HomeMy WebLinkAboutDrainage ReportGALINDO ENGINEERS AND PLANNERS, INC.
3833 South Texas Ave., Suite 213 Bryan, Texas 77802 (979) 846-8868
Mr. Alan Gibbs, P .E.
City Engineer
City of College Station
College Station, TX
February 29, 2008
Subject: Abbreviated Drainage Report
Allen Honda Show Cars Sales
College Station, TX
Dear Alan:
4-08
Pleased find enclosed the referenced report for your review. Although we are
proceeding to prepare the site plan for this project using the Small Lot Exception
for drainage considerations we have made an effort to slow down and detain the
increased storm water run off up to the 10-yr event.
Sincerely,
GALINDO ENGINEERS AND PLANNERS, [NC.
Christian A. Galindo, P .E., R.P .L.S.
President
cc: John Allen
Allen Honda
1. TRACT DESCRIPTION
ALLEN HONDA SHOW CARS LOT
ABBREVIATED DRAINAGE REPORT
4-08
This project lies within the Bee Creek Drainage Basin and covers all of Lot 9, Block
"B", Resubdivision Final Plat of Block "B", Eastmark Subdivision Phase II. The total
area of this lot is 0. 9152 acre. The project is located in the northeast corner of the
intersection of Southwest Parkway East and Eastmark Dr.
The tract is currently vacant. The proposed development will consist of a parking
lot for show cars owned by Allen Honda.
The attached 24"x36" sheet, Site and Drainage Plan, is part of this report and will be
ref erred here as Exhibit 1.
The adopted Flood Insurance Study does not identify the existence of a 100-yr flood
plain affecting this tract (FEMA FIRM# 48041 C 0144 C, July 2, 1992).
2. STORMWATER RUNOFF
Exhibit 1 shows the tract, its location and topography and the proposed
construction project. The existing topographic data shown was developed under the
supervision and control of the undersigned. This Exhibit also depicts the proposed
grading.
Only one drainage area has been defined for this tract. No offsite runoff comes
onto this property and all runoff flows in a southeast direction towards adjoining Lot
8 and towards Southwest Parkway.
A runoff detention area has been located within the parking lot and has been
designed to detain the 10-yr event. Rains exceeding this intensity will overflow into
the adjoining Lot 8 and the lower end of Southwest Parkway. All parking lot curbing
is 6" high with the exception of the outflow weir where the flow line is 7" lower
than the top of the curb.
Exhibit 2 is a report, in nine pages, prepared using Hydraflow Hydrographs software
by lnellisolve. The existing and ultimate conditions hydrographs for the 2-, 5-and
Page 2
10-year events using the NRCS Unit Hydrograph Method are included in this report.
The ultimate conditions hydrographs for the 2-, 5-and 10-year events using the
same methodology.
The data resulting from these Exhibits is summarized as follows:
2-y_r 5-y_r 10-y_r
Q pre-development, cfs 1.57 2.65 3.44
Q post-development, cfs 1.79 2.47 3.01
Water elevation 285.72 285.83 285.90
Required Storage, cuft 3,638 5,765 7,308
This same report calculates the storage capacity of the area designated as pond to
be 7,319 cuft, sufficient to cover the required capacity.
A weir, designed as a 1.95' (approx1mately 2.0') curb cut controls the flows as given
above reaching a maximum elevation of 285.9' at the 10-yr event.
Exhibit 3 shows the calculations for the flume and opening under the sidewalk that
will be necessary to convey the 10-yr event from the pond to the gutter of
Southwest Parkway. This flume will have a rectangular concrete section with an
average width of 3. 75' and a depth of 4". This flow will discharge the 3.01 cfs at a
velocity of 5.25 fps (flume slope of 2.86%).
3. CERTIFICATION
I hereby certify that I am familiar with the adopted ordinances, regulations,
standards and policies of the City of College Station governing development, that
this plan has been prepared under my supervision and that, to the best of my
knowledge, it complies with said ordinances and regulations. Furthermore, as
stated above, this site does not lie within a special flood hazard area as established
by FEMA and shown on the FIRM# 48041 C 0144 C for the City of Bryan , effective on
July 2, 1992 .
.................... :\\\ ,,~ ~--~t o F r £ '•e1 =~'to ................. ,,..-1 i~
: C::> .... •• ••• ~ ,,,,, - * .. . J,, ,., "' .. •• 11' 'i. $*:' ~.*,,, if/!-•••••·································~
icHRISTIAN A. GALINDOi ~··••eeeMeee•••• .. eeeee•eaeee ... ••••o•e•e90eee•-i/!_ ~-o~. 53425 lQ:! "'~ •·• • .P~ <v~··',4.1""' 11. 0~ ···.~~GJsTt.~ .... ·· .~ # 1,, ~Ss ..... ..... (>' .: tea IONAL t. $' ,,,, ~ .....
\ '!t.."ti. ... °""' ....
