Loading...
HomeMy WebLinkAbout13-1128BUILDING PERMIT CITY OF COLLEGE STATION 1101 TEXAS AVENUE, COLLEGE aTATION, TX 77840 PHONE: (979)764-3570 FAX: (979)764-3496 http://.bpinspect.cstx.gov ---------------------------------------------------------------------------- Application Number . . . . . 13-00001128 Date 9/29/14 Property Address . . . . . . 3101 HARVEY RD PARK Tenant nbr, name . . . . VETERAN'S PARK ADDITION Application type description COMMERCIAL, REMODEL/RENOVATION Subdivision Name . . . . . . Property Use Application valuation . . . . 850000 Owner Contractor ------------------------ ------------------------ JACODY INC. 2400 FROST DR COLLEGE STATION TX 77845 (979) 774-5613 --- Structure Information 000 000 NON-COMBUSTIBLE CONSTRUCTION Construction Type . . . . . NON-COMBUSTIBLE Occupancy T pe . . . . . . BUSINESS Other struc info . . . . . IMPACT/PRORATA FEES PAID NA INTERIOR WALL TYPE NA ---------------------------------------------------------------------------- Permit. . . BUILDING PERMIT Additional desc . . RAK Permit pin number . 1026111 Permit Fee . . . 00 Issue Date . . . . 9/29/14 Valuation . . . . 850000 Expiration Date . . 3/28/15 ---------------------------------------------------------------------------- Special Notes and Comments THIS PERMIT IS FOR A NEW BUILDING ADDITION FOR THE EAST DISTRICT MAINTENANCE BUILDING. *** COMPLY WITH 2012 INTERNATIONAL BUILDING CODES AND 2011 NATIONAL ELECTRICAL CODE. *** CONDITIONED OFFICE SPACE SHALL HAVE R-38 CEILING INSULATION. *** HOT WATER SERVICE REQUIRED TO ALL SINKS AND RESTROOM LAVATORY. *** PROVIDE ADDRESS ON COMMERCIAL BUILDINGS -FRONT: 5" ADDRESS NUMBERS, AND ON REAR DOOR(S): 2" HIGH ADDRESS NUMBERS AND NAME OF BUSINESS. FOR MULTI -FAMILY RESIDENTIAL PROVIDE DWELLING UNIT NUMBER ON FRONT DOOR AND IDENTIFY EACH DWELLING UNIT FROM A REAR FIRE LANE. IDENTIFY MULTI -FAMILY BUILDINGS WITH 12" BUILDING NUMBERS, VISIBLE FROM ALL ADJACENT NEARBY FIRE LANES. ALL NUMBERS AND LETTERS SHALL HAVE CONTRASTING BACKGROUNDS. *** THE TEXAS DEPARTMENT OF STATE HEALTH SERVICES REQUIRES AN "ASBESTOS SURVEY" FOR WORK INVOLVING DEMOLITION, REMODEL, RENOVATION TO EXISTING STRUCTURES & TENANT SPACES. EUILDING DEPT RErE�TTATIVE : APPLICANT: BUILDING PERMIT CITY OF COLLEGE STATION 1101 TEXAS AVENUE, COLLEGE STATION, TX 77840 PHONE: (979)764-3570 FAX: (979)764-3496 http://bpinspect.cstx.gov ---------------------------------------------------------------------------- Pa e 2 Application Number 13-00001128 Dae 9/29/14 ---------------------------------------------------------------------------- Special Notes and Comments ASBESTOS SURVEY SHALL BE SUBMITTED BEFORE ANY DEMO/MATERIAL REMOVAL WORK. FOR MORE INFORMATION ON-LINE VISIT: htt ://www.dshs.state.tx.us/asbestos/default.shtm OR ALL (512)834-6770 FOR MORE INFORMATION. *** ALL UTILITIES SHALL BE SHUT-OFF AND CAPPED -OFF PRIOR TO ANY DEMOLITION FOR SAFETY AND ENVIRONMENTAL ISSUES. SEWER PIPES CLOSED TO PREVENT RAIN OR STORM DRAINAGE TO ENTER. *** WHEN A BUILDING IS DEMOLISHED, THE ASSOCIATED SIGNS AND SIGN STRUCTURES SHALL ALSO BE REMOVED, PER SECTION 7.4 SUB -SECTION Y(5) OF THE U.D.O. *** Shall advertise only the name of, uses of, or goods or services available within the building, or tenant lease space, to which the banner is attached. Shall be mounted parallel to the face of the building. Shall not be cantilevered away from the structure. Shall not extend more than one foot from any exterior building face, mansard, awning, or canopy. Shall not obstruct any window, door, stairway, or other opening intended for,ingress, EGRESS, or for needed ventilation or light. Shall not be attached to any tree, fence, or public utility pole. ** NOTE FROM WATER DEPT: DOUBLE CHECK - REDUCED PRESSURE BACKFLOW PROTECTION ASSEMBLY REQUIRED FOR CAR WASH, POSTMIX CARBONATER, POOL AUTO -FILL, CHEMICAL TO WATER DEVICES, HEATING/AC UNIT WITH DIRECT CONNECTION TO WATER SUPPLY, WATER SUPPLY LINES SERVING A 3 -STORY BUILDING OR TALLER ABOVE GRADE, AND ALL LAWN IRRIGATION SYSTEMS. ** ALL BACKFLOW DEVICES MUST BE TESTED UPON INSTALLATION BY A CERTIFIED TESTER REGISTERED WITH THE CITY OF COLLEGE STATION PUBLIC UTILITIES DEPT. LAWN IRRIGATION MAY USE A PRESSURE VACCUM BREAKER. ALL DEVICES SHALL BE INSTALLED PER AWWA STANDARDS AND CITY'S ORD #2394. *** CONCRETE BLOCK CONSTRUCTION REQUIRE RE -ENFORCEMENT STEEL INSPECTION BEFORE THE STEEL IS COVERED -UP. ALL STEEL CONNECTIONS AND OVER -LAPPING TIED ENDS SHALL BE VISIBLE AT TIME OF INSPECTION. INSTALLATION SHALL BE PER APPROVED DESIGN, ANY CHANGES SHALL BE APPROVED BEFORE INSTALLED. *** INSTALL EMERGENCY LIGHTING IN ALL COMMON AREAS, CORRIDORS, EGRESS PATHS, AND EXTERIOR 'EXIT DISCHARGE' --------------------------- --- Ald --------------------- BUILDING DEPT REPt4ENTATIVE: APPLICANT: BUILDING PERMIT CITY OF COLLEGE STATION 1101 TEXAS AVENUE, COLLEGE'STATION, TX 77840 PHONE: (979)764-3570 FAX: (979)764-3496 http://bpinspect.cstx.gov Pa e 3 Application Number . . . . . 