HomeMy WebLinkAboutCorrespondenceJuly 17, 2009
Ms. Erika Bridges, EIT
City of College Station
Development of Public Works
101 Texas Avenue
College Station, TX 77840
RE: The Esperall7Jl of College Station
1103 Rock Praire Rd.
College Station, TX 77845
ADACG# 260-06
SUB: Public Drainage Easement
Dear Ms. Bridges:
ADA CONSULTING GROUP, INC.
12150 VAL.UANT, STE 8 . SAN ANTONIO, TX 78216
(210) 340-5670 FAX: (21 0) 4039800 WWW.ADACG.COM
The purpose of this correspondence is to certify that the proposed improvements for the above referenced
project will not inhibit the flow of storm water runoff through the existing Public Drainage Easement. All
finished grades of the proposed curb that encroaches within the Public Drainage Easement are typically
lower than the adjacent natural ground elevations which allows for positive drainage within the easement.
Please accept this statement in consideration for the approval of the above referenced project. Feel free to
contact our office if you have any questions or require any additional information.
Sincerely,
?-~J/-
Michael P. Sepeda, P.E.
Project Manager
T AS PLAN REVIEWS/INSPECTIONS • CIVIL·SITE ENGINEERING • DRAINAGE/DETENTION
ADA CONSULTING GROUP. INC.
12150 VALLIANT, STE B. SAN ANTONIO, TX 78216
(21 0) 340-5670 FAX: (21 0) 403-9800 WWW.ADACG.COM
TBPE REGISTERED ENGINEERING FIRM NO. F-003512
July 17, 2009
Mr. Matthew Hilgemeier
City of College Station
Public Works Department
1101 Texas Ave.
College Station, TX 77842
RE: The Esperanza of College Station
City Review Comments #2 on 716109
1103 Rock Prairie Rd.
College Station, TX 77845
Dear Mr. Hilgerneier:
I have prepared the following responses to the City staff review comments that were issued on July 6,
2009 for above referenced project:
ENGINEERING COMMENTS NO. 2:
Comment#!
The water and sewer demand units have been converted to gallons per minute (gpm) on the site plan
(Sheet C-1 ).
Comment#2
A vicinity map on the site plan has been added to show the project location.
Comment#3
Sheet CS has been re-titled to Erosion Control Plan.
Comment#4
The encroachment issue is being coordinated by the architect and/or surveyor of record.
Comment#5
An Easement Dedication Application is being prepared to propose a new Public Utility Easement.
Comment#6
A plan and profile has been added to the site plan in place of the section.
Comment#7
The Temporary Fire Access will have one coarse of seal-coat to make it an all weather surface. A
Fire Lane Note on the site plan is included to propose this Temp Fire Access at the start of the
project.
T AS PLAN REVIEWS/INSPECTIONS • CIVIL-SITE ENGINEERING • DRAINAGE/DETENTION
July 17, 2009
City Comments Response Letter 2
Page2of4
Comment#8
A letter is included with the resubmittal.
Comment#9
The sewer tie-in location match on Sheets C 1 and C3.
Comment#lO
The Esperanza of College Station
1103 Rock Prairie Rd., College Station, TX 77845
City Standard details for Water and Erosion Control has been added to the plan set.
ELECTRICAL COMMENTS:
I spoke with Sam Weido over the phone to go over the electrical comments. He stated that the electrical
notes placed from our initial resubmittal would be acceptable to address his comments.
FIRE COMMENTS:
I spoke with Steve Smith over the phone on his comment. A temporary all-weather surface drive
incorporated within the proposed fire lane that surrounds the building would be acceptable to address his
comment.
Respectfully,
ADA CONSULTING GROUP, INC.
? -/. 3'/'-
By: Michael P. Sepeda, P .E.
Project Manager
Attachments