Loading...
HomeMy WebLinkAboutCost EstimateItem Est. No. Quan. 1 2,827 2 57 3 78 4 0 5 0 6 2 7 6 8 0 9 1 10 1 1 1,272 2 1 3 1 4 3 5 3 CITY MEMORIAL CEMETERY AND AGGIE FIELD OF HONOR BID TABULATION 08-36 PARKS RECREATION Memorial Cemetery of College Station and Aggie Field of Honor Water Line Bid Summary and Sanitary Sewer En1:1ineer's Estimate Acklam Construction Company Unit Unit Item Meas. Description Price Total Water Main Items LF 8" PVC waterline, comp!. in place $18.00 $50,886.00 LF 8" PVC structural waterline, compl, in place $23.00 $1,311 .00 LF 16" steel casinq, comp!. In place $90.00 $7,020.00 LF 6" PVC waterline, comp!. in place $15.00 $0.00 LF 6" PVC structural waterline, comp!. in place $25.00 $0.00 EA 6" fire hydrant assembly comp!. In place $3,500.00 $7,000.00 EA 8" qate valve, comp!. in place $1 ,200.00 $7,200.00 EA 6" qate valve, comp!. In place $1 ,000.00 $0.00 EA 10"x8" reducer, comp!. In place $500.00 $500.00 LS Various bends, plugs, tees $90,000.00 $90,000.00 Total Water Main Items $163,917.00 Sanitary Sewer Items LF 6" PVC SOR 26 -ASTM 03034, in place $28.00 $35,616.00 LS Various Bends and Fittings $3,000.00 $3,000.00 EA Tap into Existing Sanitary Sewer $600.00 $600.00 EA Sanitary Sewer Manhole $2,300.00 $6,900.00 EA Sanitarv Sewer Cleanout $300.00 $900.00 Total Sanitary Sewer Items $47,016.00 Total Water and Sanitary Sewer $210,933.00 Page 1