HomeMy WebLinkAboutDrawingsAustin White
Limestone �4
14,
STUCCO
COLUMN
100,
stone pilaster
STUCCO
Austin White
Limestone
COLUMN
STONE LEDGE
150'
SOUTH ELEVATION
FA_ ELL
STUCCO
— COVERED FRONT
PORCH
Austin White
Limestone
6' Bollard
COVERED FRONT
PORCH
r,-_
3' 6'
�' . j- I
P-1 '.1—COLUMN 1 COLUMN
COLUMN
'-
V-4'
\--STONE LEDGE
12'
50'
COVERED FRONT
PORCH
Austin White
Limestone
6' Bollard
Stone Pilaster—-\ STUCCO
- COVERED FRONT
PORCH
2'_3' COLUMN
STONE LEDGE
S
.F
, C
at
c
u
l
a
t
ion
s
NORTH ELEVATION
2,426.9 FRONT ELEVATION
693,68 Glass
2
9%
497.94 Stone 20%
1,233.27 Stucco
517.
Z.
............ ....
....................
UW
12'
Austin White COLUMN
",>,it . L,0LU_ULU Wul IZR
EAST I ELEVA �ION
EM�
c6
- COVERED FRONT
PORCH
2'_3' COLUMN
STONE LEDGE
S
.F
, C
at
c
u
l
a
t
ion
s
NORTH ELEVATION
2,426.9 FRONT ELEVATION
693,68 Glass
2
9%
497.94 Stone 20%
1,233.27 Stucco
517.
Z.
Pilaster
0.
UW
12'
Austin White COLUMN
",>,it . L,0LU_ULU Wul IZR
EAST I ELEVA �ION
EM�
c6
0z
VJ
z
W
0
zo
W
13
C
Lj
OW
L12�
LLJ
0,;
L
Ljj
M
=1
CIO
0) C
z x A
'z
oaf-
L3
W
00
C-4
8,40%
Pilaster
iii
I
T
1' 4'
y.
5 o, nspouts
Stone Pilaster-- 5'x5' Downspouts Spaced Accordingly.
5'x5l Downspouts ace CMU Spaced Accordingly.
Split F
Spaced Accordingly.
5'x5l Downspouts
pjjaster_
3'-4'
Stone )1x51 Downspouts Spaced Accordingly.
spaced —100, S.F. Ca cu a ons
51x51 Downspouts �pacel, Accordingly.
Accordingly, si S.F. Calculations F Elevations
Downspouts split Face CMU Spaced Acc Calculations Of Stone
5 x5 t�
Accordingly. Face CMU
spaced Acc 50' S.F, Calculations O_F::S�Uit�F 0�-�L_ 6,IDN
036.3 OVERALL STORE
NORTH _E L F V A T.— 1,949.4 OVERALL STORE 32% 518.62 OVERALL STORE 8.59% 426.9 FRONT ELEVATION
412.62 FRD1NT ELEVATION 177. 2, •
1,949.4 REAR ELEVATION Building materials FRONT ELEVATION 1,949.4 REAR ELEVATION
0 % 0 REAR ELEVATION LEFT ELEVATION
CMU 1,949.4 REAR ELEVATION 100 53.0 Lff-'c_T ELEVATION 6.38% 830 HT ELEVATION
NORTH ELEVATION 1,949.4 Split face CMU 1007- 1 Split Face 586 LEFT ELEVATION 70% RIGHT ELEVATION 6.387. 30 RIG
2 Stucco 586 RIGHT ELEVATION 707. 5310 —
3 Austin White Limestone
4 Sherwin Williams Sw6129CatcuLatlo
Restrained Gold S,F, Calculations SE, CaL uLatlons S. fi
5 Store Front Glass O -P Paint Color
G -P S UCC -0 26%. 656.36 OVERALL STORE 10.9%
OVERALL STORE 2 1576.87 GVERA STORE FRONT ELEVATION 277.
ij FRONT ELEVATION 51% 656.36
1,576,87 7
FRONT ELEVATION 51% 233.27 E! ENATION 0 REAR ELEVATION
1,233.27 0 REAR _E PO% 0 LEFT ELEVATION
0 REAR ELEVATION 20% 171.8 LEFT ELEVATION 20% 0 RIGHT ELEVATION
171.8 LEFT ELEVATION L
171.8 RIGHT ELEVATION 20% 171.8 RIGHT ELEVATION
"a
12'
Austin White COLUMN
",>,it . L,0LU_ULU Wul IZR
EAST I ELEVA �ION
EM�
Limestone 2'-6'
tar
48'
LEDGEEAST
830 EAST ELEVATION
830
ELEVATION
STONE
�0.
