Loading...
HomeMy WebLinkAboutEngineer's Cost EstimateJob: 4-08 GALINDO ENGINEERS AND p LANNERS, f NC. 38833 South Texas Ave., Suite 213 Bryan , TX 77802 979-846-8868 ALLEN HONDA SHOW CAR SALES LOT 9, BLOCK B EASTMARK SUBDIVISION PHASE II COLLEGE STATION, TX ENGINEER'S COST ESTIMATE Date: 03/31/08 ITEM SPEC# DESCRIPTION UNIT QUANT. PRICE TOTAL ==== : ======= ============= ============================= ===== ======== ======== ======== PUBLICINFRASTRUCTURE -CONCRETESTRUCTURES --------------------------------------------------------------------------- Mobilization l.s. 500.00 500 2 Remove existing 4'-wide sidewalk s.f. 64 15.00 960 3 Remove existing curb & gutter l.f. 16 25.00 400 4 Install rough concrete flume s.f. 100 15.00 1,500 5 Install new curb & gutter l.f. 16 25.00 400 6 Install new sidewalk s.f. 64 25.00 1,600 7 Contingency % 5 268 8 Construction Layout & As-Built Drawings % 5 268 -------------- Subtotal $ 5,896 ==== : ======= ============= ============================= ===== ======== ======== ======== TOTAL $ 5,896