CHRISTIAN A. GALINDO, P.E. # 53425, R.P.L.S. # 4473
February 29 , 2008
Page 3
;
. ,..iO
1 2
\/
4
"'
Legend
Hyd. Origin Description
1 SCS Runoff PRE DEVELOPMENT
2 SCS Runoff POST DEVELOPMENT
3 Combine COMBINE
4 Reservoir ROUTING
Hydraflow Hydrographs Model Project: 4-08 POND.gpw Monday, Feb 25 2008, 5:13 PM
1
Hydrograph Return Period Recap
Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph
No. type Hyd(s) description
(origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr
1 SCS Runoff --------------1.57 __ .. ____ 2.65 3.44 ---------------------PRE DEVELOPMENT
2 SCS Runoff -------------2.72 -------3.84 4.62 ------------------POST DEVELOPMENT
3 Combine 1, 2 -------4.29 ------6.49 8.06 ------------·----COMBINE
4 Reservoir 3 -----1.79 ------2.47 3.01 --------------·-ROUTING
Proj . file: 4-08 PON D.gpw Monday, Feb 25 2008, 4:54 PM
1
Hydrograph Summary Report
Hyd. Hydrograph Peak Time Time to Volume Inflow Maximum Maximum Hydrograph
No. type flow interval peak hyd(s) elevation storage description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 SCS Runoff 1.57 3 726 5,233 -------... -· -----PRE DEVELOPMENT
2 SCS Runoff 2.72 3 726 9,738 --------------POST DEVELOPMENT
3 Combine 4.29 3 726 14,971 1, 2 ------------COMBINE
4 Reservoir 1.79 3 741 14,966 3 285.72 3,638 ROUTING
4-08 POND.gpw Return Period: 2 Year Monday, Feb 25 2008, 4:56 PM
2
Hydrograph Summary Report
Hyd. Hydrograph Peak Time Time to Volume Inflow Maximum Maximum Hydrograph
No. type flow interval peak hyd(s) elevation storage description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 SCS Ru noff 2.65 3 726 8,814 ---------------PRE DEVELOPMENT
2 SCS Runoff 3.84 3 726 14,025 ----------------POST DEVELOPMENT
3 Combine 6.49 3 726 22,838 1, 2 ----------COMBINE
4 Reservoir 2.47 3 741 22,833 3 285.83 5,765 ROUTING
4-08 POND.gpw Return Period : 5 Year Monday, Feb 25 2008, 4:56 PM
3
Hydrograph Summary Report
Hyd. Hydrograph Peak Time Time to Volume Inflow Maximum Maximum Hydrograph
No. type flow interval peak hyd(s) elevation storage description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 SCS Runoff 3.44 3 726 11,495 --------------PRE DEVELOPMENT
2 SCS Runoff 4.62 3 726 17,064 ----------POST DEVELOPMENT
3 Combine 8.06 3 726 28,559 1, 2 --------COMBINE
4 Reservoir 3.01 3 741 28,554 3 285.90 7,308 ROUTING
4-08 POND .gpw Return Period: 10 Year Monday, Feb 25 2008, 4:56 PM
Pond Report
Hydraflow Hydrographs by lntelisolve
Pond No. 1 -POND
Pond Data
Monday, Feb 25 2008, 5:22 PM
Pond storage is based on known contour areas. Conic method used.
Stage I Storage Table
Stage (ft)
0.00
0.35
0.60
Elevation (ft) Contour area (sqft)
285.30
285.65
285.90
00
18,000
23,900
Culvert I Orifice Structures
[AJ [BJ [CJ
Rise(in) = 0.00 0.00 0.00
Span (in) = 0.00 0.00 0.00
No. Barrels = 0 0 0
Invert El. (ft) = 0.00 0.00 0.00
Length (ft) = 0.00 0.00 0.00
Slope(%) = 0.00 0.00 0.00
N-Value = .013 .013 .013
Orif. Coeff. = 0.60 0.60 0.60
Multi-Stage = nla No No
Stage I Storage I Discharge Table
Stage Storage Elevation Clv A
ft cuft ft cfs
0.00 0 285.30
0.35 2,100 285.65
0.60 7,319 285.90
[DJ
0.00
0.00
0
0.00
0.00
0.00
.013
0.60
No
Clv B
cfs
Iner. Storage (cuft)
0
2,100
5,220
Total storage (cuft)
0
2,100
7,319
Weir Structures
[AJ [BJ
Crest Len (ft) 1.95 0.00
Crest El. (ft) = 285.30 0.00
WeirCoeff. = 3.33 0.00
Weir Type Re ct
Multi-Stage = No No
[CJ [DJ
0.00 0.00
0.00 0.00
0.00 0.00
No No
Exfiltration = 0.000 in/hr (Contour) Tailwater Elev. = 0.00 ft
Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control.
ClvC Clv D WrA WrB WrC WrD Exfil Total
cfs cfs cfs cfs cfs cfs cfs cfs
0.00 0.00
1.34 1.34
3.02 3.02
Hydrograph Plot
Hydraflow Hydrographs by lntelisolve
Hyd. No. 4
ROUTING
Hydrograph type
Storm frequency
Inflow hyd. No.
Reservoir name
= = = =
Reservoir
2 yrs
3
POND
Storage Indication method used.
