Loading...
HomeMy WebLinkAboutDrawings0 I N Plan: 8 f Seiner Main S \, N 03 o PROJECT BENCHMARK. p, TOP NUT FH �� \ I rr' r w Existing Sewer E/ev = 271.83 `t' 1 J C Main N.• 10216245.25 v` _ £.•3563397.95 j r' o SERVICE CLEAN-OUT �' I Station= l +94.72 " `a Existing 12' Water Main1-7 �I w Approx. Location�Q.��lL � FA. 1x9 M UNIVER S 60' R.O.W. o EX/ST/NG MANHOLE v� PROPOSED SEWER SERV/CE. / Station=0+00.00 .�` 61.84' of 4' PVC w/ I ------_-- -- - --- 49.00' of Steel Casing Existing +00.;_...:.- -0+50 1 +00 -- & rs ® 1.00.`C Sewer Main -� = S-81 =S-8 - �1 -S I PROPOSED SEWER MA/N.• PROPOSED MANFIOL / 132.89' of 8' Station=4+50.80 DIP ® 0.JJX ' f Plan: 8" Se user Main Profile Scale: 1" = 40' Horizontal 1 " = 4' Vertical -0+50.00 0+00.00 0+50.00 1+00.00 1+50.00 276.00 272.00 268.00 264.00 260.00 256.00 0 �11 fl �i 2+00.00 2+50.00 � O Elevations N N T W o� 280.00 276.00 272.00 268.00 264.00 260.00 256.00 -0+50.00 0+00.00 0+50.00 1+00.00 1+50.00 2+00.00 2+50.00 -PIPE TABLE 49.00' of 8 SIZE LENGTH 132.89' of 8" DIP ® 0.33% Steel Casing wl 1.00% 8" 132.89' SS Spacers ® DIP PROPOSED SEWER SERVICE 4" 61.84' 1.00% PVC O:�NO4 it ON NN �Q) o 3 Oh 11 p ° 00 -Z-JO 00 CZ 3563278.59 CS cz�rZrz V_N W Q. 0 `'� N1-� yUccd �Z� rowro �� cow W o .o � P° Z � O Elevations N N T W o� 280.00 276.00 272.00 268.00 264.00 260.00 256.00 -0+50.00 0+00.00 0+50.00 1+00.00 1+50.00 2+00.00 2+50.00 -PIPE TABLE NAME SIZE LENGTH SLOPE MATERIAL PROPOSED SEWER MAIN 8" 132.89' 0.33% DIP PROPOSED SEWER SERVICE 4" 61.84' 1.00% PVC STRUCTURE TABLE STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT NORTHING EASTING RIM = 270.51 EXISTING MANHOLE INV IN = 266.95 EXISTING SEWER MAIN, 8" " PVC EXISTING SEWER MAIN, 8" PVC 10216093.50 3563278.59 INV IN = 266.88 PROPOSED SEWER MAIN, 8 DIP INV OUT = 266.78 RIM = 270.25 PROPOSED MANHOLE INV IN = 267.42 PROPOSED SEWER SERVICE, 4" PVC PROPOSED SEWER MAIN, 8" DIP 10216166.39 3563389.70 INV OUT = 267.32 SERVICE CLEAN-OUT RIM = 268.41 INV OUT = 268.04 PROPOSED SEWER SERVICE, 4" PVC 10216226.76 3563376.29 Note: 1. Contractor shall verify location of all existing utility lines and services prior to construction. 2. Final placement of all open cut sewer line shall be determined in the field, staked for alignment, clean outs and connections and approved by the City's Inspector prior to installation. 3. All proposed manholes for this project shall be ordered only after the Contractor has field verified the conditions of the new manhole. 4. Service crossing shall be by Mechanical Dry Bore, on grade, as shown on the plans. 5. See Sheet Cl for complete project notes. Sewer Alain, Plan & Profill General Notes: 1. All utilities shown are takenfzjom the best available informatvion based on construction ut llity documents obtained by J4 Engineering from City and Independent agencies and/or above ground field evidence. Shown positions may not represent as -built conditions. 2. Property lines shown in these plans are for reference only end do not necessarily represent actual field conditions. 3. All construction shall be Iin accordance with the current BCS Standard Specifications, Details, and Design Guidelines for Water, Sewer, Streets, and Drain ge, unless otherwise noted. 4. It is the intent of these plans I to comply with all City of College Station guidelines, details, �nd specifications. II cr ��� Q get . < 0� �\0 Q #0 No. I Revision/Issue Firm Name and Address: gpr 1 Cf�4 i @ sy X Cft ^ 0 [ I 31 Engllu In PO Box 5192 - Bryan, Texas - 778t 979-739-0567 www.J4Engmeermg. Firm# 9951 Project Name and Address: Earl Rudder @ University Business Office Lot 1, Block 1, Plantation Oaks Addition---1.27AC College Station, Brazos County, Date: Sheet: May2012 Scale: C As Noted