Loading...
HomeMy WebLinkAboutFire Flow Report...:.~ BAUMEISTER GUTHERY L.C. Architects and Planners ~ 3233 N. Harvey Parkway, Oklahoma City, Oklahoma 73118 Fire Flow Report Project: Existing Square Footage Proposed Square Footage Total Square Footage Construction Classification Suppression Required Flow per IFC 8105.1 Fully Sprinkled Building Flow Reduction of 50% per IFC Required Hydrants: Provide new Hydrant: Per attached College Station Utilities Report dated 6/10/09: Nozzle Size: Existing Hydrant Flow: (F1) New Hydrant Flow (est): (F2) New Total Hydrant Flow: Static PSI: Residual PSI: Required Minimum Flow for New Hydrant (1,750 gpm required -1,300 gpm existing): New Hydrant Estimated Flow: Water Supply Loop: Roughness Coeff: Hydraulic Calculation: Maximum Velocity: June 23, 2009 The Esperanza of College Station 1103 Rock Prairie, College Station, TX 77845 22, 193 SF 15,471 SF 37 ,664 SF 5A Fully sprinkled, NFPA 13 system 3,500 gpm for 3 hours 1,750 gpm for 2 hours One (1) Existing, One (1) New Two (2) total 2.5" 1,300 gpm 1,000 gpm 2,300 gpm 88 psi 80 psi 450 gpm 750 to 1,000 gpm 8" Dia. PVC C900 150 (Hazen Williams) Hazen Williams 12 ft/sec 405.705.2470 Pg 1/3 WATER LINE VELOCITY CALCULATIONS SUMMARY LINE SEGMENT LENGTH (ft) DIAMETER (in) MATERIAL ROUGHNESS FACTOR DISCHARGE (gpm) VELOCITY (fUsec) A 1000 8 PVC C900 150 assumed B 250 8 PVC C900 150 C 18.5 6 C909 DR14, 150 Class 200 A -Water line extension from Water Main to FH 1. B -Intermediate Water Line Segment between FH 1 and FH 2. C -Water line extension from Main to FH 2. WATER LINE JUNCTION PRESSURE SUMMARY 1,300 1,300 max 1,000 MARK ELEVATION (ft) DEMAND (gpm) HYDRAULIC GRADE (ft) FH 1 318.33 1,300 521.61 FH 2 317.50 1,000 520.78 Lowest Line Pressure = 76.26 psi Conclusion: 8.75 8.75 12.00 RESIDUAL PRESSURE (PSI) 76.62 76.26 The additional fire hydrant combined with the existing fire hydrant shall have sufficient capacity to meet the IFC and the City of College Station requirements, and deliver water at the specified volume in the 8" PVC Fire Line, below the maximum velocity of 12 ft/sec, and with water line pressures maintained above 76.26 psi under the stated delivery pressure and demand load. [~~"C" (6" FH~,,,.,)~~ 1,000r(~.w @ ~0~~~(4 Ne~)~ 1~:.t~ \Ide~~ 12-(t./~J 1)4: 7131106 Report Revised by R.G.Wynne, P.E. Wynne Engineering Corp. Okla. City, OK 73139 (405) 691-8080 .... ~ BAUMEISTER GUTHERY LC. Architects and Planners ~ 3233 N. Harvey Parkway, Oklahoma City, Oklahoma 73118 405.705.2470 Fire Flow Report June 23, 2009 Information Project The Esperanza of College Station 1103 Rock Prairie, College Station, TX 77845 Existing Square Footage Proposed Square Footage Total Square Footage Construction Classification Suppression Required Flow per IFC 8105.1 Fully Sprinkled Building Flow Reduction of 50% per IFC Required Hydrants Existing Hydrant Flow Required Minimum Flow for New Hydrant (1,750 gpm required -1,300 gpm existing) New Hydrant Estimated Flow Velocity Conclusion 22, 193 SF 15,471 SF 37,664 SF SA Fully sprinkled, NFPA 13 system 3,500 gpm for 3 hours 1, 750 gpm for 2 hours Minimum 1 1,300 gpm 450 gpm 1,200 to 1,250 gpm Shall not exceed 12 ft/sec The additional fire hydrant combined with the existing fire hydrant shall have sufficient capacity to meet the IFC and the City of College Station requirements. Cathleen Guthery For the Firm