Loading...
HomeMy WebLinkAboutLetter of CompletionLETTER OF COMPLETION CITY ENGINEER CITY OF COLLEGE STATION COLLEGE STATION, TEXAS Dear Sir: DATE: } /z, )J u ---''--+1 -~-~- The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station , Texas. This approval and acceptance by the City is requested in order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. The one-year warranty is hereby affirmed and agreed to by _______ _ and by their subcontractors as indicated by signatures below. WORK COMPLETED ....s:4.~f7/ll1Y d£vEA Aldu/I Phone Number: P-9 0 ·· 7i50 /city Engin(/er Revised 1131/07 WARRANTY DATE / /·2-/ 10 ' //L//v //2//u Phone Number: 6'90-7,2.50 fJ.._\ 1t-/z&/':J 7 J).).rJ PLAT FILED \} f 'ff l (-' Z,.Dv ~OFFSJTE Eun& FILED rllA_ .. TlllP BLANKET ElllT FIL.ID ~NO OTHER ESMT8 NH01D _Spl'vo CrurllrP~ Z- soP: Filin of Final Plats -Letters of Com etion 11/06/09 Engineering Inspector/Date: --s'C6l ~ ,,,_ /'-'l-I~ ·1 ()A+ , _ - Project Engineer/Date: ~ -r; .... lr-t"l,, 1,_-.., /._.<, \) (. -1-rc{S-cA Inspectors shall confirm the following and i elude associated comments on the punchlist as necessary before forwarding Letter of Completion to development review engineer: ~contact Donnie Willis (0: 764-6375, C: 229-7632) for outstanding Erosion/Drainage issues, ~ontact Gilbert Martinez (0: 764-6255) for outstanding CS Electric and Streetlights, /coordinate fire flow analyses with CS Water Services (or the design engineer for non-city utilities) and confirm test results meets minimum requirements with the development review engineer • Number of Hydrant to be Flowed: /@, 11J?J0;=-- • Dated Flowed by Water Department: / z_ / 7 /o 7 ~r BTU service area, contact Tom Brent at : 821-5773 for outstanding BTU Electric and Streetlights. In Tom's absence, John Fontinoe or their supervisor Randy Trimble can be J Ontacted at 0: 821-5728. / for BTU service area, confirm with development review engineer that service agreement is p place with BTU, ./for other non-city utility service areas (Wellborn Water SUD, Brushy Creek SUD, Wickson Creek SUD, etc) confirm with development review engineer that infrastructure is complete y nd for outstanding issues, y require that 2 copies of Red-lined Record Drawings be provided for all Public Infrastructure with the following attestation: "I, General Contractor for development, certify that the improvements shown on this sheet were actually built, and that said improvements are shown substantially hereon. I hereby certify that to the best of my knowledge, that the materials of construction and sizes of manufactured items, if any are stated correctly hereon." General Contractor ~uire that 2 copies of Red-lined Record Drawings be provided for all Public Drainage Infrastructure including Private Detention Facilities with the following attestations: "I hereby attest that I am familiar with the approved drainage plan and associated construction drawings and furthermore, attest that the drainage facilities have been constructed within dimensional tolerances prescribed by the Bryan & College station Unified Stormwater Design Guidelines and in accordance with the approved construction plans or amendments thereto approved by the City of College Station." (affix seal) Licensed Professional Engineer State of Texas No. ___ _ "I certify that the subdivision improvements shown on this sheet were actually built, and that said improvements are substantially as shown hereon. I further certify, to the best of my knowledge, that the materials of construction and sizes of manufactured items, if any, are stated correctly hereon." General Contractor Aspectors to review Red-lined Record Drawings, upon acceptable confirmation of drawings, inspector to: o file one set of Record Drawings in Public Works files, and o forward one set of Record Drawings to Jeffery Speed (CSU) ~-ctors should forward Letters of Completion to the development review engineer that reviewed and stamped the construction plans after confirming: o the date on the Letter of Completion Warranty should reflect the date when all associated punchlist items are completed, and o the Owner is shall be listed as the one affirming the one-year warranty A.' development