13-00001128 Dae 9/29/14 Special Notes and Comments LANDING AREAS AT EACH EXIT DOOR TO COMPLY WITH SECTION 1006.3 OF 2012 IBC. *** INSTALL EXIT SIGNS IN LOCATIONS AND ILLUMINATED PER SECTION 1011 OF THE 2012 IBC. SEE BUILDING CODES AND NOTES ON CITY STAMPED APPROVED BUILDING PLANS FOR EXIT SIGN LOCATIONS. GROUP R-1 (HOTELS)SHALL ALSO HAVE FLOOR -LEVEL EXIT SIGNS IN ALL AREAS SERVING GUESTROOMS, SECTION 1011.2. *** PROVIDE EXTERIOR LANDING (60" X 60" FOR ACCESSIBILITY) LEVEL WITH THE INTERIOR FLOOR AT EACH REQUIRED EXIT DOOR. ** PROVIDE FIRE EXTINGUISHER(S) - VERIFY LOCATION AND PLACEMENT WITH THE FIRE MARSHALL'S OFFICE (MIN. 2A10BC) *** GUARDRAILS SHALL COMPLY TO SECTION 1013 OF 2012 IBC. HEIGHT SHALL BE NO LESS THAN 42" AND OPENINGS SHALL NOT ALLOW THE PASSAGE OF A 4" SPHERE. *** POST PERMIT CARD ON JOB SITE TO BE VISIBLE FROM ROAD OR PARKING LOT. *** ANY CHANGES OR ALTERATIONS TO APPROVED BUILDING PLANS MUST BE RE -SUBMITTED AND APPROVED BEFORE WORK IS DONE IN ORDER TO ASSURE CODE COMPLIANCE. *** PROVIDE SANITARY FACILITIES/PORTA-CAN FOR WORKERS ON SITE LOCATED OFF THE PUBLIC RIGHHT-OF-WAY (STREET & SIDEWALKS) *** CONSTRUCTION ACTIVITY BETWEEN THE HOURS OF 10:OOPM AND 7:OOAM MUST COMPLY WITH THE NOISE ORDINANCE (MAX. 55 DBA). *** ALL IRRIGATION, PLUMBING, ELECTRICAL, MECHANICAL (HVAC) WORK MUST BE PERFORMED BY A LICENSED CONTRACTOR. CONTACT BUILDING DEPARTMENT FOR PERMITS PRIOR OR WORK, AND INSPECTIONS PRIOR TO COVERING ANY & ALL WORK, (979)764-3570. *** ELECTRICAL SHALL BE INSTALLED PER 2011 NATIONAL ELECTRICAL CODE AND LOCAL AMENDMENTS. ASSURE PROPER GFI LOCATIONS, INCLUDE ONE WITHIN 25 FEET OF OUTSIDE A/C UNITS. *** ALL CONSTRUCTION INSTALLATIONS SHALL COMPLY WITH THE 2012 INTERNATIONAL CODES, AND LOCAL AMENDMENTS (WWW.CSTX.GOV). *** WHEN WATER MAIN PRESSURE EXCEEDS 80 PSI, AN APPROVED PRESSURE REDUCING VALVE SHALL BE PROVIDED THAT LIMITS THE MAX. STATIC WATER PRESSURE TO 80 PSI OR LESS. *** SAFETY GLAZING REQUIRED IN WINDOWS WITHIN 24" OF DOORS IN ADJACENT WALLS, WITHIN 60" ADJACENT TO TUBS & WITHIN 60-- ABOVE 0"ABOVE WALKING SURFACE, ADJACENT TO STAIRWAYS WITHIN 36" AND LESS THAN 60" ABOVE WALKING SURFACE; COMPLY WITH SECTION 2406 OF 2012 IBC. *** PROVIDE MINIMUM 42" CLEARANCE FROM CENTERLINE OF WATER ---------------------------------------- BUILDING DEPT REPRE0F,N7AT,IVE : __ APPLICANT: ----------------------- BUILDING PERMIT CITY OF COLLEGE STATION 1101 TEXAS AVENUE, COLLEGE STATION, TX 77840 PHONE: (979)764-3570 FAX: -------------------------------=-------------------------------------------- Pa e 4 -----Application Number-_-_-_-_-_--13_00001128-------------Dae-- 9/29/14 ------------- ---------- S ecial Notes and Comments LOSET TO EDGE OF LAVATORY, WALL, OR OTHER OBJECT TO COMPLY WITH ICC/ANSI A117.1, ACCESSIBLE STANDARDS. CENTERLINE OF WATER CLOSET SHALL BE 18" FROM SIDE WALL. PROVIDE MINIMUM 60" WIDE X 56" DEEP CLEARANCE FOR ACCESSIBLE WATER CLOSET AND ALSO A 60" TURNING DIAMETER CIRCLE CLEARANCE. *** HANDRAILS SHALL COMPLY WITH SECTION 1012 OF THE 2012 IBC. HANDRAIL HEIGHT SHALL BE MOUNTED BETWEEN 34"-38" ABOVE STAIR TREAD NOSINGS AND FINISH RAMP WALKING SURFACE. PROVIDE HANDRAILS ON BOTH SIDES AND HANDRAIL EXTENSIONS AT THE TOP & BOTTOM OF EACH FLIGHT OF STAIRS OR RAMPS. *** PROVIDE PROTECTION FOR EXIT DOORS & REQUIRED EGRESS PATH, STRUCTURES, DUMPSTER ENCLOSURES, MECHANICAL, PLUMBING, AND ELECTRICAL EQUIPMENT FROM IMPACT OR BLOCKED BY AUTOMOBILES. *** SEE GENERAL INSPECTION CHECKLIST FOR COMMERCIAL, MULTI -FAMILY, AND/OR MIXED OCCUPANCY BUILDINGS. INSPECTION CHECKLIST AVAILABLE AT PLANNING & DEVELOPMENT SERVICES, CITY HALL, CITY OF COLLEGE STATION. (1101 TEXAS AVENUE) *** PROVIDE A KNOX BOX FOR FIRE DEPARTMENT ACCESS. A KEY FOR EACH SHELL BUILDING 'DOOR AND/OR TENANT ENTRY DOOR IS REQUIRED. CONTACT FIRE MARSHAL'S OFFICE (979)764-3705. ** REQUIRED EMERGENCY EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF KEY, TOOL, OR SPECIAL KNOWLEDGE/EFFORT. STOREFRONT EXIT DOORS WITHOUT A THUMB -LATCH REQUIRE STATEMENT "DOOR MUST REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED" ON THE DOOR WITH 1 INCH LETTERS. WITHOUT THE USE OF A KEY,TOOL OR SPECIAL KNOWLEDGE/EFFORT *** INTERIOR LIGHTING SHALL MEET THE CONTROLS AND WATTAGE LIMIT REQUIREMENTS OF CHAPTER 4 OF THE 2012 INTERNATIONAL ENERGY CONSERVATION CODE. *** PROVIDE LIGHTING REDUCTION CONTROLS (ABLE TO REDUCE ROOM/AREA LIGHTING BY AT LEAST 50 PERCENT)IN EACH ROOM WITH MORE THAN ONE LIGHT FIXTURE PER SECTION C405.2.1.2 OF IECC. *** PROVIDE AUTOMATIC TIME SWITCH CONTROLS AND OCCUPANCY SENSORS PER SECTIONS C405.2.2.1 & C405.2.2.2 OF IECC. ** All roof and ground -mounted mechanical equipment shall be sreened from view or isolated so as not to be visible from any public right-of-wa or residential district within 150 feet of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. Acceptable methods of screening rooftop ------------------------------------------CA_AA4�--------------------- BUILDING DEPT REPRES 7ATIVE: BUILDING PERMIT CITY OF COLLEGE STATION 1101 TEXAS AVENUE, COLLEGE'STATION, TX 77840 PHONE: (979)764-3570 FAX: (979)764-3496 http://bpinspect.cstx.gov Pa e 5 Application Number . . 