HomeMy WebLinkAboutConstruction CostENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST
FOR PUBLIC IMPROVEMENTS
Adamson Lagoon
MBESI No. 1014-0005
July 18, 2008
Item # I Description Unit Quantity Unit Price I
Water Im rovements
I 6" AWWA C909 CL 200 PVC LF 79 $25.00
2 6" D.I. Tee EA 2 $375.00
3 6" Gate Valve EA I $675.00
4 6" x 4" D.I. Reducer EA $275.00
5 6" x 3" D.I. Reducer EA $275.00
6 4" Gate Valve EA $500.00
7 3" Gate Valve EA $400.00
8 Fire H drant Assemble EA I $2,600.00
Total
$1 975.00
$750.00
$675.00
$275.00
$275.00
$500.00
$400.00
$2 600.00
$7,450 Total Construction CostJ ========
The above construction estimate is based on the engineer's opinion of probable construction costs. This estimate constitutes
our best judgment at this time. Please note that the engineer does not have any control over contractor or supplier workloads
and the degree to which inflation may affect project costs between now and the bid date. During construction, additional
features may become apparent as the work progresses, which will result in an increase or decrease in cost.
Page 1 of 1
~._.,,,,\.'\..
-~~OF Ti:-i-··,\ ;' co;(,.t;.••···~u-''\t 2't.:~1a *7.;;·.\lJ , ••••• l!.'1 •••• ~y •••• ~ 2 J. DALE BROWNE, JR. ~ ~····················~ fA i·· 81890 lt;2 ,,,o_: •'?~GtSTEV-~?·~~ \. ~Ss • • • • ·:._~<::> ._, '\'\..,IONA\..~~ .,,,,~~