review engineer to: o stamp the Letter of Completion to confirm by initialing that the final plat is filed (or mylar is ready to be filed), all necessary easements (including offsite) have been filed, and blanket easement issues are resolved, and o initial and route the Final Plat mylar for filing. (Note if the developer provided surety the plat it may have been filed ahead of construction.) ~ah Grace-Rosier (Planning) to file the Final Plat utilizes a coversheet to confirm: o infrastructure is accepted by Letter of Completion -or-Surety is provided and acceptable, o signed and notarized mylar of final plat, o parkland dedication has been paid, o digital file of final plat is provided, o a current paid tax certificate has been submitted, and o the final plat closes to acceptable standards. Upon the filing of Final Plat, the development review engineer should stamp the Letter of Completion with the new stamp and verify-initial-n/a the Final Plat was filed, offsite easements have been filed, we have all necessary easements, etc -and then forward the Letter of Completion to Alan Gibbs (City Engineer) for final signature. Alan to forward hard original of finalized Letter of Completion to Shelia Douglas (Public Works). Shelia to: verify o signatures on the Letter of Completion, o forward scanned copy of Letter of Completion to the owner, developer, contractor, Terry Boriskie (Building), Ben McCarty (Building), Samuel Deal (Accounting), Jeffery Speed (CSU), Stephen Maldonado Sr. (CSU), Diane Broadhurst (CSU), Charles "Butch" Willis (CSU), Sue Holcomb (CSU), Carol Cotter (Engineering), Alan Gibbs (Engineering) and Deborah Grace-Rosier (Planning), o mail copies to the owner and contractor, and o place the original in Public Works Development file. Deborah to place a hard copy of the Letter of Completion in the associated Planning Final Plat file. SOP: Filing of Final Plats -Letters of Completion 7/07/09 Inspectors shall confirm the following and include associated comments on the punchlist as necessary before forwarding Letter of Completion to development review engineer: p/" contact Donnie Willis (0: 764-6375, C: 229-7632) for outstanding Erosion/Drainage issues, ¢/contact Gilbert Martinez (0: 764-6255) for outstanding CS Electric and Streetlights, v coordinate fire flow analyses with CS Water Services (or the design engineer for non-city utilities) and confirm test results meets minimum requirements with the development review engineer, ;rJJt for BTU service area, contact Tom Brent at : 821-5773 for outstanding BTU Electric and I'' Streetlights. In Tom's absence, John Fontinoe or their supervisor Randy Trimble can be contacted at O: 821-5728. 1/l rr for BTU service area, confirm with development review engineer that service agreement is r • I ,.,).n place with BTU, (/_ 1f 1 for other non-city utility service areas (Wellborn Water SUD, Brushy Creek SUD, Wickson Creek SUD, etc) confirm with development review engineer that infrastructure is complete _..,and for outstanding issues, V require that 2 copies of Red-lined Record Drawings be provided for all Public Infrastructure with the following attestation: "I, General Contractor for development, certify that the improvements shown on this sheet were actually built, and that said improvements are shown substantially hereon. I hereby certify that to the best of my knowledge, that the materials of construction and sizes of manufactured items, if any are stated correctly hereon." General Contractor o require that 2 copies of Red-lined Record Drawings be provided for all Public Drainage Infrastructure including Private Detention Facilities with the following attestations: "I hereby attest that I am familiar with the approved drainage plan and associated construction drawings and furthermore, attest that the drainage facilities have been constructed within dimensional tolerances prescribed by the Bryan & College station Unified Stormwater Design Guidelines and in accordance with the approved construction plans or amendments thereto approved by the City of College Station." (affix seal) Licensed Professional Engineer State of Texas No. ___ _ "I certify that the subdivision improvements shown on this sheet were actually built, and that said improvements are substantially as shown hereon. I further certify, to the best of my knowledge, that the materials of construction and sizes of manufactured items, if any, are stated correctly hereon." General Contractor '{:{ C1VIL DEVELOPMENT, Ltd.'