62.2 Stone 8,40%
S.F. OL LcuLoLt!O
STONE LEDGE
I
1 8 21%
171;.8 Stucco
8 split face CMU 70.6%
WES I ELEVA I
WESIA:L�EVATION
586
830 EAST ELEVATIONFAC11"
L3
11_1'LEMAN DR,
8,40%
'
BUILDING -1TN1f_ SQUARE FOOTAG
62.2 Stone
21%
200.00 S.F.
171,8 Stucco
Split face CMU 70.6%
586
REAR CMU WALL
EXTENDED TO SCREEN
WALL
REAR CMU MECHANICAL. T
y OVER DO 0
EXTENDE_D',T0 SC
MECHANIC
1.
REAR CMU WALL
EXTENDED TO SCRE
A KlTr'Al-------- T
iii
I
T
1' 4'
y.
5 o, nspouts
Stone Pilaster-- 5'x5' Downspouts Spaced Accordingly.
5'x5l Downspouts ace CMU Spaced Accordingly.
Split F
Spaced Accordingly.
5'x5l Downspouts
pjjaster_
3'-4'
Stone )1x51 Downspouts Spaced Accordingly.
spaced —100, S.F. Ca cu a ons
51x51 Downspouts �pacel, Accordingly.
Accordingly, si S.F. Calculations F Elevations
Downspouts split Face CMU Spaced Acc Calculations Of Stone
5 x5 t�
Accordingly. Face CMU
spaced Acc 50' S.F, Calculations O_F::S�Uit�F 0�-�L_ 6,IDN
036.3 OVERALL STORE
NORTH _E L F V A T.— 1,949.4 OVERALL STORE 32% 518.62 OVERALL STORE 8.59% 426.9 FRONT ELEVATION
412.62 FRD1NT ELEVATION 177. 2, •
1,949.4 REAR ELEVATION Building materials FRONT ELEVATION 1,949.4 REAR ELEVATION
0 % 0 REAR ELEVATION LEFT ELEVATION
CMU 1,949.4 REAR ELEVATION 100 53.0 Lff-'c_T ELEVATION 6.38% 830 HT ELEVATION
NORTH ELEVATION 1,949.4 Split face CMU 1007- 1 Split Face 586 LEFT ELEVATION 70% RIGHT ELEVATION 6.387. 30 RIG
2 Stucco 586 RIGHT ELEVATION 707. 5310 —
3 Austin White Limestone
4 Sherwin Williams Sw6129CatcuLatlo
Restrained Gold S,F, Calculations SE, CaL uLatlons S. fi
5 Store Front Glass O -P Paint Color
G -P S UCC -0 26%. 656.36 OVERALL STORE 10.9%
OVERALL STORE 2 1576.87 GVERA STORE FRONT ELEVATION 277.
ij FRONT ELEVATION 51% 656.36
1,576,87 7
FRONT ELEVATION 51% 233.27 E! ENATION 0 REAR ELEVATION
1,233.27 0 REAR _E PO% 0 LEFT ELEVATION
0 REAR ELEVATION 20% 171.8 LEFT ELEVATION 20% 0 RIGHT ELEVATION
171.8 LEFT ELEVATION L
171.8 RIGHT ELEVATION 20% 171.8 RIGHT ELEVATION
"a
i
1 \:
NOTES:
1. BASIS OF BEARINGS IS TRUE NORTH OBTAINED BY SOLAR
OBSERVATION.
2. NO LOT LIES WITHIN THE ZONE "A" SPECIAL FLOOD HAZARD AREA
INDICATED ON THE F.E.M.A. FLOOD INSURANCE RATE MAP FOR
BRAZOS COUNTY, TEXAS AND INCORPORATED AREAS. COMMUNITY
NO. 481195, MAP NO. 48041 CO350E. EFFECTIVE DATE: MAY
16, 2012. BASE FLOOD ELEVATIONS ARE NOT DETERMINED FOR
ZONE "A". ALL DEVELOPMENT WITHIN THE 100—YEAR FLOODPLAIN
SHALL COMPLY WILL ALL APPLICABLE ORDERS AND REGULATIONS,
INCLUDING BUT NOT LIMITED TO BRAZOS COUNTY'S "FLOOD DAMAGE
ORDER". A FLOODPLAIN PERMIT SHALL BE OBTAINED FROM THE
COUNTY ENGINEER'S OFFICE PRIOR TO THE CONSTRUCTION OF ANY
STRUCTURE(S) WITHIN THE FLOODPLAIN.
