HomeMy WebLinkAboutLetter Acknowledging City StandardsCity of College Station
Development Services
PO Box 9960
College Station, TX 77842
MITCHELL
MM
MORGAN
December 15, 2008
Re: LETTER ACKNOWLEDGING CITY STANDARDS RIVER OAKS TOWNHOMES
PHASE II , COLLEGE STATION, TX
Dear Carol,
The purpose of this letter is to acknowledge that the construction plans for the above-
referenced project, to the best of my knowledge, do not deviate from the B/CS Design
Guideline Manual. Any alternate design or construction methodology that was used is
listed below:
1. None
I also acknowledge, to the best of my knowledge that the details provided in the
ruction plans are in accordance with the Bryan/College Station Standard Details.
Cc. File
511 UNIVERSITY DRIVE EAST, SUITE 204 • COLLEGE STATION, TX 77840 • T 979.260.6963 • F 979.260.3564
CIVIL ENGINEERING • HYDRAULICS • HYDROLOGY • UTILITIES • STREETS • SITE PLANS • SUBDIVISIONS
info@mitchellandmorgan.com • www.mitchellandmorgan.com