Loading...
HomeMy WebLinkAboutDrawingsZONED R-7 NOW OR FORMERLY ALLEN R. SWOBODA MANUFACTURED NOME PARK PROPERTY LINE: L= 11.44' S 44058'10" N EXISTING 6.0' PRIVACY= MASONRY WALL PROPERTY LINE: L= 35.06' S 45005'14" W 272.78 NG+ -I- NG 275.03 N �R 1 •-�In n. � Z � .. Q �. O ON N l FL 272.8 EXISTING -- RIP RAP FOR EROSION CONTROL /I TOP 274.0 TOP OB BERM SPILLWAY 274.0 273'6 i SPILLWAY 273.7 # 3 R E B A R @ 15" O.C.B.W. 1.0' F.L. ELEV. F.L. ELEV. 272.7 272.6 ^ ,RAM A ,IPP RAP u 1O 611 4" THICK SLAB JJ 2.70 2.761_T PROFILE TC 273.26 CUT EXISTING CURB NG 275.32 5 I Tt7= FL AN U"v REFERENCE: NONE SCALE:0=10'-0" NORTH DETAIL1 4" THICK SLAB 3.01#3 BARS @ j 151, O.C.B.W. I.I65' t 0.67' 1 1.165, 1 � .I 2.70 it 2.70 PLAN TOP OF BERM EL=274.0 EL=273.6 4 EL 22I�4.0 1.0' F4„ 0 4" DETENTION POND #3 REBAR 411 NEI R STRUCTURE DETAIL o.67' 4 4" NOT TO SCALE EL=272. _T WEIR $ SPILLWAY X -SECTION AREA RIP EROSION PROTECTION ZONED C-1 -I- 274.7q EXISTING UNDERGROUND ELECTRICAL CONDUIT (1) 4" PVC PIPE - 36" DEEP) .275.30 T + 274.80 c+ + 275.15 BLOCK D ZONED C-1 NOW OR FORMERLY 226 S.W. PARKWAY ENTERPRISES EXISTING PARKING BM TOP OF MANHOLE BM 274.60 3 I im 2ciAPRI Li I IR I RON ROD MH -11-133 IP IRON PIPE CGS CM = CONCRETE MARKER SRM Io Z 5/F SET OR FOUND 444.71P t.fl - 22JULYII 27G.444Z LU ROW = RIGHT OF WAY I� 7 tY N BL BUILDING LINE IL O W V / Lu ry fL 1 PAE PARKING/ACCESS EASMT. Z J 274.28 �t co OL r__ N m O N � - z 3 (�/ -I o L(1 4.8 � TC 375.18 O� W Z I >- 3 a � � I � 273.90 (EVERYTHING EXISTING EXCEPT FOR PROPOSED ADDITION) DETAIL 2 ' 1.0' ' # 4 CONTINUOU BARS 4" 6n #3 18" O.C.L411TIE BARS EXPANSION JOINTS AT 25' CONTRACTION JOINTS AT 15' FLUrlE NTS 17 DETAIL 3 J !Z WEIR I 6' O P P. L. N E I R LOCATION NTS 275.87 EROSION CONTROL I, THE CONTRACTOR SHALL BE RESPONSIBLE FOR SEDIMENTATION CONTROL DURING CONSTRUCTION AND SHALL TAKE THE NECESSARY STEPS TO MITIGATE THE AMOUNT OF SOIL AND DEBRIS ORIGINATED AT THE SITE AND CARRIED ONTO PUBLIC RIGHTS OF WAY, WATER COURSES AND ADJACENT PROPERTY. TO THIS EFFECT THE CONTRACTOR SHALL INSTALL A SILTING BARRIER ALONG THE LOWER ENDS OF THE LAND BEING DISTURBED AS SHOWN HERE AND ACCORDING TO THE DETAIL SHOWN ON THIS SHEET. 2: THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING A CONSTRUCTION ENTRTANCE, MINIMUM 50' LONG AND MINIMUM OF 12' WIDE CONSISTING OF ROCK -RUBBLE WITH PIECES 1-1/2" TO 3-1/2" IN DIAMETER, A'MINIMUM OF 6" DEEP. SHOULD THE CONTRACTOR USE ANOTHER ENTRANCE HE SHALL BE REQUIRED TO INSTALL A CONSTRUCTION ENTRANCE AT EACH ADDITIONAL ENTRY POINT WHERE MUD IS TRACKED ONTO CITY STREETS. 