Loading...
HomeMy WebLinkAboutCost Estimate~ __ J_am_e_s_F. __ T_u_r_ne_r_E~n_g~in_e~e_rs_·,_L_.P_··~ ~ Consulting Engineers, May 2a, ~mos Heights Venture Architects 111-1 North Loop West Suite 800 Houston, lX 77008 RE: Co.st Estimate NAVARRO WEST CENTER, COLL.EGE SI ATlON, TEXAS Dear Mike., The estimated co.sts for the proposed utility improvements,, wh'ich include a new fire hy.drant, are as follows. Quart'tity 40 LF 1 1 Desctiption 6" PVC Water Pipe Cl~$S 200 or 6" D.I. Pip:e Fire Hydrant 6" G~te Vi;ilve & aox Unit Cost Total Cost $40 $1,600 $2,500 $2,500 Sl,900 $1,900 Grand Total $6,000 All costs include materiar and labor. All materials and installation per city standards. •' Sincerely, James F. Turner Engineers; LP ~~A•---~'-IY::fV~ Tyler N. Mackay, PE DALL.AS -8340 Meadow Road -Suite 160 --Dallas, Texas 75231 --214-750-2900 -Fax 214-750-2902