13-00001128 Dae 9/29/14 ---------------------------------------------------------------------------- Special Notes and Comments equipment may include, but are not limited to encasement, parapet walls, or partition screens. * ALL OUTDOOR LIGHTING WITHIN DEVELOPMENTS OTHER THAN SINGLE-FAMILY RESIDENTIAL AND DUPLEXES SHALL MEET THE REQUIREMENTS OF SECTION 7.10 OF THE UNIFIED DEVELOPMENT ORDINANCE. LIGHT FIXTURES -THE LIGHT SOURCE (LIGHT BULB)SHALL NOT PROJECT BELOW AN OPAQUE HOUSING. NO FIXTURE SHALL DIRECTLY PROJECT LIGHT HORIZONTALLY. FIXTURES SHALL BE MOUNTED IN SUCH A MANNER THAT THE PROJECTED CONE OF LIGHT DOES NOT CROSS ANY PROPERTY LINES. *** FOUNDATION PIER AND PIER STEEL SHALL BE INSPECTED BEFORE COVER-UP OR ANY CONCRETE POUR. CALL 979-764-3570 TO SCHEDULE A FOUNDATION PIER STEEL INSPECTION. *** WHEN CONSTRUCTION PLANS ARE SEALED BY AN ARCHITECT OR ENGINEER, THE INSTALLATION SHALL COMPLY WITH SEALED PLANS. IF DURING CONSTRUCTION, A PROPOSED FIELD CHANGE SHALL BE COMMUNICATED TO THE DESIGN PROFESSIONAL, REVISED SEALED PLANS OR LETTER SUBMITTED TO BUILDING DEPT OFFICE AND REVIEWED PRIOR TO DESIGN CHANGE INSTALLATION. INSPECTIONS ARE BASED UPON CURRENT CODE & ON -FILE APPROVED SEALED CONSTRUCTION DOCUMENTS. ANY & ALL UN -AUTHORIZED FIELD CHANGES WILL NOT PASS BUILDING DEPT INSPECTION. ** AS PER THE ZONING ORDINANCE SECTION 12.3.L; ATTACHED SIGNS SHALL NOT EXTEND MORE THAN ONE FOOT AWAY FROM EXTERIOR BUILDING FACE ** PROVIDE SPECIAL INSPECTIONS FOR WELDED AND HIGH-STRENGTH BOLT STRUCTURAL CONNECTIONS PRIOR TO COVER-UP. THESE INSPECTIONS MUST BE CONDUCTED BY A LICENSED SPECIAL INSPECTOR. SUBMIT SPECIAL INSPECTION REPORTS TO OUR BUILDING DIVISION OFFICE, (979)764-3570. SUBMIT A FINAL SPECIAL INSPECTION REPORT, VERIFYING THAT ANY DEFICIENCIES FOUND IN PREVIOUS INSPECTIONS ARE NOW REPAIRED AND HAVE BEEN RE-INSPECTIONED. SUBMIT ALL SPECIAL INSPECTION REPORTS PRIOR TO CERTIFICATE OF OCCUPANCY. ** CONSTRUCTION CONTRACTS OVER $50,000 REQUIRE SUBMISSION TO THE STATE FOR ACCESSIBILITY REVIEW - CONTACT TDLR AT (512)463-3211, WWW.LICENSE.STATE.TX.US/ABPROJECTREGISTRATION FOR MORE INFORMATION. ** INSTALL FULL -OPEN SHUT-OFF VALVE ON WATER DISTRIBUTION SUPPLY PIPE AT THE ENTRANCE INTO THE STRUCTURE, ON THE DISCHARGE SIDE OF EVERY WATER METER,.... SECTION 606 OF IPC. *** INTERIOR WALL AND CEILING FINISHES SHALL COMPLY WITH THE 'FLAME SPREAD AND SMOKE-DEVELOPEMENT INDEX' ------------------------------ -- --- -- ------------------ BUILDING DEPT REPRESEW74TIVE: APPLICANT: BUILDING PERMIT CITY OF COLLEGE STATION 1101 TEXAS AVENUE, COLLEGE=STATION, TX 77840 PHONE: (979)764-3570 FAX: (979)764-3496 http://bpinspect.cstx.gov ---------------------------------------------------------------------------- We 6 Application Number . . . . . 13-00001128 e 9/29/14 --------------------7------------------------------------------------------- S ecial Notes and Comments CLASSIFICATIONS OF TABLE 803.9 OF THE 2012 IBC. ---------------------------------------------------------------------------- Fee summary Charged Paid Credited Due --------------------------------------------------------- Permit Fee Total .00 .00 .00 .00 Grand Total .00 .00 .00 .00 ----------------------------------------------- -kA44 r ----------------- BUILDING DEPT REPREPW/Tj,�IYE : ,-- APPLICANT: For,Office APPLICATION FOR BUILDING PERMIT Date: CITY OF COLLEGE STATION 1101 Texas Avenue Application No.:_ t/q" CITY of COLLEGE STATION College Station, TX 77840 Temp Pole No.:_ Home of TawsA&MUniwnig' 979.764.3570 / 979.764.3496 (Fax) WWW.CSTX.GOV Project Name (if applicable) City of College Station East District Maintenance Addition Project Address / Location 3101 Harvey Road, College Station, TX 77840 Lot Block Subdivision Veteran's Park Sec/Ph Business / Owner Name City of College Station Phone 979.764.3528 Contractor/ Homeowner Phone Contact Person for Review Comments Ed McDonald Phone 979.764.3528 Fax Electrician HVAC E-mail EMcDonald@cstx.gov Plumber Good Cents (Residential Only) ❑ New Construction* ❑ Duplex (Landscape Plans Required) ❑X Addition* ❑ Accessory / Storage* ❑ Demolition (Asbestos Survey Required) ❑ Location ❑ Retaining Wall ❑ Portable Storage (Residential) ❑ Moving ❑ Swimming Pool ❑ Portable Storage (Non -Residential) ❑ Shell Only ❑ Lawn Irrigation ❑ Remodel / Renovation (Asbestos Survey Required) ❑ Slab Only ❑ Solar Panels ❑ Carport / Patio Cover* ❑ Foundation Repairs* *NOTE: Some homeowner associations require architectural or design review committee approval for residential projects. The City of College Station recommends checking with your HOA (if applicable) prior to beginning construction. Description of Work kddition to existing city maintenance facility Proposed Use of Structure(s) Maintenance and workshop facility Texas Accessibility Standard (TAS) Project Registration No. EABPRJ EABPRJB3811444 Valuation $ g5 �� O©� Total Area 5,775 sf tr (Cost of Labor and Materials) Garage Type: ❑ None ❑X Public Sewer ❑ Septic System ❑ Sewer Tap Size ❑ Water Tap Size ❑ Other Tap Size ❑ Temp Pole ❑ Single ❑ Double ❑ Triple No. of Units No. of Bedrooms No. of