HomeMy WebLinkAboutDrawingsIA►eL--f 1=11oxiatinn
W ■ vv� .�■.. �.-- -
SCALE: 1/8" = 1'-0"
South Elevation
C
Sc
1'-0"
North Elevation
SCALE: 1/8" = 1'-0"
BRICK
//-n or
L)"'0
CAST STONE
280 SF
19%
STUCCO
314 SF
21%
GLASS
116 SF
8%
DOOR
27 SF
2%
PS -1
FB -1
AR -2
AR -1
Awlys
AR -3
MC -1
EXTERIOR MATERIALS SCHEDULE
50%
PROJECT # 09-521.A
280 SF
Code Material
Manufacturer
Descri tion
Color
Remarks
116 SF
8%
REQUIRED BY CODE.
EXTERIOR & VENEER 23 5/8" X 7
PECAN
ENTRY AND WAINSCOT
APS-1
R-1
• AR
-1
STONE
ARRISCRAFT
5/8" X 3 5/8" SMOOTH FACED
3 VITH ARCRITE
T.
IES
G. ALL REVEALS, EXPANSION JOINTS, & MIS
INTERIOR DESIGN
EDI
EP -2
ADJACENT MATERIAL COLOR, U.N.O.
EXTERIOR & VENEER 23 5/8" X 3
PECAN
ENTRY AND WAINSCOT
AR -2 MC -1
2'-4„ 2425 WEST LOOP SOUTH
AR -2
STONE
ARRISCRAFT
-5/8" X 3 5/8" SMOOTH FACED
--
r 0.STONE SUITE 665
EXTERIOR & VENEER 23 5/8" X 7
PECAN
ENTRY PARAPET CAP
®
AR -3
STONE
ARRISCRAFT
5/8" X 3 5/8" SMOOTH FACED
FAX 713-552-9810
- 11
-
713-552-0707
TI A
SQ
FOOTAGE- MB CANOPY WWW.MGARCHITECTS.COM
PROVIDE 3' X3' SAMPLE IN FIELD.
BI
ICK
270 SF 68%
INTEGRALLY COLORED CONCRETE
DARK GRAY #C-34
ACCESSIBLE RAMPS
NE
14 SF 4%
CC -1 COLORED
CONCRETE
LM SCOFIELD
WITH SEALER
RE: A-101 AND A-102
CONSULTANTS
2. SIGNAGE, PROVIDE JUNCTION BOX FOR ELE
RICAL SI
WS -1
lEHP-1 1
WITH SIGN COMPANY.
CS -1 CAST
STONE
STRUCTURAL ENGINEER:
EXTERIOR & VENEER
TO MATCH AR -1
ENTRY COLUMNS
SITEWORKS
I �
JJJ
❑
M/E/P/ ENGINEER:
6. SUNSHADE, RE: B3/A-515
Henderson Engineers
7. DECORATIVE CAN6PY'� —A2/A-515
2250LR - 7 1/4" X 2 1/4"WITH
CLEAR ANODIZED
AT ENTRY ONLY
_
8. ARCHITECTURAL ALUMINUM GRILLE 1'-4" H X
" 0" W, PA
FBA AR -2
'
CW -1
CURTAIN WALL
KAWNEER
REQUIRED REINFORCING
ALUMINUM
10. 8" PIN MOUNTED ALUMINUM LETTERS BYi.
