding by the B/CS Unified Design Guideline Manual 2005, International
Plumbing Code 2006, and the International Fire Code 2006.
Water Design Report -Normal Flow
Space 'A' fixture unit count 26.5 fixture units
Space 'B' estimated fixture unit count 159 fixture units
total fixture unit count 185.5 fixture units
Total Demand 88 gpm
Total demand in gallons per minute is based on the conversion of the fixture units on the system
with flush valves. One such conversion table, as prepared by the "Plumbing Systems & Design"
for continuing educatioo is attached. Reference Table 4.
Domestic water service will be connected to an existing 8" diameter water line stubbed up at the
property line along Navarro Drive.
Water Design Report -Fire Flow
Based on the International Fire Code 2006 Appendix B & C
Three hour rated fire wall is between Tenant Space 'A' and Tenant Space 'B'.
Space 'A'
Building Category Type llB
Area 11 ,990 sf
Fire Flow 2,250 gpm from Table 8105.1
Fire Flow Duration 2 hrs from Table C105.1