HomeMy WebLinkAboutLetter Acknowledging City StandardsDecember 10, 2008
Ms. Erika Bridges
Engineering Department
City of College Station
1101 Texas Avenue
College Station, Texas 77842
Re : Letter Acknowledging City Standards
Anytime Fitness at Southwest Crossing at Bee Creek
College Station, Texas
Gessner Engineering Job No .: 08-0491
Dear Ms . Bridges:
The purpose of this letter is to acknowledge that the construction plans for the
water, sanitary sewer, streets and drainage for the above-referenced project, to
the best of my knowledge, do not deviate from the B/CS Design Guideline
Manual. Any alternate design or construction methodology that was used is
listed below:
1. 'Perimeter Guard ' Sediment Control Fence was utilized in lieu of standard
silt fence because it was needed over paved areas since this is an
addition. This fencing allows cars to drive over it as needed, yet provides
sediment control during construction .
also acknowledge, to the best of my knowledge, that the details
provided in the construction plans are in accordance with the
Bryan/College Station Standard Details.
Sincerely,
GESSNER ENGINEERING
Melissa P. Thomas, P.E.
___ ,,,,,,,
--.;~OF]",('-\\\ ~?'-............ :.t, ••
,:'q, ·" * ··.;-1~•, : * ... .. * ,, ~ *. ".* ~ "-...................... ~ ~ MELISSA P. THOMAS I! ~..i111 •••••••••••••••••••••• ~ ~ . . ~
,, -<> • .. ( 98398 ... 9::1 11~0 "·/CENS~<?·· ~.:' '•:;<"~s·· ........ ~~:
''\ 8/0NAL t.~----,,,,,,, .... --
G
Gessner
Engineering
I 7 I 2 Southwest Pkwy
Suire 105
College Station , Texas 77840
P.O. Box I 0763, 77842-0763
979.680.8840
FAX 979.680.884 I
2204 S. Chappell Hill Sr.
Brenham, Texas 77833
979.836.6855
FAX 979.836.6847