06/12/09
'DE
11. RECESSED BRICK DETAIL, TYPICAL AT EACH
'ILASTER
FB -1
EP -1
EXTERIOR PAINT
SHERWIN WILLIAMS
SEE COATING SCHEDULE
TBS- TO MATCH
BRICK
EXTERIOR H.M. DOOR
13. PLASTER CONTROL JOINTS EQUALLY SPAC
00 O ,
0
W0
0000,
FP -2
EXTERIOR PAINT
SHERWIN WILLIAMS
SEE COATING SCHEDULE
SW7025 BACKDROP
BOLLARDS, PIPE RAIL
oM
°
o° V
EP -3
EXTERIOR PAINT
SHERWIN WILLIAMS
SEE COATING SCHEDULE
TO MATCH AR -1
FLASHING
i
EXTERIOR HIGH
SHERWIN WILLIAMS
SEE HIGH PERFORMANCE
TO MATCH MR 1
CANOPY GALVANIZED STEEL,
PAINTED
CS -1 GL -3 GLA SF -1
EHP-1
PERFORMANCE PAINT
SYSTEMS SCHEDULE
VERTICAL SQ. FOOTAGE
EHP 2
EXTERIOR HIGH
PERFORMANCE PAINT
SHERWIN WILLIAMS
SEE HIGH PERFORMANCE
SYSTEMS SCHEDULE
BRICK 348 SF 27%
CAST STONE 392 SF 31 %
BRICK
MODULAR
OCEAN SANDS
FIELD BRICK, NOTE 3
TT CLAY
GLASS 451 SF 36%
•
FB -1
FACE
PRODUCTS
STUCCO 79 SF 6% -
PPG
1" INSULATED TINTED LOW E
SOLARBAN Z50 Gray
NOTE 1 RE: SHEET A-603
GL -1
GLASS
SCUPPER
1" INSULATED SPANDREL
MATCH SOLARBAN
FRITTED PANEL #3 SURFACE
SPANDREL GLASS
PPG
Z50 Gray
PS -1 8
�EL-13
SGS SOLOMON GRIND
SEE PROJECT MANUAL
OLOR TBS
COLOR-
NOTE 3 HAND TQOLED JOI NT
..............
MORTAR
EHP-1
MC -1
MC 1
METAL COPING
UNA-CLAD
SHEET METAL COPING
TO MATCH AR 1
KYNAR 500
PS-1
12" CURVED PANEL,
PREWEATHERED
KYNAR 500, ENTRY CANOPY
•GALVALUME
MR -1
METAL ROOFING
BERRIDGE
FBA
SEE PROJECT MANUAL
PARAPET TRIM
PS -1
PLASTER
10'-4"
CLEAR ANODIZED
EHP-1
•
SF -1
STOREFRONT SYSTEM
KAW NEER
TRI FAB - II - 451
ALUMINUM
DONN ZXA
FLAT W HITE
INSTALL WITH HOLD DOWN CLIPS
SG -1
SOFFIT GRID
USG
- AR -2
2 X 2 GYPSUM LAY -IN PANEL W ITH
WHITE
MOTOR BANK SOFFITS IN SG1
SP -1
SOFFIT PANEL
USG
VINYL FACE,#3260
AR -1
LAP & GAP
AT ENTRY CANOPY
WS -1
WOOD SOFFIT
OR LAMINATED
WHERE REQUIRED
BY CODE. GLASS IN TO BE 1/4" CLEAR U.N.O.
NOTE 1: TEMPERED
FOOTAGE -BUILDING
- NOTE 2: NOT USED:
3: PROVIDE 2 MATERIAL SAMPLE MOCK UP PANELS OF BRICK OR STONE, CAST
STONE, AND EIFS FOR
FINAL APPROVAL BY OWNER
VERTICAL SQ
NOTE
MOCK UP SHALL DEMONSTRATE
DIFFERING SHADES OF MATERIALS.
AND ARCHITECT
BEFORE ORDERING MATERIALS.
EACH
BRICK 823 SF 77%
OF COLOR UNLESS
NOTED OR AGREED
TO OTHERWISE.
CAST STONE 141 SF 13%
GENERAL NOTE: PROVIDE
SAMPLE OF MATERIAL FOR VERIFICATION
STUCCO 75 SF 7%
GLASS 33 SF 3%
fact Flpvation
SCALE: 1/8"
VERTICAL SQ. FOOTAGE
BRICK
725 SF
50%
.CAST STONE
280 SF
20% -
STUCCO
314 SF
22%
GLASS
116 SF
8%
AR -2
AR -1
3
15'-11"
O. MB PARAPET
M.B. CanonFront Elevation
SCALE: 1/8" = 1'-0"
Ke Notes
A. COORDINATE WITH BANK EQUIPMENT SUPP
1,
IER(B.E.