3. THERE IS A 16' PUBLIC UTILITY EASEMENT AND A 10'
HOMEOWNER'S ASSOCIATION EASEMENT ALONG THE RIGHT OF WAY
FRONTAGE OF ALL LOTS.
4. THERE IS A 20' PUBLIC UTILITY EASEMENT CENTERED ON ALL
SIDE AND A 10' PUBLIC UTILITY EASEMENT ON ALL REAR LOT
LINES.
5. BUILDING LINE SETBACKS ARE AS FOLLOWS:
FRONT SETBACK: 50'
SIDE SETBACK: 15'
REAR SETBACK: 25'
6. FRONT, REAR, AND SIDE SETBACKS SHALL CONFORM TO THE
SPECIFICATIONS OF SUBDIVISION PLATS AS ESTABLISHED BY THE
COMMISSIONERS COURT, BRAZOS COUNTY, TEXAS, FOR
SUBDIVISIONS SITUATED OUTSIDE THE BOUNDARIES OF ANY
INCORPORATED TOWN OR CITY IN BRAZOS COUNTY, TEXAS.
7. CONTOURS BASED ON DATA PROVIDED BY THE CITY OF COLLEGE
STATION.
8. ALL LOTS ARE TO HAVE INDIVIDUAL ON SITE SEWAGE FACILITIES.
9. ALL LOTS ARE SUBJECT TO THE REQUIREMENTS AND RESTRICTIONS
DELINEATED IN THE COVENANTS, CONDITIONS, RESERVATIONS, AND
RESTRICTIONS OF THE SUBDIVISION.
10. THERE IS A MINIMUM 50' WIDE DRAINAGE BUFFER (25' ON EACH
SIDE OF THE CENTERLINE OF ALL DRAINAGE WAYS). SEE THE
DEED RESTRICTIONS OF THE SUBDIVISION FOR ADDITIONAL
INFORMATION.
11. H.O.A. EASEMENTS ALONG ALL STREETS RUN PARALLEL TO AND
ADJACENT TO THE PUBLIC UTILITY EASEMENTS SHOWN HEREON.
H.O.A. EASEMENT ACTIVITIES AND/OR INFRASTRUCTURE WILL BE
REFERENCED IN THE DEED RESTRICTIONS OF THE SUBDIVISION.
12. NOTES FROM THE BRAZOS COUNTY HEALTH DEPARTMENT:
a.) ALL LOTS SERVED BY AN OSSF MUST COMPLY WITH
COUNTY AND STATE REGULATIONS. NO OSSF MAY BE
INSTALLED ON ANY LOT WITHOUT THE ISSUANCE OF AN
"AUTHORIZATION TO CONSTRUCT" ISSUED BY THE BRAZOS
COUNTY HEALTH DEPARTMENT UNDER THE PROVISIONS OF
THE PRIVATE SEWAGE FACILITY REGULATIONS ADOPTED BY
THE COMMISSIONERS COURT OF BRAZOS COUNTY,
PURSUANT TO THE PROVISIONS OF SECTION 21.084 OF THE
TEXAS WATER CODE. NO OSSF DRAIN FIELD IS TO
ENCROACH ON THE 100—FOOT SANITARY ZONE OF PRIVATE
WATER WELLS OR 150 FEET OF PUBLIC WATER WELLS. A
SANITARY ZONE MUST BE CLEARLY- DELINEATED AROUND ALL
EXISTING PUBLIC OR PRIVATE WELLS ON THE SUBDIVISION
PLAT OR WITHIN 150 FEET OF THE SUBDIVISION BOUNDARY.
b.) ALL LOTS WILL BE REQUIRED TO HAVE A SITE/SOIL
EVALUATION ON FILE WITH THE BRAZOS COUNTY HEALTH
DEPARTMENT BEFORE ON—SITE SEWAGE FACILITY MAY BE
CONSTRUCTED.
c.) ON—SITE SEWAGE FACILITIES DISPOSAL AREAS SHALL NOT
ENCROACH THE 100 FOOT OR THE 150 FOOT SANITARY
ZONE OF A PRIVATE OR PUBLIC WELL, RESPECTIVELY. A
SANITARY ZONE MUST BE CLEARLY DELINEATED AROUND ALL
EXISTING WELLS ON THE PLAT.