3. ALL STORM DRAINAGE INLETS IN THE PROJECT AREA SHALL BE PROTECTED DURING CONSTRUCTION FROM RUNOFF SEDIMENTATION BY A G" HIGH BARRIER MADE UP OF 20 -LB HAY FILLED BURLAP BAGS (OR EQUIVALENT BARRIER). 4. ALL DISTURBED GROUND, INCLUDING DETENTION POND SHALL BE SODDED OR AT LEAST SEEDED AT THE CONCLUSION OF CONSTRUCTION TO REDUCE SILTING. 5. RIP -RAP SHALL BE 20 LB. PIECES, ROCK RUBBLE ON PLASTIC LINER. 5OUARE FOOTAGE EXISTING FOOTAGE ...........2,255.041 NEW FOOTAGE .................. 444.741 i LEGEND 2ciAPRI Li I IR I RON ROD MH -11-133 IP IRON PIPE CGS CM = CONCRETE MARKER SRM MOC MARK ON CONCRETE 444.71 5/F SET OR FOUND 444.71P IRFC IRON ROD FOUND CAPPED 22JULYII FG FENCE CORNER ROW = RIGHT OF WAY BB BACK TO BACK OF CURB BL BUILDING LINE PUE PUBLIC UTILITY EASMT. EE ELECTRICAL EASEMENT DE DRAINAGE EASEMENT AE ACCESS EASEMENT PAE PARKING/ACCESS EASMT. EM L ELECTRIC METER ET ELECTRIC TRANSFORMER E/P/L ELECTRICAL/POLE/LIGHT MH L MANHOLE CO - CLEAN OUT WM= WATER METER W/V WATER/VALVE 55 SANITARY SEWER FH FIRE HYDRANT GM = GAS METER T/B = TELEPHONE PEDESTAL C/TV = CABLE TV AC = AIR CONDITIONER OH = OVERHANG EOP = EDGE OF PAVEMENT PE = PEDESTRIAN EASEMENT TC TOP OF CURB NG-' NATURAL GROUND BM L BENCHMARK ( R) RECORDED ( M) ;,= MEASURED NOTES: W I. ALL CONSTRUCTION MATERIALS AND METHODS SHALL CONFORM WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF COLLEGE STATION. w 2.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE EXACT DEPTH * LOCATION OF ALL EXISTING UNDERGROUND UTILITIES PRIOR TO uj CL }' �.5 COMMENCING ANY WORK. ALL EXISTING UTILITY LOCATIONS SHOWN HERE ARE _j Lu z APPROXIMATE. THE CONTRACTOR SHALL PROTECT ALL UNDERGROUND UTILITIES Li z �L AFFECTING THIS PROJECT. U T 1.1-! 0Y 3 -THE CONTRACTOR SHALL NOTIFY ALL UTILITIES AT LEAST DAYS PRIOR V c Q TO START OF CONSTRUCTION: Q u -O Q WATER AND SEWER SERVICES - 764-3638 W 3 z COLLEGE STATION ELECTRICAL SERVICES - 764-3638 Z 0 C/ - TXU GAS - 775-1624 VERIZON SOUTHWEST - 321-4303 3 < COX COMMUNICATIONS - 776-7766 O W DIG TESS - 1-800-344-3877 Z 3 4. ALL LINEAR DIMENSIONS ARE IN FEET UNLESS OTHERWISE OTED. U) 5 . TH I S PROPERTY DOES NOT LIE WITHIN AN IDENTIFIED 100 -YEAR FLOOD PLAIN ACCORDING TO FEMA MAP # 48041C 0182C, DATED J ILY 2 1gg2. `9 G. BACKFILL MATERIAL SHALL BE COMPACTED TO A MINIMUM F q6% OF MAXIMUM N DENSITY AS DETERMINED BY ASTM D 6q8 IN OPEN AREAS AND q5% UNDER PAVEMENT AND STRUCTURES. 