)
ARCHITECTURE
RIOR MA
° CUM �'°�
LS SCHEDULE
C. PROVIDE SAFETY GLASS IN ENTRY DOOR
A D SIDE LI
10'-0° PLANNING
AND/OR LOCATIONS
REQUIRED BY CODE.
—___'�B.O.
M.B. SOFFIT 0
I L DEVIiES
MATCH ADJACENT MATERIALS.
-
IOR GR,
DE
YWOOD IN LIEU OF SHEATHING.
F. VERIFY BRICK CONTROL JOINT LOCATION
3 VITH ARCRITE
T.
IES
G. ALL REVEALS, EXPANSION JOINTS, & MIS
INTERIOR DESIGN
EDI
EP -2
ADJACENT MATERIAL COLOR, U.N.O.
EP -2
I
2'-4„ 2425 WEST LOOP SOUTH
--
r 0.STONE SUITE 665
HOUSTON TEXAS 77027
FAX 713-552-9810
713-552-0707
TI A
SQ
FOOTAGE- MB CANOPY WWW.MGARCHITECTS.COM
BI
ICK
270 SF 68%
CI
ST STC
NE
14 SF 4%
CCO
I
112 SF 28%
1. MECHANICAL SCREEN WALL, RE: A4/A-102
CONSULTANTS
2. SIGNAGE, PROVIDE JUNCTION BOX FOR ELE
RICAL SI
N. COORDINATE
WITH SIGN COMPANY.
3. RECESSED LANE LIGHTS. CENTER ABOVE LAN
STRUCTURAL ENGINEER:
SCA Consulting Engineers
4. BOLLARDS, PAINT EP -2
5. BANK EQUIPMENT, VERIFY OPENING REQUIRE
ENTS.
M/E/P/ ENGINEER:
6. SUNSHADE, RE: B3/A-515
Henderson Engineers
7. DECORATIVE CAN6PY'� —A2/A-515
_
8. ARCHITECTURAL ALUMINUM GRILLE 1'-4" H X
" 0" W, PA
TTO
MATCH BRICK.
9. BRICK CONTROL JOINT.
10. 8" PIN MOUNTED ALUMINUM LETTERS BYi.
06/12/09
'DE
11. RECESSED BRICK DETAIL, TYPICAL AT EACH
'ILASTER
FAC
12. WALL MOUNTED LIGHT FIXTURE, RE: MEP
� °°000000000
°
L °o
13. PLASTER CONTROL JOINTS EQUALLY SPAC
00 O ,
0
W0
0000,
o°®
0
oM
°
o° V
c —
T O°oo S I / 000°°° P
ATF°OF°���
i
M.B. CanonFront Elevation
SCALE: 1/8" = 1'-0"
Ke Notes
A. COORDINATE WITH BANK EQUIPMENT SUPP
1,
IER(B.E.
)
B. FOR COLORS AND FINISHES REFER TO EXT
RIOR MA
ERI
LS SCHEDULE
C. PROVIDE SAFETY GLASS IN ENTRY DOOR
A D SIDE LI
HT�,
AND/OR LOCATIONS
REQUIRED BY CODE.
D. PAINT WALL MOUNTED EXTERIOR ELECT
I L DEVIiES
MATCH ADJACENT MATERIALS.
E. AT SIGNAGE LOCATIONS PROVIDE 1/2" EX
IOR GR,
DE
YWOOD IN LIEU OF SHEATHING.
F. VERIFY BRICK CONTROL JOINT LOCATION
3 VITH ARCRITE
T.
IES
G. ALL REVEALS, EXPANSION JOINTS, & MIS
G LAN,=O
EDI
ARE TO BE PAINTED TO MATCH
ADJACENT MATERIAL COLOR, U.N.O.
I
College Station Bajking
Center
100 Manuel Dri e
College Station, TX 177840
i
. -General
06/12/09 BID AND PERMI
16-11" PRO
• /•
-• NO:
IrT.O. MB PARAPET
----------- -------- =- ---------_- -- _--- r
EP -2
EXTERIOR ELEVATIONS
2'-4"
'.O. STONE
PPrvve - a Cm�v,w�n1�
A
M
I.