Bathrooms Interior Wall Type Exterior Wall Type 7% Fourion Type Signature of Applicant: 4 ************************ Plans Examiner Heated Area ❑ Attached ❑ Detached Commercial Only Fire Sprinkler System: ❑ Yes �gNo Fire Alarm System: ❑ Yes rgNo Construction Type: -Jr-6 ********************************************** Official Use Only Comments: )9/ No Zoning Official Energy Code Compliance Information Insulation R value of exterior walls Insulation R value of ceiling (flat areas) Insulation R value of ceiling 2 (vaulted areas / no attic Glazing SHGC (Solar Heat Gain Coefficient) Glazing U -Factor R value of ductwork A/C SEER Rating * For Multi -Family or Commercial Projects, a ComCheck is required per the current Energy Code. * Residential Projects using foam insulation require the submittal of energy documents. * Verification of meeting thermal barrier and ignition barrier requirements shall be submitted to the City of College Station Building Division prior to issuance of the Certificate of Occupancy. Protection Against Subterranean Termites* ❑x Chemical Termiticide Treatment (Soil Treatment) ❑ Chemical Termiticide Treatment (Field Applied Wood Treatment) ❑ Physical Barriers ❑ Other R-19 NA _ o a-3 NA NA * Verification of Application shall be submitted to the City of College Station Building Division prior to issuance of the Certificate of Occupancy. Print Form COMcheck Software Version 3.9.2 Envelope Compliance Certificate 2012 IECC Section 1: Project Information Project Type: Addition Project Title : City of College Station: Maintenance Addition Construction Site: Owner/Agent: 3101 Harvey Road David J. Schmitz College Station, TX 77845 City of College Station 1000 Krenek Tap Road College Station, TX 77840 979.764.3415 Section 2: General Information Building Location (for weather data): College Station, Texas Climate Zone: 2a Building Space Conditioning Type(s): Nonresidential Building Type Floor Area Workshop 5775 Section 3: Requirements Checklist Envelope PASSES: Design 1% better than code. Climate -Specific Requirements: Designer/Contractor: Hawkins Architecture 7607 Eastmark Drive Suite 200 College Station, TX 77840 979.693.3179 Component Name/Description Gross Cavity Cont. Proposed Budget Area or R -Value R -Value U -Factor U-Factor(a) Perimeter Roof 1: Metal Building, Standing Seam: High Albedo Roof Exempt, Single Insulation Layer with Thermal Blocks (b), High Albedo Roof Exemption = Roof Over Conditioned Space With No Cooling Exterior Wall N: Concrete Block:6", Partially Grouted, Cells Insulated, Normal Density, Furring: None Overhead Door: Uninsulated Single -Layer Metal, Non -Swinging Overhead Door: Uninsulated Single -Layer Metal, Non -Swinging Exterior Wall N: Metal Building Wail, Single Layer Mineral Fiber Overhead Door: Uninsulated Single -Layer Metal, Non -Swinging Overhead Door: Uninsulated Single -Layer Metal, Non -Swinging Exterior Wall S: Concrete Block:6", Partially Grouted, Cells Insulated, Normal Density, Furring: None HM Door: Insulated Metal, Swinging Overhead Door: Uninsulated Single -Layer Metal, Non -Swinging Overhead Door: Uninsulated Single -Layer Metal, Non -Swinging Exterior Wall S: Metal Building Wall, Single Layer Mineral Fiber Overhead Door: Uninsulated Single -Layer Metal, Non -Swinging Overhead Door: Uninsulated Single -Layer Metal, Non -Swinging Exterior Wall E: Concrete Block:6", Partially Grouted, Cells Insulated, Normal Density, Furring: None HM Door: Insulated Metal, Swinging Exterior Wall E: Metal Building Wall, Single Layer Mineral Fiber 3357 0.0 30.0 0.032 U.U3b 494 --- 3.0 0.182 0.142 96 --- --- 1.000 1.000 96 --- --- 1.000 1.000 710 0.0 19.0 0.050 0.079 96 --- --- 1.000 1.000 98 --- --- 1.000 1.000 494 --- 3.0 0.182 0.142 21 --- --- 0.310 0.610 96 --- --- 1.000 1.000 96 --- --- 1.000 1.000 710 0.0 19.0 0.050 0.079 96 --- --- 1.000 1.000 96 --- --- 1.000 1.000 379 --- 3.0 0.182 0.142 21 --- --- 0.310 0.610 729 0.0 19.0 0.050 0.079 Project Title: City of College Station: Maintenance Addition Report date: 03/29/13 Data filename: H:\211.04_CoCS Vets Park Mai ntenance\211.04_CoCS Vets Park Maintenance2_COMcheck.cck Page 1 of 8 Floor 1: Slab -On -Grade: Unheated 221 --- --- --- (a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements. (b) Thermal spacer block with minimum R-3.5 must be installed above the purlin/batt, and the roof deck secured to the purlins. Air Leakage, Component Certification, and Vapor Retarder Requirements: ❑ 1. Air leakage of fenestration. Windows/non-glazed sliding and swinging doors/skylights with no weepage openings — 0.20 cfm/ft2. Skylights with weepage — 0.30 cfm/ft2. Curtain walls/storefront glazing <= 0.06 cfm/ft2. Doors: glazed swinging entrance/revolving/rolling — 1.00 cfm/ft2. Doors: garage <= 0.40 cfm/ft2. Exceptions: FJ Field -fabricated assemblies. Fi 2. Doors and access openings from conditioned space to shafts, chutes stairways and elevator lobbies are gasketed, weatherstripped or sealed. Exceptions: F-1 Door openings required to comply with International Building Code as per Section C402.4.4. F-1 