Loading...
HomeMy WebLinkAboutRespone to staff commentsOctober 13, 2010 WALTER P MOORE Attn: Erika Bridges City of College Station 1101 Texas Avenue, PO Box 9960 College Station, TX 77842 Re: Reply Comments for Engineering Document Comments for Tower Point Lots 7, 8, & 9 dated October 5 2010 via email from Erika Bridges WPM Project: 23.05040.10 Dear Erika: 1) NOI enclosed. 2) FYI comment. 3) C5.1 -05.4 PUEs are all shown and labeled. 4) C5.1 -05.4 All PUEs have been verified, adjusted, and labeled to 5.5 ft. If you have aspecificlocationyouarelookingatpleasenote, and we can place a dimension at that specific location. 5) Easements are shown and noted on plans. 6) All lateral lines have been revised to 7.8% or less. 7) C5.3 -5.4 Existing storm sewer and proposed sanitary sewer lines are all called out for crossing information. Crossing are also shown in profiles. 8) C5.1 -5.2 Flow line labels are indicated every 100ft. 9) C5.1 PUE's are noted as "New ", "Proposed ", or "Existing w /Book and Page ". The "new" PUE's are noted on the plans as proposed but not recorded for the previously approved plan set "Tower Point Infrastructure Development Site, Grading, & Utility Package" dated October 7 2009. 10) C5.2 Sanitary sewer stubouts are all 10ft minimum which is a full pipe length. 11) C5.2 Note is revised to 6 "x10" Tee. 12) C5.3 Sta 0 +00 is revised noting 2 gate valves. 13) C5.3 Waterline alignment has been adjusted and complies with the TCEQ horizontal separation. 14) C5.3 Line WL-1B is revised to 8.0" increased from 6.0" to provide additional fire protection west of Drive A. 920 MAIN STREET, TENTH FLOOR KANSAS CITY, MISSOURI 64105.2008 PHONE: 816.701.2100 FAX: 816.701.2200 HOUSTON DALLAS TAMPA ATLANTA ORLANDO KANSAS CITY AUSTIN LOS ANGELES LAS VEGAS www.WALTERPMOORE.coM Tower Point Lots 7,8, & 9 Package Page 2 of 2 15) C5.3 Sanitary Sewer easements have been removed and revised as PUE's. 16) C5.3 All easements are labeled as PUE's. 17) C5.3 -5.4 All proposed transformers are dimensioned from waterlines 4.0' or greater. 18) Sanitary Sewer report calculations have been revised. Please feel free to contact me with any questions or concerns as well as any additional information that you may need. Thank you. Sincerely, WALTER P. MOORE AND ASSOCIATES, INC. Shawn Cessna PE Senior Associate Enclosure: D Sanitary Sewer Report NOI information