{:{ CIVIL ENGINEERING & DESIGN-BUILD SERVICES P.O. Box 11929 · College Station, Texas 77842 · Phone: 979-764-7743 · Fax: 979-764-7759 Spring Creek Townhomes, Phase 2 Engineer's Estimate January 31, 2008 Item Description Unit Estimated Unit Price Total uantit Sitework & Pavement -·----------· -, -I Mobilization/Construction Staking LS 10,000.00 10,000 2 Clearing & Grubbing (w/onsite burning) AC 1.2 3,000.00 3,600 3 Excavation CY 1,900 6.00 I l,400 4 Mixing & incorporation of lime, 6" deep SY 3,807 2.25 8,566 5 , Hy_9!a~~ Lime J~b/sxL Ton 52 135.00 7,020 -- 6 6" Crushed Limestone Base SY 2,782 9.00 25 ,038 7 12" Hot Mix Asphaltic Concrete SY 2,782 9.50 26,429 8 Curb & Gutter (all types) LF 1,707 9.00 15,3 63 9 4" Sidewalk SF 6,191 3.50 21 ,669 10 Handicapped Ramp (regular) !_ EA 4 1 500.00 2,000 -- 11 !Handicapped Ramp (comer) EA 2 600.00 1,200 12 I 6" Concrete Apron SF 2,256 5.50 12,408 13 I Remove existing sidewalk SF 426 3.00 1,278 14 I Remove existing curb & gutter LF 67 , 5.00 335 15 Hl'.dromulch Seeding (back of curb to ROW, easements) SY 1,652 ' 0.65 1,074 Sitework and Paving Subtotal $147,379 Drainage System 16 18" RCP, structural backfill ---1----~ ' LF I 31' 59.00 1,829 17 24" HPDE, structural backfill LF 108 37.00 3,996 18 24" RCP, structural backfill LF 361 75.00 27 ,075 19 30" HOPE, non-structural backfill LF 37 48.00 1,776 20 }6" HPDE, structural backfill LF 191 63 .00 12,033 ·- 21 (6" HPDE, non-structural backfill LF 15 55.00 825 22 36" RCP, strnctural backfill LF 135 95.00 12,825 23 5' Recessed Inlet EA 2 2,900.00 5,800 24 1 O' Recessed Inlet EA 5 3,300.00 16,500 25 \ 15' Recessed Inlet EA 4,000.00 4,000 -~ -·-·------ 26 jConnect to Exisitng Junction Box EA l 2,000.00 2,000 27 Inlet Protection EA 8 100.00 800 28 Construction Exit EA l ,500.00 1,500 29 SWPPP Implementation & Maintenance LS I 2,500.00 2,500 30 TV InsEection LF 878 I l.00 9,658 Drainage Subtotal $103, l l 7 Water System 31 6" C909 Water Pipe, structural backfill LF 776 24.00 18,624 32 8" C909 Water Pipe, non-structural backfill LF 209 26.00 5,434 33 Fire Hydrant Asse mbly (w/ 6"x 6" tee, va lve, ve rt. extension) EA 2,950.00 2.950 34 8" M.J. Gate Valve EA l 1,000.00 1,000 35 6" M.J. Gate Valve EA 2 800.00 l,600 Spring Creek Townhomes, Phase 2 Engineer's Estimate January 31, 2008 Item I Description Unit Estimated I Quantity Unit Price Total 36 8"x 6" M.J. Tee 37 6" x 45° M.J. Bend 38 6" x 22.5° M.J. Bend 39 2" Blow Off Assembly 40 Connect to Exist_ing Water Line 41 I" Water Service :=: 15 ft (avg. length = 3 ft) 42 l" Water Service > 15 ft (avg. length = 43 ft) 43 1.5" Water Service :=: 15 ft (avg. length = 3 ft) 44 1.5" Water Service > 15 ft (avg. length= 43 ft) Sewer System EA EA EA EA EA EA EA EA EA ----,---I -42 6" PVC Sewer Line, D3034, SDR 26, structural backfill 1 LF 43 6" PVC Sewer Line, D3034, SDR 26, non structural backfill LF I 44 6" PVC Sewer Line, D224 l, SDR 26, structural backfill LF 45 8" PVC Sewer Line, D3034, SDR 26, structural backfill LF 46 8" PVC Sewer Line, D3034, SDR 26, non structural backfill LF 500.00 325.oo: 325.001 750.001 590.Q_Q j 600.00 500 975 1,625 1,500 500 1,300.00 1 12 750.00 1 600 1,300 9,000 3,000 2 1,500.ool Water Subtotal I $48,608 ---~IT - 20 80 60 - 30.00 18,300 25.001 2,5 50 33.00 660 34.00 2,720 ---__ 26_._00-+--_ 1,560 4 7 8" PVC Sewer Line, D224 l, SDR 26, structural backfill LF 48 Standard 4' Manhole, 0-10.00 ft depth EA 49 Standard 4' Manhole, 10.01-12.00 ft depth EA 50 Connect to Existing Manhole EA 51 6" Drop Structure EA 52 8" Drop Structure 53 6" PVC Cap 54 TV Inspection EA EA LF EA 20 1 3 Ii 1 35.00 700 2,900.00 2,900 3,100.00 9,300 2,000.00 2,000 750.00 750 ~~--+---~~--t~--~~ 892 7 1,000.00 50.00 3.50 500.00 55 4" Sewer Service :=: 15 ft (avg. length = 6 ft) 56 4" Sewer Service > 15 ft (av . !en th = 49 ft) EA 15 1,100.00 1,000 50 3,122 3,500 16,500 Sewer Subtotal! $65,612 ESTIMATED CONSTRUCTION I $364,716 l'ag<' 2 of 2