3. Stairway and shaft vents are provided with Class I motorized dampers with a leakage rate <= 4 cfm/ft2. Dampers are installed with controls so that they are capable of automatically opening upon activation of any fire alarm or the interruption of power to the damper. ❑ 4. Outdoor air supply and exhaust openings are provided with Class IA motorized dampers having a leakage rate -4 cfm/ft2. Exceptions: LJ Gravity (nonmotorized) dampers having with a leakage rate -20 cfm/ft2 for ventilation air intakes protected from direct exposure to wind. F1 Gravity (nonmotorized) dampers having a leakage rate <=20 cfm/ft2 are permitted for exhaust and relief dampers for buildings less than three stories in height above grade, or where the design outdoor air intake or exhaust capacity <=300 cfm. F-1 Dampers smaller than 24 inches in either dimension are permitted to have a leakage <=40 cfm/ft2. F-1 5. Cargo doors and loading dock doors are weather sealed. ❑ 6. Building entrance doors have a vestibule equipped with self-closing devices. Exceptions: F1 Building entrances with revolving doors. FJ Doors not intended to be used as a building entrance by the public, or intended solely for employee use. F-1 Doors that open directly from a space less than 3000 sq. ft. in area. F-1 Doors used primarily to facilitate vehicular movement or materials handling and adjacent personnel doors. F1 Doors opening directly from a sleeping/dwelling unit. 7. Component R -values & U -factors labeled as certified. F1 8. No roof insulation is installed on a suspended ceiling with removable ceiling panels. F-1 9. 'Other' components have supporting documentation for proposed U -Factors. F] 10. Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that achieves the rated R -value without compressing the insulation. Except when instructed otherwise, edge joints between overlapping layers of continuous insulation are staggered. 11. Radiant panels and associated components, designed for heat transfer from the panel surfaces to the occupants or indoor space are insulated with a minimum of R-3.5 Minimum Skylight-Daylighting Requirements: ❑ 12. In enclosed spaces > 10,000 ft2 directly under a roof with ceiling heights >15 ft. and used as an office, lobby, atrium, concourse, corridor, storage, gymnasium/exercise center, convention center, automotive service, manufacturing, non -refrigerated warehouse, retail store, distribution/sorting area, transportation, or workshop, the following requirements apply unless exempted: F-1 The daylight zone under skylights is >= half the floor area; Lj The skylight area to daylight zone is >= 3 percent with a skylight VT >= 0.40; or a minimum skylight effective aperture >= 1 percent. Project Title: City of College Station: Maintenance Addition Report date: 03/29/13 Data filename: H:\211.04_CoCS Vets Park Mai ntenance\211.04_CoCS Vets Park Maintenance2_COMcheck.cck Page 2 of 8 Exceptions: rI Spaces where the proposed general lighting power densities < 0.5 W/ft2. ❑ Areas with obstructions that block direct beam sunlight on — 1/2 of the roof over the enclosed area for more than 1,500 daytime hours per year between 8 am and 4 pm. n Spaces where the daylight zone under rooftop monitors is > 50 percent of the enclosed space floor area. F -I 13.Skylights in office, storage, automotive service, manufacturing, non -refrigerated warehouse, retail store, and distribution/sorting area have a measured haze value > 90 percent unless designed to exclude direct sunlight. Section 4: Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed envelope system has been designed to meet the 2012 IECC require nts in O eck Version 3.9.2 and to comply with the mandatory requirements in the Requirements Checklist. AN,,M� C��kw�%�/� � � 6'f -d 6'Z())3 me - Title Signature Date Project Title: City of College Station: Maintenance Addition Report date: 03/29/13 Data filename: H:\211.04_CoCS Vets Park Maintenance\211.04_CoCS Vets Park Mai ntenance2_COMcheck.cck Page 3 of 8 2012 IECC COMcheck Software Version 3.9.2 Interior Lighting Compliance Certificate Section 1: Project Information Project Type: Addition Project Title : City of College Station: Maintenance Addition Construction Site: Owner/Agent: 3101 Harvey Road David J. Schmitz College Station, TX 77845 City of College Station 1000 Krenek Tap Road College Station, TX 77840 979.764.3415 Section 2: Interior Lighting and Power Calculation A Designer/Contractor: Hawkins Architecture 7607 Eastmark Drive Suite 200 College Station, TX 77840 979.693.3179 B C D Floor Area Allowed Allowed Watts Watts / ft2 Workshop 5775 1.4 avoo Total Allowed Watts = 8085 Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. Workshop (5775 sq.ft) Linear Fluorescent (Type A): ICF-232-UNV-EB81: Cooper Lighting - Metalux 1'x4': 48" T8 2 33 32 1056 32W: Electronic: Linear Fluorescent (Type B): 2GR8-232A-UNV-EB81: Cooper Lighting - Metalux 1'x4': 48" 2 6 32 192 T8 32W: Electronic: Linear Fluorescent (Type C): VT3-232DR-UNV-EB81-WL-8L-SSL: Cooper Lighting Vaportite 1'x4': 48" T8 32W: Electronic: 32 64 Incandescent (Type E): Sure-Lites CU2: Cooper Emergency Lights: Other: 1 4 5.4 21.6 Total Proposed Watts = 1334 Section 4: Requirements Checklist Lighting Wattage: F-1 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Wattage: 8085 Proposed Wattage: 1334 Complies: YES Mandatory Requirements: F1 2. Dwelling units (complete independent living facilities) within commercial buildings are not required to comply with interior lighting requirements of this code provided that —75 percent of the permanently installed fixtures other than low voltage lighting contain only high efficacy lamps. 