HomeMy WebLinkAboutDrawingsWest Elevation Stone Area
226.6 (10.5%)
Stucco Area
108 (5.0%)
Transparency Area
252(11.6%)
Batten Area 1
275.5 (12.7%)
Lap Siding Area
1,131 (52.2%)
Shingle Area
174.9 (8.0%)
Total Area 2,168 (100%)
Stone Area 622 28.7% Stucco Area--' 293.7
_ East Elevation -
Transparency Area 291 (13.4%) Batten Area 470(21.7%)
Lap Siding Area 373.3 (17.2%) Shingle Area 118 (5.4%)
Total Area 2,168 (100%)
�11W/111
• • • e
Smooth Lap Siding Cementious
SW 6136 SW :0
Oklahoma Stone 1" to 12" Hardi-Siding
Veneer Board and Batten Wall
SW 6136
Chopped Oklahoma
Fieldstone 4" Veneer
Paint Color Noire Paint Harmonic Tan
SW 6127 SW 6136
(AlI Stucco Areas)
Proposed Building Material Palette
For Permitting / Pricing
Es
Concept Rendering
Stepping Stone
SCHOOL
1910 Justin Lane
Austin, Texas USA 78757
p 1 512 459 0258
f 1 512 467 1824
steppingstoneschool.com
Early Childhood Development
CONSULTANTS
PROJECT NAME
Stone Area 171 (13.3%) Stucco:�Area 124 (9.7%) Stepping Stone XX
- North .(rear)Elevation ; � _ _ � . _ , _ - __ - - __ i _ r
—�+ `
Transparency Area 287 (22:3%) Batten:�r-ea- 2�9.G-(2't:0� CQ��ege �7�at�Qn �Q(,�tl"�
- Lap Siding Area 330.75 (25.8%) Shingle Area 102(7.9%) _ 205 Rock Prairie Road
Total Area 1,284.4 (100%) College Station, Texas 77845
LEGAL DESCRIPTION
LOT 1, BLOCK FOUR
EDELWEISS BUSINESS CENTER
RECORDED IN VOLUME 3544, PG 117
South (Street) Elevation Stone Area 358.4 (27.9%) Stucco Area 170 (13.2%)
Transparency Area 271.5 (21.1%) Batten Area 0(0%)
Lap Siding Area 340.5 (26.5%) Shingle Area 144(11.7%)
Total Area 1,284.4 (100%)
Building Totals
Stone Area 1,378(20%) Stucco Area 695.7 (10111 %)
Transparency Area 1,101.5 (16%) Batten Area 910.1 (13�%)
Lap Siding Area 2,280.6 (33.2%) Shingle Area 508.9 (7.� %)
Total Area 6,874.8 (1 0%)
IF THIS DOCUMENT IS NOT SIGNED,
SEALED, AND DATED, IT MAY NOT BE
USED FOR REGULATORY APPROVAL,
PERMIT, OR CONSTRUCTION.
',,.
• •. N.•N•N N.•.• •••• M1• ••... .....•••
••.••
REVISION # DATE
NRA Comment Revisions 08/18/2011
� 1
Add 3 bay windows of 18" projection from
r
building facade. Material to be board and
batten siding to contrast lap siding beyond
with metal shed roof.
Add material percentages (%) per facade
C
of different material used.
Q
SHEET TITLE(S)
NRA Submittal
REVISION DATE:
ISSUE DATE:
PROJECT NUMBER:
26 July, 201
1100
REVEVVED
CONA
SEP 0 2011
� 1
PLT FII D:
r
immommEll
1/8 1) = 1 3-077.
1/4 33 = 1 '-0"
or Permittinn / F
1/8" = 1'-015
steppu6
mol
sch
a�
Ha
KA Submitt;;
n tin
f"
�)1
4
y M ��
§
}
1/8" = 1'-015
steppu6
mol
sch
a�
Ha
KA Submitt;;
1/8 11 = 13-0"
1/833 = 1,-0„
1/4 37 = 1'-0"
or Permitting / P
mm
1/8"
= 1'-0"
Ift
FIXI
Ift
I c
RP"
ME,
ire
M
1/8"
= 1'-0"
Ift
FIXI
Ift
I c
1
1/8 13
/8" = 1'-0"
1 /4" = 1'-0"
or Permittina / N
P, qqm
t
1
aeons
school
mil
} »..wo,�..�L, 3 w.a.1,11.
1�
F.?a
•I•
L
40
1
aeons
school
mil
} »..wo,�..�L, 3 w.a.1,11.
1�
F.?a
•I•
L
40
1
1/8 13
/8" = 1 7-0"
1/4 )y = 17-0"
or Ppwmittinn / P
Fi
4
}
L'
a
3'a`.�_
4, xt i a
1/8 11 = 1 14"
Std` orf
1.�
`'ane
, o o
w '
f
41tai
a�ew�redvM ..
KA Su
0