7. THE CONTRACTOR SHALL MAINTAIN ACCURATE RECORDS OF ANY CONSTRUCTION CHANGES IN ORDER TO PREPARE "AS -BUILT DRAWINGS" WHICH SHALL BE SUBMITTED TO THE CITY WITHIN 30 DAYS OF COMPLETION OF CONSTRUCTION. B. CONTRACTOR SHALL BE RESPONSIBLE TO SECURE GEOTEC NICAL ENGINEERING SERVICES IF REQUIRED BY OWNER. q•THE CONTRACTOR SHALL COORDINATE ALL PROPOSED WOR AND PROCEDURES ' WITH THE CITY OF COLLEGE STATION. E0. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION LAYOUT AND SURVEYING SERVICES. 11. DETENTION POND SHALL BE PRIVATELY MAINTAINED. 12. BERT; SLOPES IN POND SHALL BE 3 TO 13. THE CONTRACTOR TO PERFORM A ---ONE- TIME CLEAN--UP--OF- THE DRAINAGE EASEMENT THROUGH LOT q (OFF SITE) TO ALLOW STORM ATER RUN-OFF. � 14. ALL ROOF AND GROUND -MOUNTED MECHANICAL EQUIPMENT 'SHALL BE SCREENED FROM VIEW OR ISOLATED SO AS NOT TO BE VISIBLE FROM ANY PUBLIC RIGHT-OF-WAY OR RESIDENTIAL DISTRICT WITHIN 150' OF THE SUBJECT LOT, MEASURED FROM 5' ABOVE GRADE. SUCH SCREENING SHALL BE COORDINATED WITH THE BUILDING ARCHITECTURE t SCALE TO MAINTAIN A UNIFIED APPERANCE. F 15. EXTERIOR BUILDING AND SITE LIGHTING WILL MEET THE STANDARDS OF SECTION 7.10 OF THE UNIFIED DEVELOPMENT ORDINANCE. THE LIGHT'SOURCE SHALL NOT PROJECT BELOW AN OPAQUE HOUSING AND NO FIXTURE SHALL DIRECTLY PROJECT LIGHT HORIZONTALLY. FIXTURES WILL BE MOUNTED IN SUCH A MANNER THAT THE PROJECTED CONE OF LIGHT DOES NOT CROSS ANY PROPERTY LINE. l(ot SECTION A -A NTS 6.0' MASONRY WALL TOP OF POND 274.0' lo' I.o' 273.0' 3.2' 00 3.0 273.0' DETAIL 4 T -POST DRIVEN ' 2- 1/2" REINF. BAR PER HAY BALE HAY BALE -- SEDIMENT CONTROL -7 FABRIC FLOW SILT FENCING NTS INFOWATION OWNER INFORMATION: GOLDEN KEYS INVESTMENT, LLG HERBERT BOOKER 246 SOUTHWEST PARKWAY E COLLEGE STATION, TEXAS 77840 (q79) 676-2129 BUILDER INFORMATION: MARIOTT HOMES, INC. LARRY MARIOTT 20q ROCK PfyARIE COLLEGE ST ;TION, TEXAS 77845 (979) 696-17$7 SYM50L LEGEND -W__; WATER LINE ® WATER METER _G___ -GAS LINE IP I IRRIGATION METER -s- SEWER LINE FH -E- ELECTRIC LINE 1110111FIRE HYDRANT -F- CHAIN LINK FENCE UNE p ELECTRIC METER LOT: 8D / BE .. BLOC`;: D ,��N t i9 t VF F aan< z �' 1 h j I .. y E-n� ...,E Y � 5 � SUBDIVISION. 