Loading...
HomeMy WebLinkAboutDevelopment PermitCl Y OF COLLEGE. S IA11ON P! umng Uridolmen,+ vim DEVELOPMENT PERMIT PERMIT NO. 10 -38 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREARE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: Tower Point Ph.11A 949 William D. Fitch Pkwy. Lots 7, 8 & 9 Infrastructure DRAINAGE BASIN: Spring Creek DATE OF ISSUE: 12/17/10 VALID FOR 24 MONTHS OWNER: CONTRACTOR: Weiner Development (Andy Weiner) Brazos Valley Services (Ricky Palasota) 520 Post Oak Blvd, Ste. 850 6988 Raymond Stotzer Pkwy. Houston, TX 77027 College Station, Texas 77845 TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work of any kind may start until a Development Permit is issued. 2. No work beyond limits covered in permit is authorized. 3. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re- issued. 4. Development shall not be used or occupied until Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -pour) and post construction. 7. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits. 8. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 9. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken toinsurethatalldebrisfromconstruction, erosion, and sedimentation shall not be deposited in city streets, or existingdrainagefacilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention PlanSWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it isdeterminedthattheprescribederosioncontrolmeasuresareineffectivetoretainallsedimenton -site, it is theContractor's responsibility to implement measures that will meet City, State, and Federal requirements.10. All disturbed areas will be re- vegetated prior to Letter of Completion or Certificate of Occupancy.11. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with theLandscapingandTreeProtectionSectionoftheCity's Unified Development Ordinance, prior to any operations of thispermit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected andrequiredtoremainisstrictlyprohibited. The disposal of any waste material such as, but not limited to, paint, oil,solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited.12. All construction shall be in accordance with the stamped approved plans and specifications for the above -namedprojectandallofthecodesandordinancesoftheCityofCollegeStation, as well as State and Federal Regulationsthatapply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed. 13. Special Conditions: * *TCEQ Phase II Rules In Effect ** f241, z - - - Contractor I hereby grant this permit for development. Contact e ' Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections. 6/ y' DateCityEngineer / Repre entative the Contractor, hereby agree to comply with all conditions herein. 4Date the Public Works