3. Manual Controls: Each enclosed space has manual lighting control. Remotely located manual controls are labelled for area of service and indicate on/off status. Exception(s): rl Security/emergency areas with 24-hour operation. [] Stairways/corridors that are means of egress. Project Title: City of College Station: Maintenance Addition Report date: 03/29/13 Data filename: H:\211.04_CoCS Vets Park Maintenance\211.04_CoCS Vets Park Maintenance2_COMcheck.cck Page 4 of 8 rl 4. Light Reduction Controls: Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either controlling all luminaires, dual switching of alternate rows of luminaires, alternate luminaires, or alternate lamps, switching the middle lamp luminaires independently of other lamps, or switching each luminaire or each lamp. Exception(s): ❑ Only one luminaire (lamp < 100 W) in space. rI An occupant -sensing device controls the area. ❑ The area is a corridor, equipment/store rooms, restrooms, public lobby, elec./mech. room, or sleeping unit. LJ Areas that use < 0.6 Watts/sq.ft. Lj Daylight spaces having automatic daylighting controls. ❑ 5. Automatic time switching controls are installed and have an override switching device. The override switching device allows for <= 2 hour operation cycle within spaces <= 5000 sq.ft., manual operation, and is readily accessible and located where the operation of the connected lights are visible or communicated to the switch. Exception(s): F -I Sleeping units, patient care areas; and spaces where automatic shutoff would endanger safety or security or where lighting is intended for 24-hour operation. LJ Emergency egress lighting. ❑ Spaces where lighting is controlled with occupancy sensors. ❑ Malls, arcades, auditoriums, single tenant retail spaces, industrial facilities and arenas that are <= 20,000 sq.ft. are permitted exceed the 2 -hour operation cycle limit when a captive key device override switch is installed. Lj 6. Occupant sensors are installed in the following spaces and automatically turn lighting off within 30 minutes of all occupants leaving the space: Classrooms, conference/meeting/training rooms, employee lunch and break rooms, private offices, storage/janitorial rooms, restrooms, and other spaces <= 300 sq.ft. Automatic -on sensors set power on <50 percent power. Exception(s): ❑ Full power automatic -on controls are permitted where manual -on operation would endanger the safety or security of the room or building occupants. ❑ 7. Daylight zones have either individual lighting controls independent from that of the general area lighting that are either manual or automatic and serve zones — 2,500 sq.ft. Zones under skylights more than 15 feet from the perimeter have lighting controls separate from daylight zones adjacent to vertical fenestration. Exception(s): F -I Contiguous daylight zones spanning no more than two orientations are allowed to be controlled by a single controlling device. LJ Daylight spaces enclosed by walls or ceiling height partitions and containing two or fewer light fixtures are not required to have a separate switch for general area lighting. Lj 8. Automatic daylight zone controls are capable of reducing power to < 35 percent using continuous dimming ballasts and daylight -sensing controls OR, are capable of automatic power reduction using step -dimming multi-level switching and daylight -sensing controls having at least two control channels per zone and at least one control step in the 50 - 70 percent range and another <= 35 percent of design power. F -I 9. Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. ❑ 10. Separate control device for display/accent lighting, case lighting, task lighting, nonvisual lighting, under-shelf/cabinent lighting, lighting for sale, and demonstration lighting. 