1 � ASHFORD S I UARE COLLEGE STATION, TEXAS BRAZOS CO NTY M -M DESIGN 15 NOT AN ENGINEERING FIRM NOR AN ARCHITECTURAL FIRM. WE ARE NOT QUALIFIED NOR ARE WE LICENSED TO DESIGN STRUCTURAL FRAMING OR FOUNDATIONS. ( A LICENSED PROFESSIONAL ENGINEER SHOULD BE CONSULTED REGARDING STRUCTURAL FRAMING AND FOUNDATION. SHOULD A ENGINEER'S SEAL BE PRESENT ON THE DRAWING, THEN THE "ENGINEER OF RECORD" SHALL BEAR THE SOLE RESPONSIBILITY FOR THE STRUCTURAL DESIGN. M -M DESIGN WILL NOT BE HELD RESPONSIBLE FOR THE STRUCTURAL DESIGN AND/OR ANY PROBLEMS THAT MAY ARISE REGARDING THE DESIGN. DATE: 2ciAPRI Li I PROJECT: MH -11-133 DRAWN: CGS CHECKED: SRM HEATED: 444.71 SLAB: 444.71P REVISION: 22JULYII SHEET NUMBER SHEET 02 OF 02 2�5 3o -}- 274.7q + 274.80 TC� + 275.15 272.78 NG+ -}- NG 275.03 +NG 275.32 ZONED C-1 CONTRACTOR TO PROVIDE UNDERGROUND ELECTRICAL CONDUIT (1) 4" PVC PIPE - 36" DEEP) ELECTRIC 80'-5" M SERVICE ENTRANCE (I TOP OF WATER II MANHOLE LINE 5u I ENTRANCE 80'-1" BM 274.60 21 -I AC PAD F7I I PROPOSED ` WATER METER P OPERTp, L F: 150.55' - N 45°2 6" W II 274.51 _ 275.3 _ - _ S .0 % a IGATION PROPOSED 2757 METER A` E 1 o W o D', W �� W E W _ W -W W IRR2j 7.51 BUILDING 4z"-- ��� � C 27 ....�IM T 75 56 I _Q..off _ C, c W 9 :y. J I I2 »I �� € �\ \ C- FIRE "� 2751._-& N of I m 3 o LANES LO �� W 18'-o Z 6 22'-6'1 6 I 275........._ d LO \ oq 7 z IwL LLA a I I I 3 i cn II I o LL Ln EXISTING O *15HED ELAT � SI < L0� OI SLOPE 27 .4 W LEARN ING 1--e z ' I SLOPE I / - � I,aB M I I � ji--,�V/- � _ I II z o ``-FINISHED ELEVATION ��-�- SD ZONED � _ � _ I HANDRAIL , Ln NOW OR FORMERLY }- SILTING FE CE �� II W � W o N i I I W � ALLEN R. SWOBODA WDETAIL wW EXISTING CONCRET (I tY) MANUFACTURED NOME w oN �� DRIVEWAY II w z � ' cn �' t 1 I� � PARK O ~ W W i -t-•1 t RAI IN - G '. - - c - - - - W z _. IFF _-ECFV. = ' 275.5 _-- --�- � .. �_ r TO -RAIL MOUNTED ) j[ Q B WEEN 34" - 38" I I �/ T' 1 N \ )( N PROPERTY LINE: L= 11.44' S 44058'10" W 6.0' PRIVACY MASONRY WALL PROPERTY LINE: L= 35.06' S 45005'14" W \:2 74.26 -}-I I Q j5 `. Q z - I ( 1 - TRAsu R s� 7.5' BSL �� i I Q- Lu W z NG 274. / --1 2 3 : 2%NorTSLOPE E r -1 Q - PL: 150.g1' N 45022'46" W I z z W 274.28 �..i� 1 I I •--I COLORED AND i t< < TEXTURED= CONCRETE I I W h U 3 W r _ co t - N Q- 7.5' BUI DINGO LIN boov o CO IL o 0600 II r W6 7q' -(p ll- 0("� �� S ^' -- 5' 18' RIP RAP AREA MINIMUM SLOPE IN M ERIAL TO BE I ANY DIRECTION l L Q SP CIFIED BY OWNER Q Z_I NOT TO EXCEED 2 II I 3 I N A ( F6 P, EROSION CONTROLO 1 C) �' QI I o II I _ z � I o Q NC PARKING 18` 0" W l I I TC - 74.8 SIGN _:.._._.,... J W MINIMUM - ^4.62 t 'd Q- ��°? 0 5% TC- 274.2 - r' I I TC 75.18 LJ W �L. / i \ 274.70 p w W Lo o PLAYGROUND LO II 4� - ry LOT BE ( " "" C 2 5.13 I FL 272.8 7.5' BUILDING LINE I TRUCK -1" >- c I I-- - - - - -� WASHOUT I I ���?) f� AREA I I 6 Lu W E DETA I )� / y-' IIIIIIIIIIiIIIIlnili����elllllllllil' �.