13. WELLBORN SPECIAL UTILITY DISTRICT WILL PROVIDE WATER
SERVICE FOR THE SUBDIVISION. BRYAN TEXAS UTILITIES WILL
PROVIDE ELECTRIC SERVICE FOR THE SUBDIVISION.
14. 1/2" IRON RODS SHALL BE SET AT ALL CORNERS UNLESS
OTHERWISE INDICATED.
15. EXISTING LAND USE: VACANT/AGRICULTURAL
PROPOSED LAND USE: SINGLE FAMILY RURAL RESIDENTIAL
16. ALL LOTS ARE PREDOMINANTLY DENSE VEGETATION.
17. ALL STRUCTURES SHALL BE CONSTRUCTED WITHIN 500 FEET OF A
FIRE HYDRANT AS MEASURED ALONG THE RIGHT—OF—WAY.
PRELIMINARY PLAN
P.U.E. UNE
H.O.A. EASEMENT LINE
PROPOSED WATER LINE
PHASE UNE
PROPERTY UNE
ren
ACREAGE CALCULATIONS
OF
GES OF INDIAN LAKES
PHASE XVII
[36.36 ACRE TRACT -19 LOTS
J. M. BARRERA SURVEY, A-69
H.G. HUDSON SURVEY, A-141
BRAZOS COUNTY, TEXAS
SCALE: 1 " = 100' MAY 10, 2013
SHEET 1 OF 1
OWNED AND DEVELOPED BY:
SMILING MALLARD DEVELOPMENT, LTD.
3608 EAST 29TH STREET, SUITE 100
BRYAN TEXAS 77802
(97,) 846-4384 _- _ _ __ --
PREPARED BY: ENGINEER/SURVEYOR:
11LING MALLARD DEVELOPMENT, LTD. MCCLURE 8 BROWNE ENGINEERING
3608 EAST 29TH STREET, SUITE 100 1008 WOODCREEK DRIVE, SUITE 103
BRYAN TEXAS 77802 COLLEGE STATION, TEXAS 77845
(97�) 846-4384 (979) 693-3838
N
SCALE : 1" = 1,500'
.00ATION WITHIN INDIAN LAKES
P.O.B. POINT OF BEGINNING
P.U.E. PUBLIC UTILITY EASEMENT
H.O.A. HOME OWNERS' ASSOCIA77ON
ESMT. EASEMENT
R.O.W. RIGHT—OF—WAY
PVMT PAVEMENT
71
VICINITY MAP
TOTAL LOT COUNT
TOTAL LOT ACREAGE
TOTAL H.O.A. COMMON AREA ACREAGE
TOTAL RIGHT—OF—WAY ACREAGE
19 LOTS
31.45 AC
0.73 AC
4.18 AC
TOTAL ACREAGE OF PHASE XVII
36.36 AC
ACREAGE CALCULATIONS
OF
GES OF INDIAN LAKES
PHASE XVII
[36.36 ACRE TRACT -19 LOTS
J. M. BARRERA SURVEY, A-69
H.G. HUDSON SURVEY, A-141
BRAZOS COUNTY, TEXAS
SCALE: 1 " = 100' MAY 10, 2013
SHEET 1 OF 1
OWNED AND DEVELOPED BY:
SMILING MALLARD DEVELOPMENT, LTD.
3608 EAST 29TH STREET, SUITE 100
BRYAN TEXAS 77802
(97,) 846-4384 _- _ _ __ --
PREPARED BY: ENGINEER/SURVEYOR:
11LING MALLARD DEVELOPMENT, LTD. MCCLURE 8 BROWNE ENGINEERING
3608 EAST 29TH STREET, SUITE 100 1008 WOODCREEK DRIVE, SUITE 103
BRYAN TEXAS 77802 COLLEGE STATION, TEXAS 77845
(97�) 846-4384 (979) 693-3838
N
SCALE : 1" = 1,500'
.00ATION WITHIN INDIAN LAKES
P.O.B. POINT OF BEGINNING
P.U.E. PUBLIC UTILITY EASEMENT
H.O.A. HOME OWNERS' ASSOCIA77ON
ESMT. EASEMENT
R.O.W. RIGHT—OF—WAY
PVMT PAVEMENT
71
VICINITY MAP