1771 11. Hotel/motel sleeping units and guest suites have control device(s) at the entry door that control all permanent luminaires and switched receptacles. F1 12. Exit signs 5 Watts or less per sign. f–i 13. Tandem wired one -lamp and three -lamp ballasted luminaires (No single -lamp ballasts). Exception(s): L] Electronic high -frequency ballasts. n Luminaires not on same switch. F1 Recessed luminaires 10 ft. apart or surface/pendant not continuous. F -I Luminaires on emergency circuits. II 223MMI 111. .. Section 5: Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed lig ing Sys m has been designed to meet the 2012 IECC requirements in COMcheck Version 3.9.2 and to comply with the mandato quir is in the Requirements Checklist. ,4Nn 1 TAW S (A A� It c Name - Title Si ature Date Project Title: City of College Station: Maintenance Addition Report date: 03/29/13 Data filename: H:\211.04_CoCS Vets Park Maintenance\211.04_CoCS Vets Park Maintenance2_COMcheck.cck Page 5 of 8 2012 IECC Section 1: Project Information Project Type: Addition Project Title : City of College Station: Maintenance Addition Exterior Lighting Zone: 2 (Light industrial area with limited nighttime use) Construction Site: Owner/Agent: Designer/Contractor: 3101 Harvey Road David J. Schmitz Hawkins Architecture College Station, TX 77845 City of College Station 7607 Eastmark Drive Suite 200 1000 Krenek Tap Road College Station, TX 77840 College Station, TX 77840 979.693.3179 979.764.3415 Section 2: Exterior Lighting Area/Surface Power Calculation A B C D E F Exterior Area/Surface Quantity Allowed Tradable Allowed Proposed Watts Wattage Watts Watts / Unit (B x C) Facade (Illuminated area of facade wall or surface) 2000 ft2 0.1 No 200 150 Maintenance Yard (Special feature area) 20000 ft2 0.14 Yes 2800 241 Total Tradable Watts* = 2800 241 Total Allowed Watts = 3000 Total Allowed Supplemental Watts** = 600 * Wattage tradeoffs are only allowed between tradable areas/surfaces. ** A supplemental allowance equal to 600 watts may be applied toward compliance of both non -tradable and tradable areas/surfaces. Section 3: Exterior Lighting Fixture Schedule A B C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. Facade ( Illuminated area of facade wall or surface 2000 ft2): Non -tradable Wattage LED 1: XTOR3A: LED Wall Pak: Other: 1 5 30 150 Maintenance Yard ( Special feature area 20000 ft2): Tradable Wattage LED 2: VSTB10LEDEUT3AIS-SA1033BZ: Cooper Lighting Ventus Series: Other: 1 1 241 241 Total Tradable Proposed Watts = 241 Section 4: Requirements Checklist Lighting Wattage: ri 1. Within each non -tradable area/surface, total proposed watts must be less than or equal to total allowed watts. Across all tradable areas/surfaces, total proposed watts must be less than or equal to total allowed watts. Compliance: Passes. Controls, Switching, and Wiring: F1 2. All exemption claims are associated with fixtures that have a control device independent of the control of the nonexempt lighting. F-1 3. Lighting not designated for dusk -to -dawn operation is controlled by either a a photosensor (with time switch), or an astronomical time switch. Project Title: City of College Station: Maintenance Addition Report date: 03/29/13 Data filename: H:\211.04_CoCS Vets Park Mai ntenance\211.04_CoCS Vets Park Maintenance2_COMcheck.cck Page 6 of 8 4. Lighting designated for dusk-to-dawn operation is controlled by an astronomical time switch or photosensor. F-i 5. All time switches are capable of retaining programming and the time setting during loss of power for a period of at least 10 hours. Exterior Lighting Efficacy: Fi 6. All exterior building grounds luminaires that operate at greater than 100W have minimum efficacy of 60 lumen/watt. Exceptions: Lj Lighting that has been claimed as exempt and is identified as such in Section 3 table above. LJ Lighting that is specifically designated as required by a health or life safety statue, ordinance, or regulation. L] Emergency lighting that is automatically off during normal building operation. ❑ Lighting that is controlled by motion sensor. Section 5: Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed lighting system has been designed to meet the 2012 IECC requirements in fC'OMcheck Version 3.9.2 and to comply with the mandato uire e s ' Requirements Checklist. f lYbEl n✓ %� A �^(J g2cfti7-UO l(Jl3 Name - Title S nature Date Project Title: City of College Station: Maintenance Addition Report date: 03/29/13 Data filename: H:\211.04_CoCS Vets Park Mai ntenance�211.04_COCS Vets Park Maintenance2_COMcheck.cck Page 7 of 8 2012 IECC Section 1: Project Information Project Type: Addition Project Title : City of College Station: Maintenance Addition Construction Site: 3101 Harvey Road College Station, TX 77845 Owner/Agent: David J. Schmitz City of College Station 1000 Krenek Tap Road College Station, TX 77840 979.764.3415 Section 2: General Information Building Location (for weather data): College Station, Texas Climate Zone: 2a Section 3: Mechanical Systems List Quantity System Type & Description Section 4: Requirements Checklist Section 5: Compliance Statement Designer/Contractor: Hawkins Architecture 7607 Eastmark Drive Suite 200 College Station, TX 77840 979.693.3179 Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed me ical systems have been designed to meet the 2012 IECC, Chapter 8, requirements in COMcheck Version 3.9.2 and to comply with th dato r uirements in the Requirements Checklist. Name -Title S gnature Date Section 6: Post Construction Compliance Statement Lj HVAC record drawings of the actual installation, system capacities, calibration information, and performance data for each equipment provided to the owner. Lj HVAC O&M documents for all mechanical equipment