Loading...
HomeMy WebLinkAboutSewer System ReportSewer System Report for Spring Creek Townhomes, Phases 2 & 3 College Station, Texas January, 2008 Prepared By: Civil Development, Ltd. 2033 Harvey Mitchell Parkway South College Station, Texas 77840 (979) 764-7743 Location: Land Use: Design Criteria: GENERAL INFORMATION Spring Creek Townhomes, Phases 2 & 3 are located in southern College Station, inm1ediately south of the Decatur Drive and Alexandria Drive intersection. Phase 2 of the subdivision has 29 lots, and Phase 3 has 42 lots. At the time of this submittal, only Phase 2 is being developed, but since the sewer system must be designed to acconunodate all 71 lots, both phases are included in this analysis. Single Family Residential Primary Sewer Outfall: An 18" sewer line that roughly parallels the southern property line of the site. This line was installed approximately 7 years ago by the City of College Station. Residential Demand: Avg. Pop Density: Average Flow: Peaking Factor: Pipe: Applicable Exhibits: Conclusion: 2.67 people per lot 100 gpd/cap or 267 gpd per lot 4 PVC 03034 SOR 26 Exhibit A -Sanitary Sewer System Schematic Exhibit B -Sanitary Sewer Analysis Spreadsheet The analysis in Exhibit B checks the calculated slope required to pass the estimated flow against the minimum slope required by TCEQ. The spreadsheet indicates the minimum required slope is much greater than the computed slope, so we conclude that the system is more than capable of carrying the anticipated flows from the development. SCALE: NOT TO SCALE ··------;;---:-i---------------------·-------------1 ---P:CW!f,~'!..P.'1!!!!:~P: SPRING CREEK GARDENS PH 2 & 3 EX HIBIT 103~~.::;:~:::~~··:::~:~~~;';"'" SEWER SYSTEM SCHEMATIC A P.O BOA 11929. CcNl£tge Slatco, Tel(tts 77842 (9791 764-7743 Fa1t. (979) 754.7759 ~~~---------------------......................... ..... Line I V') (1) V') 0 --0 (1) 0 OJ) E -g ....) "' :z .5 u (1) -0 :z "' ..... E -o ::i <./:::: (1) 1-rom To c E 0 0 :"§ ::: ~ ..... :z (1) I E u... E ~ 0 e..> :11 0 ::: I 0 ~ t; V') i u (1) ! ~ u 0.. I 0::: ; u... ::i 267 GPO per I I I MH II MHll GPO/lot Acre GPO MHS MH6 5 0 I 1,335 1 ----- MH7 MH6 25 0 I 6,675 ----- \!1H6 MH 2 9 0 I 2,403 I 8,010 ----' 2,403 I i'v1H5 MH4 9 0 I ---. --! l,602 I 1\!l H4 MH3 6 0 2,403 ------·---- MHJ MH2 13 0 3,471 I 4,005 ------- MH2 MHI 4 I 0 I 1,068 17,889 ---- Exhibit B Spring Creek Townhomes, Phases 2 & 3 Sanitary Sewer Analysis Flow Calculations Average Daily Infiltration Peaking Peak Size Flows (ADF) (10% ADF) Factor Flows GPO I CFS CFS I I CFS (in.) I ' 1,335 0.0021 0.0002 4.00 0.01 6 6,675 0.0103 0.0010 4.00 0.04 6 10,413 0.0161 0.0016 4.00 0.07 6 2,403 0.0037 0.0004 4.00 0.02 6 4,005 0.0062 0.0006 4.00 0.03 6 7,476 0.0116 0.0012 4.00 0.05 6 18,957 0.0293 0.0029 4.00 0.12 8 Page I of I Material I 03034 03034 03034 03034 03034 03034 03034 Pipe Calculations Manning Min. Friction Design Actual Pipe Inside Slope Slope Slope (if! Slope Diameter Peak Peak known) Check Flows Flows I I I ! Inches % I % i % i 5.793 0.0003 I 0.80 l 0.80 ! OK 5.793 0.0068 0.80 L 1.00 OK 5.793 0.0166 : 0.80 I 1.90 i OK I 5.793 0.0009 I 0.80 ! 2.00 OK I I 5.793 0.0025 I 0.80 ! 2.00 I OK 5.793 0.0086 0.80 I 1.00 I OK 7.754 0.0116 0.40 1.00 I OK