Loading...
HomeMy WebLinkAboutDrawingsr K UPJ UJN CC J �, UJ\J J M UL JJ U J E I .INLET- BOX I I CURB T 1 CONSTRUCTION: OWNER AND 1) CONTRACTOR IS RESPONSIBLE TO REPORT ANY CONFLICTS BETWEEN PLAN AND ACTUAL CONDITIONS PRIOR TO ENGINEER SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF INFORMATION. OR DATA RELIED ON TO DEPICT- — - — — -J V N THIN THE PROJECT AREA AND NOTIFY UNDERGROUND FACILITIES CONTRACTOR IS TO CONTACT OWNERS OF ALL UTILITIES AND SERVICE LINES WI E ' BAG I5 To HAVE n 4 —6 OF INTENT AT LEAST t WEEK PRIOR TO CONSTRUCTION. CONTRACTOR T N. TR CTOR IS RESPONSIBLE: FOR COORDINATING. WITH FACILITY OWNERS. CONTRACTOR TIGHT CURB CONTACT m :5 c F A PIPELINES.ISTINt� UTILITIES, AND SERVICE LINES WIThiN THE- PROJECT O O IS TO VERIFY THE EXACT LOCA(]ON AND VERTICAL POSITIONING 0 LLEX :; >",: WITH NO GAPS z O U T T R O AREA WHETHER SHOWN ON THE PLANS OR NOT, A, LEAST 48 HOURS PRIOR TO CONSTRUCTION. CONTRACTOR IS TO MAINTAIN .3 V" U AL INTEGRITY OF ALL PIPELINES, ELECTRIC TRANSMISSION POLES. AND LINES, PERMANENT AND TEMPORARY UTILITIES. CONTRACTOR IS RESPONSIBLE ,PLACE GRAVEL FILTER BAGS SUCH THAT NO FOR ANY DAMAGE DONE TO EXISTING UTILITY FACILITIES, PAVEMENT, ETC. AS A RESULT OF CLEARING/DIRTWORK ACTIVITIES. GAPS ARE EVIDENT" STREET --__// 2 CONTRACTOR TO CONTACT'DIG-TESS ® 800-344-8371 14 DAYS PRIOR TO CONSTRUCTION. SPECIFIC ATTENTION SHOULD BE PAID TO S r SHOULD A CONFLICT ARISE BETWEEN THE PROPOSED CONSTRUCTION AND AN EXISTING UTILITY, NOTES - CONTACT UTILITIES, VERIZON, ATMOS, ETC. H CONTACT KLING ENGINEERING 48 HOURS PRIOR TO CONSTRUCTION. 1. GRAVEL.FOR.'FiLTER BAGS TO BE 3/4' GRAVEL y GS OR SYNTHETIC NET >, 3 CONTRACTOR IS TO MAINTAIN EROSION &SEDIMENT CONTROL- THROUGHOUT DURATION OF THE :PROJECT: OWNER. IS TO - 2: FILTER aAGs TO 8E PERvIOus BURLAP ea .° ) POR D DOWNSTREAM BAGS (1/8- MESH) APPROX. 24 -'LONG, -12` WIDE AND 6" HIGH. 3 MAINTAIN CONTROL POST PROJECT AND UNTIL` VEGETATION IS ESTABLISHED: INSURE SEDIMENT IS NOT TRANS TE o F WATER IMPERMEABLE BAGS OR OTHER APPROVED SEDIMENT CONTROL FROM PROJECT VIA SILT FENCE, GRAVEL FILLED a. MAINTAIN .FROM INSTALLATION OF INET/DRIVEWAY THROUGH EACH ° INSTALLATIONS. IF EXCESSIVE SEDIMENT TRANSPORT IS OBSERVED IN THE FIELD, ADDITIONAL CONTROLS SHALL BE INSTALLED. STAGE OF ROADBED CONSTRUCTION (SUBGRADE. BASE, HMAC) UNTIL ca ■® • SUBSTANTIAL COMPLETION OF PROJECT. Gr�4iye� > N R _ LNG OCCURS .� I PRIVATE, ..i OR 'STATE ROADWAYS: IF TRACK OCC 4 CONTRACTOR TO INSURE NO MUD IS TRACKED ON TO EXISTING P N TE, TY 4. CLEAN SEDIMENT AccuMUI:ATION As REQUIRED ALLOWING No MORE *.2100� � CONTRACTOR IS TO INSURE THAT MUD IS NOT ALLOWED TO REMAIN BEYOND THE END 0F EACH WORK D AY. 'CONTRACTOR SHALL THAN 3" OF SEDIMENT BUILD=UP AROUND BAGS. 3 NOT ALLOW MUD OR SEDIMENT TO ENTER THE EXISTING STORM SEWER SYSTEM AND IS RESPONSIBLE FOR CLEANUP SHOULD vivo y MAP O.