� TC\ 274.43 2> Oo o � 273.g4'fl"A (.� 2 ,_. �. .... "•......._...,.._.. ,..................• ,.......�..••......._.. 274.05 • V:.YY� 274.21 3.q NG 273.0 ry^ry' I Tc 27 rc 2 PROPERfl'° LINE: 151.26' - S 45°22 6" E - II .73 I ( c>7 TC 273.45 273.44 +273.61 II 274.4q 273.80 I II EXISTING TREE 2-2'X10' RIP RAP AREAS MATERIAL TO BE SPECIFIED BY OWN 3.0' -FLUME FOR EROSION CONTROL DETAIL NG 2 FIRE N7DR INT TG 273.28 272.gq TC4 TOP = IRON ROD 274.0 TOP OB BERM CM 274'0 SPILLWAY 273.8 3,p'� SPILLWAY = SET OR FOUND t-1 273.7 =IRON ROD FOUND CAPPED - # 3 REBAR @ = FENCE CORNER 15" O.C.B.W. = RIGHT OF WAY F.L. ELEV. F.L. ELEV. 272.7 272.8 PUE = PUBLIC UTILITY EASMT. RIP RAP 10il ul DE = DRAINAGE EASEMENT 4" THICK SLAB 6„ PAE = PARKING/ACCESS EASMT. 2.6 2.6 = ELECTRIC METER PROFILE (( --CUT EXISTING CURB 51 FL AN REFERENCE: NONE SCALE:I"=10'-0" NORTH DETAIL4" THICK SLAB 3.0' #3 BARS @ 151, O.C.B.W. 31' (TYP.) 1.1651 ' a tRIP RAP 0.67' WEIR s AREA FOR EROSION o PROTECTION � 2.76' � � 2.76' ' PLAN TOP OF BERM EL=274.0 EL=273.8 4„ EL=24.0 1.0' 411 41 #3 REBAR DETENTION POND 4I' WEIR STRUCTURE DETAIL 067' -I 4 4° NOT TO SCALE EL=272. WEIR $ SPILLWAY X -SECTION FN BLOCK D 'SII ZONED C-1 NOW _OR FORMERLY _ - 226 S.W. PARKWAY ENTERPRISES EXISTING PARKING (EVERYTHING EXISTING EXCEPT FOR PROPOSED ADDITION DETAIL 2 0----wl-1.0' ' # 4 CONTINUOU BARS 4" G- 6 ° #3 18" O.C. L411 TIE BARS EXPANSION JOINTS AT 25' CONTRACTION JOINTS AT 15' FLUME NTS DETAIL 3 WEIR I 6' 1 6' 0 0 P. L. HEIR LOCATION NTS +275.87 EROSION CONTROL I. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SEDIMENTATION CONTROL DURING CONSTRUCTION AND SHALL TAKE THE NECESSARY STEPS TO MITIGATE THE AMOUNT OF SOIL AND DEBRIS ORIGINATED AT THE SITE AND CARRIED ONTO PUBLIC RIGHTS OF WAY, WATER COURSES AND ADJACENT PROPERTY. TO THIS EFFECT THE CONTRACTOR SHALL INSTALL A SILTING BARRIER ALONG THE LOWER ENDS OF THE LAND BEING DISTURBED AS SHOWN HERE AND ACCORDING TO THE DETAIL SHOWN ON THIS SHEET. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING A CONSTRUCTION ENTRTANCE, MINIMUM 50' LONG AND MINIMUM OF 12' WIDE CONSISTING OF ROCK -RUBBLE WITH PIECES 1-1/2" TO 3-1/2" IN DIAMETER, A MINIMUM OF 6" DEEP. SHOULD THE CONTRACTOR USE ANOTHER ENTRANCE HE SHALL BE REQUIRED TO INSTALL A CONSTRUCTION ENTRANCE AT EACH ADDITIONAL ENTRY POINT WHERE MUD IS TRACKED ONTO CITY STREETS. 3. ALL STORM DRAINAGE INLETS IN THE PROJECT AREA SHALL BE PROTECTED DURING CONSTRUCTION FROM RUNOFF SEDIMENTATION' BY A 6" HIGH BARRIER MADE UP OF 20 -LB HAY FILLED BURLAP BAGS (OR EQUIVALENT BARRIER). 