HomeMy WebLinkAboutNG PRR Addendum 01Public Restroom Northgate Area Addendum 1- Civil Construction Documents February 19, 2009 Sheet C2 1. Note added to the plan: “Contractor to protect the existing ATM machine on the parking lot island (to remain) during construction.” 2. Note added to the plan: “Contractor to salvage existing decorative bollards and return to the City of College Station”. 13 Total 3. Note added to the plan: “Contractor to protect existing sidewalks on site that are not noted for demolition.” 4. Note added to the plan: “Contractor to remove the pavement and base in all areas of pavement removal for the new construction.” 5. The tree on the west side of the restroom in the parking lot island is surrounded by pavers. This modification has been added to the plan. 6. Note added to the plan: “Contractor to install 6’ high chain link perimeter fence around the limits of construction to secure the site during construction.” Sheet C3 1. The 18” HDPE Storm pipe from Station 0+00 to Station 1+05 has been changed to 18” RCP pipe. 2. The 12” HDPE Storm pipe from Station 1+05 to Station 1+09.5 has been changed to 12” PVC pipe. 3. 27 Lf of 6” PVC Drain Pipe has been added to the plan along the rear wall of the restroom to tie into the roof downspouts. This line ties into the junction box at the end of the trench drain as shown on C3a attached. Sheet C5 4. Tree protection added to trees in the vicinity of construction. Sheet C5a has been included in this Addendum to show the trees requiring tree protection. Detail of the tree protection per City of College Station site design standards has included in this Addendum. 5. Erosion Control Silt Fence has been added on the east side of the site. Erosion Control Silt Fence Detail is according to the City Standard SWPPP details. Sheet C5a has been included in this Addendum for reference of these changes.