� U) 0 t, SUCH OCCUR.t�OT GRAVEL FILTER BAG zo SCALEui z z d.. o ,; Nar ro scALE 0 5 SEDIMENT IS TO BE CLEANED FROM GRAVEL FILLED :BAGS OR OTHER SEDIMENT CONTROL DEV CE S WHEN: DEPTH OF SEDIMENT i Q N co r r- d w A INSURE EROSION CONTROL DEVICES ARE CONSISTENTLY INSTALLED REACHES 1 2 TOTAL HEIGHT OF -DEVICE. CONTRACTOR IS TO 4 —6 OF INTENT AT LEAST t WEEK PRIOR TO CONSTRUCTION. CONTRACTOR T N. TR CTOR IS RESPONSIBLE: FOR COORDINATING. WITH FACILITY OWNERS. CONTRACTOR TIGHT CURB CONTACT m :5 c F A PIPELINES.ISTINt� UTILITIES, AND SERVICE LINES WIThiN THE- PROJECT O O IS TO VERIFY THE EXACT LOCA(]ON AND VERTICAL POSITIONING 0 LLEX :; >",: WITH NO GAPS z O U T T R O AREA WHETHER SHOWN ON THE PLANS OR NOT, A, LEAST 48 HOURS PRIOR TO CONSTRUCTION. CONTRACTOR IS TO MAINTAIN .3 V" U AL INTEGRITY OF ALL PIPELINES, ELECTRIC TRANSMISSION POLES. AND LINES, PERMANENT AND TEMPORARY UTILITIES. CONTRACTOR IS RESPONSIBLE ,PLACE GRAVEL FILTER BAGS SUCH THAT NO FOR ANY DAMAGE DONE TO EXISTING UTILITY FACILITIES, PAVEMENT, ETC. AS A RESULT OF CLEARING/DIRTWORK ACTIVITIES. GAPS ARE EVIDENT" STREET --__// 2 CONTRACTOR TO CONTACT'DIG-TESS ® 800-344-8371 14 DAYS PRIOR TO CONSTRUCTION. SPECIFIC ATTENTION SHOULD BE PAID TO S r SHOULD A CONFLICT ARISE BETWEEN THE PROPOSED CONSTRUCTION AND AN EXISTING UTILITY, NOTES - CONTACT UTILITIES, VERIZON, ATMOS, ETC. H CONTACT KLING ENGINEERING 48 HOURS PRIOR TO CONSTRUCTION. 1. GRAVEL.FOR.'FiLTER BAGS TO BE 3/4' GRAVEL y GS OR SYNTHETIC NET >, 3 CONTRACTOR IS TO MAINTAIN EROSION &SEDIMENT CONTROL- THROUGHOUT DURATION OF THE :PROJECT: OWNER. IS TO - 2: FILTER aAGs TO 8E PERvIOus BURLAP ea .° ) POR D DOWNSTREAM BAGS (1/8- MESH) APPROX. 24 -'LONG, -12` WIDE AND 6" HIGH. 3 MAINTAIN CONTROL POST PROJECT AND UNTIL` VEGETATION IS ESTABLISHED: INSURE SEDIMENT IS NOT TRANS TE o F WATER IMPERMEABLE BAGS OR OTHER APPROVED SEDIMENT CONTROL FROM PROJECT VIA SILT FENCE, GRAVEL FILLED a. MAINTAIN .FROM INSTALLATION OF INET/DRIVEWAY THROUGH EACH ° INSTALLATIONS. IF EXCESSIVE SEDIMENT TRANSPORT IS OBSERVED IN THE FIELD, ADDITIONAL CONTROLS SHALL BE INSTALLED. STAGE OF ROADBED CONSTRUCTION (SUBGRADE. BASE, HMAC) UNTIL ca ■® • SUBSTANTIAL COMPLETION OF PROJECT. > > R _ LNG OCCURS .� I PRIVATE, ..i OR 'STATE ROADWAYS: IF TRACK OCC 4 CONTRACTOR TO INSURE NO MUD IS TRACKED ON TO EXISTING P N TE, TY 4. CLEAN SEDIMENT AccuMUI:ATION As REQUIRED ALLOWING No MORE � CONTRACTOR IS TO INSURE THAT MUD IS NOT ALLOWED TO REMAIN BEYOND THE END 0F EACH WORK D AY. 'CONTRACTOR SHALL THAN 3" OF SEDIMENT BUILD=UP AROUND BAGS. 3 NOT ALLOW MUD OR SEDIMENT TO ENTER THE EXISTING STORM SEWER SYSTEM AND IS RESPONSIBLE FOR CLEANUP SHOULD vivo y MAP O.