4. ALL DISTURBED GROUND, INCLUDING DETENTION POND SHALL BE SODDED OR AT LEAST SEEDED AT THE CONCLUSION OF CONSTRUCTION TO REDUCE SILTING S. RIP -RAP SHALL BE 20 LB. PIECES, ROCK RUBBLE ON PLASTIC LINER. 111 LEGEND IR " = IRON ROD IP = IRON PIPE CM = CONCRETE MARKER MOC = MARK ON CONCRETE S/F = SET OR FOUND IRF, =IRON ROD FOUND CAPPED FC ( = FENCE CORNER ROW = RIGHT OF WAY BB = BACK TO BACK OF CURB BL = BUILDING LINE PUE = PUBLIC UTILITY EASMT. EE = ELECTRICAL EASEMENT DE = DRAINAGE EASEMENT AE = ACCESS EASEMENT PAE = PARKING/ACCESS EASMT. EM = ELECTRIC METER ET = ELECTRIC TRANSFORMER E/P iL = ELECTRICAL/POLE/LIGHT MH = MANHOLE CO = CLEAN OUT WN = WATER METER W/V = WATER/VALVE SS = SANITARY SEWER FH = FIRE HYDRANT GM = GAS METER T/B = TELEPHONE PEDESTAL G/TV GABLE TV AC = AIR CONDITIONER OH = OVERHANG EOP = EDGE OF PAVEMENT PE = PEDESTRIAN EASEMENT TC = TOP OF CURB NG = NATURAL GROUND BM = BENCHMARK ( R) = RECORDED ( M) = MEASURED SECTION A -A NTS DETAIL 4 T -POST DRIVEN ' 2- 1/2" REINF. BAR PER NAY SALE -,,,, HAY BALE--_ 1 SILT FENCING SEDIMENT CONTROL 7 FABRIC FLOW NTS 273.0' SYM80L L CND DRAWN: NOTES: ® WATER METER 444.71P SL B: 444.74, REVI Scny ! ! /b�nlr�00 -G- GAS LINE W (0 I. ALL CONSTRUCTION MATERIALS AND METHODS SHALL CON ORM WITH THE , IRRIGATION METER '-'s- SEWER LINE Fu STANDARDS AND SPECIFICATIONS OF THE CITY OF COLLEGE STATION. -E- ELECTRIC LINE c FIRE HYDRANT 2.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR O FIELD VERIFY THE IY EXACT DEPTH 4 LOCATION OF ALL EXISTING UNDERGROUND' UTILITIES PRIOR TO COMMENCING ANY WORK. ALL EXISTING UTILITY LOCATION ' SHOWN HERE ARE 1 W !- Z APPROXIMATE. THE CONTRACTOR SHALL PROTECT ALL UNDERGROUND UTILITIES W Z v AFFECTING THIS PROJECT. U K W Q 3.THE CONTRACTOR SHALL NOTIFY ALL UTILITIES AT LEAST' 2 DAYS PRIOR Q >-CL TO START T_ RT_ O F CONSTRUCTION: -- ( U Q WATER AND SEWER SERVICE: 764-3638 __----- 0- b z COLLEGE STATION ELECTRICAL SERVICES - 7641-3638 - w TXU GAS - 775-1624 0< VERIZON SOUTHWEST - 321-4303 N 30 CL X COX COMMUNICATIONS - 776-7766 Z 3 W DIG TESS - 1-800-344-3877 4. ALL LINEAR DIMENSIONS ARE IN FEET UNLESS OTHERWISE NOTED. 5. THIS PROPERTY DOES NOT LIE W ITN I N AN IDENTIFIED 100 -YEAR PLAIN ACCORDING FLOOD TO FEMA MAP # 48041C 0152C, DATED JULY 21 igg2. cv 6. BACKFILL MATERIAL SHALL BE COMPACTED TO A MINIMUM OF g0% OF MAXIMUM DENSITY AS DETERMINED BY ASTM D 6q8 IN OPEN AREAS AND 95% UNDER PAVEMENT AND STRUCTURES. 