and system provided to the owner by the mechanical contractor. n Written HVAC balancing and operations report provided to the owner. The above post construction requirements have been completed. Principal Mechanical Designer -Name Signature 1971M Project Title: City of College Station: Maintenance Addition Report date: 03/29/13 Data filename: H:\211.04_CoCS Vets Park Maintenance\211.04_CoCS Vets Park Maintenance2_COMcheck.cck Page 8 of 8 CITY OF COLLEGE STATION Planning d' Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 April 16, 2013 Application #: 13-1128 Re: City of College Station, Veteran's Park, East District Maintenance Shop Addition — 3101 Harvey Road Dear Mr. Ed McDonald & Andrew Hawkins, I have completed the plan review for the above referenced project and have the following comments. The plan review is based on the 2012 International Codes, the 2011 National Electrical Code, ANSI A117.1-2009 Accessibility Standards, and our local amendments. Where appropriate, I have included the applicable code sections. 1. Provide Valuation (cost of labor and materials). 2. Provide R-38 insulation on top of ceiling of new Break Room & Office. 3. Submit Special Inspection Statement for structural welded & high-strength bolt connections. 4. Verify that hot water supply is provided to restroom lavatories. The review does not include any civil or zoning issues or NRA requirements of the Unified Development Ordinance. Please respond to plan review comments at your convenience. Three (3) copies of revised plan sheets with clouded revisions addressing these comments and a response letter will be required. Should you have any questions, contact me at 979-764- 3754. Thank You, 4_� Benjamin McCarty Commercial Plans Examiner NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "clouded" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. page 1 of 1 City of College Station Home of Texas A&M University City of College Station Page of `J Building Inspection Department PLANS EXAMINATION REPORT wap 1`� Date: Address:AAA- • Project Name: / C� PJ�i"" �r )e �� �f% %r•�C'� �l/�c��ytR✓L�'�— ! k� F'' ° .�� � Drawing Code Questions or Comments Number Ref. Number 5)�,w c" 0 a ii S ray' elI n, ,,�-�r'if C c 11 G 10 (,l r,� J*.4 • akove- V �jrPn�� va�ac� C.e Y Ve Date: Received by: THINK+CREATE+SUSTAIN T 979.693.3179 F 979.693.8370 7607 Eastmark Dr, Suite 200 Coi;ege Station, TX 77840 HawkinsArch.com August 9, 2013 Benjamin McCarty, Commercial Plans Examiner Application #:13-1128 Re: City of College Station, Veteran's Park, East District Maintenance Shop Addition 3101 Harvey Road Dear Benjamin McCarty: The following package includes the modifications addressed below 1) Provide Valuation (cost of labor and materials). Estimated construction cost of this facility is facility is estimated at $850,000 2) Provide R-38 Insulation on top of ceiling of new Break Room and Office. The modifications to the areas have been made to provide R-38 insulation in the areas requested. 3) Submit Special Inspection Statement for structural welded & high-strength bolt connections. This facility is planned as a pre-engineered metal building and no field welded or high strength bolted connections are anticipated and therefore code does not require the need for special inspections. 4) Verify that hot water supply is provided to restroom lavatories. The existence of hot water in the existing restrooms has been verified. It is supplied. If there are any additional concerns, please contact me at 979.693.3179. Sincerely, Andrew Hawkins, AIA, LEED AP President, Principal Architect Hawkins Architecture, Inc. Attachment(s): (*400r� CITY OF COLLEGE STATION Home of Texas A&M University' FOR OFFICE USE ONLY CASE NO.: DATE SUBMITTED: TIME: STAFF: PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. ❑ New Project Submittal ❑ Incomplete Project Submittal - documents needed to complete an application. Case No.: Z Existing Project Submittal. Case No.: 13-1128 Project Name City of College Station, East District Maintenance Shop Addition, 3101 Harvey Road Contact Name Andrew Hawkins Phone Number 979.693.3179 We are transmitting the following for Planning & Development Services to review and comment (check all that apply): ❑ Comprehensive Plan Amendment ❑ ❑ Rezoning Application ❑ ❑ Conditional Use Permit ❑ ❑ Preliminary Plan ❑ ❑ Final Plat ❑ ❑ Development Plat ❑ ❑ Site Plan ❑ ❑ Special District Site Plan FX1 ❑ Special District Building / Sign ❑ Landscape Plan Non -Residential Architectural Standards Irrigation Plan Variance Request Development Permit Development Exaction Appeal FEMA CLOMA/CLOMR/LOMA/LOMR Grading Plan Other - Please specify below Requested Permit Modifications INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: ❑ Comprehensive Plan Amendment ❑ Waterline Construction Documents ❑ TxDOT Driveway Permit ❑ Sewerline Construction Documents ❑ TxDOT Utility Permit ❑ Street Construction Documents ❑ Drainage Letter or Report ❑ Easement Application ❑ Fire Flow Analysis ❑ Other - Please specify Special Instructions: 10/10