� t, SUCH OCCUR.t�OT GRAVEL FILTER BAG zo SCALEui d.. o ,; Nar ro scALE 0 5 SEDIMENT IS TO BE CLEANED FROM GRAVEL FILLED :BAGS OR OTHER SEDIMENT CONTROL DEV CE S WHEN: DEPTH OF SEDIMENT i Q N co r r- A INSURE EROSION CONTROL DEVICES ARE CONSISTENTLY INSTALLED REACHES 1 2 TOTAL HEIGHT OF -DEVICE. CONTRACTOR IS TO SCALE. rn c AND PROPERLY MAINTAINED, .GRAVEL. FILTER BAGS STACKED AT LEAST TWO 1 'JQ a LAYERS. HIGH` SUCH THAT NO GAPS ARE EVIDENT .41FTWFFN TNI-- RR(141Nt]� (1R A111A[:FNTAAGS .i I�.I-R n(?'L1 )A/%I RY• EDGEF: CONC _ . . F S D FLDW3. N zee. _ ROP _ F STEP _ _ �.. . , B.. _. . av " acv __ a �e. , ..,. _. Roy -:..Top.. o E . SIDEWALK . til _ _ 0 :. r ROP__ ,.� 905- WNTOUkS 1 _._ _ E�IST�IrIG .� LEVATIQNS_ - rr ,- , .. ..8 REMOVED'• TO E ; . . sri.. . _ �% R E ,flR1.E C�7NC.. ET _... _ .:. :. o; VERTED GQN , ISLE. O.C.B. #4 BARS_ 18 0.0 b Fw, D H CLEAR -,Yl T TOO t/8", .RAD.: AL( NG. 0 S: ALL -EDGE KG 2,5" tP (DRk): .3' (DRIVE) 7 7 �j 4- 4 NOTE - 6". COMPACTED. SUBG E,,, 61 E STABILIZED SUBGRADE 7Y I " '' P CAL CW Nt�,'.Ab 1V J, q NOTES, 1. c6kiiEii TO:"k' S�N4 PO 4000 PSI 4" 28 T 1� RTLAND CFMMT,.CONCREM -T -.OF CONCRETE: PLACEP� or 3 PER BE. AKEN, 1: PER 50 CY, 2. TEST MINDERS _.POUR - 3.� ALL TRAFFIC, �,S­T DED.FROMPAVEME . W� I BY MEANS OF BARRIWES: - CONTRAMOU AND,.,SlGf4S UNTIL CONCRETE,ASAT . LEAST 1 pq"LD- -STANDARD No TO m 4t SUWRADEAND LIME, SiA8. DASE'� TO BE CO PA= O MIN., 95% PROC,l. (ASTM, D 698); R ORCE 0 CRETE;: PAVEM CKN -NOT', T,L SQBLE-, J DINT SEALER E 0 'JOINT' ING; AS -PER N� .RQ MATER} ATE AS, SPE ET 'PICAC]".'EXPANSION -:'j( INT -r, "@' T'ALL CONCR STR CTURE a. UR 'SHA 1. ALL PAVEMENT.S FACES LCBE.BROOM FINISHED PERPENDicuLAR -To PEDESTRIAN: TRAFFIC,;fLOW, 1 2- mc�A�Nslow J6Nr 1/8 LED ' RAD. ALL Ex AP BE 0 ,GAP.. -INSIDE; DiA� �lp SMOOTH "BAR D, WEL:, 1/2- Tn i p_ 8 oo'WEL'� TO:, BE 'OlLff GR' AWbIX4 IF boweL; w -4 EV"ION CAP, SD�' �N .�40­,SAE -,.GRADE- -ENGTHOF­DOW L_�' DtF%'Ri RCED CONCRETE FiT DOWEL A IES PER: PLAN — VAR PER JOINT DTL 'CURBAS PER: -16� ',zEXPANSI N. JOINT- FILLER E#�f64, J E' SEALTIGHT�� �H SOEC' OR SOF44SEAL 440T AP LIEG'SEALANT_ MFD.' -WR. �MEADO BY, CURB de:GUTfEii 3 WO.C.6.W. suet MOTES_ _'SIDEWALK�-4- AT I,11 _E U JZE�:#3��DOW Ls AT, ALL. PAVEMENT EXIST, ol!r ONTUSE EXPANSIQN�,A T,l -Es,,( NTERFAC 7w CONCRETE SIDIEWAX JOJN, k�ION NOT, TO SCALE _N9T:T0:SCALE M TO ".SCAM . . TEN[? PEN PAVEMENT_ RKING LOT' 12 V�RIE ER, SLOPE P .:GATE 2- .3 5 P I r. 2 4 '31 1OW REIN F_ GONG 44 6' TAL -MI I' WALL� .'_ -0 :4� I SMOOT.H:EX flOWE 8'z PAWSIOW, 0 W/ DAFS,�.OR `ETES FS XTERIO :b NOTE' -EXPANSION jofWrs IN 'tURB &' CUTTER S I' 'BE -- n- 'HAI IS ANC5 R T,'A MAXIMUWb t 'OF �50 A A T,. 'AND AT ALL RADIUS POINTS,. ��P.T., A NLI_ t,� PE SLOPE.�GU, E '-P R%'GRADING.4� R _ 1 i 1 : ; Nib Vvy tx , I - 1 , z ----------------- 1Z6AR 77, 2