Q (cfs)
ROUTING
Hyd. No. 4 --2 Yr
5.00 -I --!-TTT--1
I i I
I i I I I
4.oo ---: -__ : --I ·----1 -
I I 3.00 t -1· ···--1--·
I
I I : I
2.00 -+--t--t --;--_,_1+-
I 1~-
1 I
1.00 ----L--t-----;-----+---+l'-+-1
I
I
I
Monday, Feb 25 2008, 5:9 PM
Peak discharge
Time interval
Max. Elevation
Max. Storage
= 1.79 cfs
= 3 min = 285.72 ft
= 3,638 cuft
Hydrograph Volume= 14,966 cuft
Q (cfs)
,--1 -r 5.oo
I
-~'----+----4.00 ~ I I
I I ~ . +1 -13.00
I I -T 2.00
I I
I
I
I 1.00 1
I
I 0.00 0.00 __ __:__ ____ ~~:::::.._ L__ _L=_::=:±::::::::::=:I::::::~h~::l--1
0 3 5 8 10 13 15 18 20 23 25 28
--Hyd No. 4 --Hyd No. 3 Time (hrs)
1
Hydrograph Plot
Hydraflow Hydrographs by lntelisolve
Hyd. No. 4
ROUTING
Hydrograph type
Storm frequency
Inflow hyd. No.
Reservoir name
=
=
=
=
Reservoir
5 yrs
3
POND
Storage Indication method used.
Q (cfs)
ROUTING
Hyd. No. 4 --5 Yr
Monday, Feb 25 2008, 5:9 PM
Peak discharge
Time interval
Max. Elevation
Max. Storage
= 2.47 cfs
= 3 min = 285.83 ft = 5,765 cuft
Hydrograph Volume = 22,833 cuft
Q (cfs)
7.00 -1_ ·-1 -----1 ~---I I 17.00
::: , --~~i ~~~~i_ -~-~~~~~1
--_ ~-~~~~~~~~~·~~-·-~-·~~~~~1
6.00 -+-----1 I 5.00
4.00 _L_ -t-~ !--+----+---·--+------+--+ 4.00
' ' I I I
I I I
! I I
3.00 . --1 ___ ..._i __ --+-----+---1 --~il ---+---+--------+---+---3.00
2.00 ' 1--~---1--+--·--+-Hi-\+----.,.--1 ----+---+----+----!-----2 .00
1.00 ~ .. ___(_ ~---t---11 --+---+t--+1 --\\--!--->--~-~--+-_J 1.00
0.00 ___ L__l ---1.1 ......... ~~~::::L/ __ L l=:::t::::::::::::!::::::~:::::::=-i::::=:L _ _J_ 0.00
0 3 5 8 10 13 15 18 20 23 25 28
--Hyd No. 4 --Hyd No. 3 Time (hrs)
2
Hydrograph Plot
Hydraflow Hydrographs by lntelisolve Monday, Feb 25 2008, 5:7 PM
Hyd. No. 4
ROUTING
Hydrograph type
Storm frequency
Inflow hyd. No.
Reservoir name
= = = =
Reservoir
10 yrs
3
POND
Peak discharge
Time interval
Max. Elevation
Max. Storage
= 3.01 cfs = 3 min = 285.90 ft
= 7,308 cuft
Storage Indication method used. Hydrograph Volume = 28,554 cuft
Q (cfs)
ROUTING
Hyd. No. 4 --10 Yr
10.00 -, ---r--T --i ·-r ·-r
Q (cfs)
10.00
j I I ~I I I
8.00 -~--+-~· -----+--~-·-··~-+---+-----+-----+---i 8.00 I I
' I I
' I I
6.00 -, +--+-·--+-----·-·-·--4-1---+-----+----t----1-·--r 6.00
' I I i I I
4.00 -· ---+-+--! II ~ 4.00
i I I
2.00 _' I 1 ;--1-r· I hl-,_ -· -_,_ 2.00
! I I I
o.oo · ___ _:...I _.........!.I ............ _...,,._ ~~~=.Ji ____ L ____ _l:~:::::±:! ::::::~~d~~-_J_ o.oo
0 3 5 8 10 13 15 18 20 23 25 28
--Hyd No. 4 --Hyd No. 3 Time (hrs)
1
Rect.angular Channel Analysis & Design
Open Channel -Uniform flow
Worksheet Name: ALLEN HONDA
Comment: RECTANGULAR CONCRETE FLUME
Solve For Depth
Given Input Data:
Bottom Width .... .
Manning's n ..... .
Channel Slope ... .
Discharge ....... .
Computed Results:
Depth ........... .
Velocity ........ .
Flow Area ....... .
Flow Top Width .. .
Wetted Perimeter.
Critical Depth .. .
Critical Slope .. .
Froude Number ... .
3.75 ft
0.013
0.0286 ft/ft
3.01 cfs
0.15 ft
5.25 fps
0.57 sf
3.75 ft
4.06 ft
0.27 ft
0.0046 ft/ft
2.36 (flow is Supercritical)
Open Channel Flow Module, Version 3.21 (c) 1990
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
EXHIBIT 3