7. T14E CONTRACTOR SHALL MAINTAIN ACCURATE RECORDS F ANY CONSTRUCTION CHANGES IN ORDER TO PREPARE "AS -BUILT DRAW 1 NGS" WHICH SHALL BE SUBMITTED TO THE CITY WITHIN 30 DAYS OF COMPLETION OF CONSTRUCTION. 8. CONTRACTOR SHALL BE RESPONSIBLE TO SECURE GEOTE �T ICAL ENGINEERING SERVICES IF REQUIRED BY OWNER. 9 -THE CONTRACTOR SHALL COORDINATE ALL PROPOSED WO K AND PROCEDURES I T- \ WITH THE CITY OF COLLEGE STATION. 10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION E LAYOUT AND SURVEYING SERVICES. 11. DETENTION POND SHALL BE PRIVATELY MAINTAINED. 12. BERM SLOPES IN POND SHALL BE 3 TO 1. 13. THE CONTRACTOR TO PERFORM A ONE TIME CLEAN UP OF THE DRAINAGE EASEMENT THROUGH LOT q (OFF SITE) TO ALLOW STORM WATER RUN-OFF. SECTION A -A NTS DETAIL 4 T -POST DRIVEN ' 2- 1/2" REINF. BAR PER NAY SALE -,,,, HAY BALE--_ 1 SILT FENCING SEDIMENT CONTROL 7 FABRIC FLOW NTS 273.0' SYM80L L CND DRAWN: --w- WATER LINE ® WATER METER 444.71P SL B: 444.74, REVI Scny ! ! /b�nlr�00 -G- GAS LINE 0IM , IRRIGATION METER '-'s- SEWER LINE Fu -E- ELECTRIC LINE 1i,�,� FIRE HYDRANT -F- CHAIN LINK FENCE LINE p ELECTRIC METER LOT: 8D / 8E BLOCK: D SUBDIVISION: �vS ASHFORD S UAIZE COLLEGE SATION, TEXAS BRAZOS COUNTY M -M DESIGN IS NOT AN ENGINEERING FIRM NOR AN ARCHITECTURAL FIRM. WE ARE NOT QUALIFIED NOR ARE WE LICENSED TO DESIGN STRUCTURAL FRAMING OR FOUNDATIONS. ! A LICENSED PROFESSIONAL ENGINEER SHOULD BE CONSULTED REGAR ING STRUCTURAL FRAMING AND FOUNDATION. SHOULD A ENGINEER'S SEAL BE PRESENT ON THE DRAWING, THEN THE "ENGINEER OF RECOIj D" SHALL BEAR THE SOLE RESPONSIBILITY FOR THE STRUCTURAL DESIGN. M -M DESIGN WILL NOT BE HELD RESPONSIBLE FOR THE STRUCTURAL DESIGN AND/OR ANY PROBLEMS THAT MAY ARISE REGARDING THE DESIGN. DATE: 29APRILI I PROJECT: MN -II -133 DRAWN: CGS CHECKE HE ED: 444.71P SL B: 444.74, REVI Scny ! ! /b�nlr�00 07 /03 06/20/03 2gAUG03 SHEET NUMBER I.P2 11 As SHEET 02 OF 02 Google maps Get directions My Places 4 246 Southwest Parkway E College Station, TX 77840 Note: A denotes Golden Keys Learning Center Doc Bic Vol Ps 01095642 OR 10241 280 • Area outlined by red box includes a portion of the parking spaces owned by Brazos Fellowship that will be used by Golden Keys Learning Center. Go! sle maps Get directions Poly Places An 246 Southwest Parkway E College Station, TX 77840 Note: A • denotes Golden Keys Learning Center • Area outlined by red box includes a portion of the parking spaces owned by Brazos Fellowship that will be used by Golden Keys Learning Center.