I'
AFF
ABOVE FINISHED FLOOR
MH
MANHOLE
ACOUS
ACOUSTICAL
MFR
MANUFACTURE(ER)
AC
AIR CONDITIONING
MO
MASONRY OPENING
ALUM
ALUMINUM
MAX
MAXIMUM
ARCH
ARCHITECT
MED
MEDIUM
ASPH
ASPHAULT
MTL
METAL
CONTACT: JERRY FOX
MIN
MINIMUM
MIR
MIRROR
B
B.E.S.
BANK EQUIPMENT SUPPLIER
MISC
MISCELLANEOUS
BJ
BAR JOIST
MULL
MULLION
BLK
BLOCK
MUNT
MUNTIN
BLKG
BLOCKING
BD
BOARD
N
BW
BOTH WAYS
NO
NIGHT DEPOSIT
BLDG
BUILDING
NOM
NOMINAL
BU ROOF
BUILT-UP ROOFING
NIC
NOT IN CONTRACT
BR
BULLET RESISTANT
NTS
NOT TO SCALE
NO
NUMBER (#)
C
PHONE: (979) 731-8584
CAB
CABINET
O
CPT
CARPET
OC
ON CENTER
CI
CAST IRON
OPNG
OPENING
CLG
CEILING
OPH
OPPOSITE HAND
CTR
CENTER
OZ
OUNCE
CUR
CLEAR (ANCE)
OD
OUTSIDE DIAMETER / DIMENSION
CW
COLD WATER
OH
OVERHEAD
CONC
CONCRETE
SITE PLAN
S 02 FOI
CMU
CONCRETE MASONRY UNIT
p
MCCLEARY/GERMAN ASSOCIATES, INC.
CONST
CONSTRUCTION
PG
PAGE
CONT
CONTINUOUS OR CONTINUE
PNT
PAINT
CJ
CONTROL JOINT
PART
PARTITION
HOUSTON, TEXAS 77027-4207
PVMT
PAVEMENT
S 03 FRAMING
/
PER
D
A-100
SITE COORDINATION PLAN
S 01 GE
DIM
DIMENSION
%
PERCENT
DW
DISHWASHER
PC
PIECE
DSP
DISPOSAL
PLAS
PLASTER
DR
DOOR
P. LAM
PLASTIC LAMINATE
ON
DOWN
PLMB
PLUMBING
DS
DOWNSPOUT
PVC
POLYVINYLCHLORIDE
DWG
DRAWING
PPT
PRESSURE PRESERVATIVE TREATED
DF
DRINKING FOUNTAIN
PTDD
PAPER TOWEL DISPENSER & DISPOSAL
E
ROOF PLAN
R
EA
EACH
R
RADIUS
EL
ELEVATION
RE
REFERENCE
ELEV
ELEVATOR
REF
REFRIGERATOR
EQ
EQUAL
REINF
REINFORCE
EQUIP
EQUIPMENT
RA
RETURN AIR
EXH
EXHAUST
READ
REQUIRED
EJ
EXPANSION JOINT
RH
RIGHT HAND
EXT
EXTERIOR
RHR
RIGHT HAND REVERSE
E.I.F.S.
EXTERIOR INSULATING FINISH SYSTEM
ROW
RIGHT OF WAY
RD -
ROOF DRAIN _
E -111 EL
TRI6AL
LIGHTING PLAN
ROOFING
FRFG
A-513
MOTOR BANK SECTIONS
E -111 EL E
FIN
FINISH
RO
ROUGH OPENING
FFL
FINISHED FLOOR LINE
P Ill • PLO
BINIG
FEC
FIRE EXTINGUISHER CABINET
S
A-514
A-515
FHC
FIRE HOSE CABINET
S.G.
SAFETY GLASS
FR
FIRE RATED
SCHED
SCHEDULE
FLASH
FLASHING
SECT
SECTION
FL
FLOOR (ING) OR FLOW LINE
SS
SERVICE SINK
FD
FLOOR DRAIN
SHT
SHEET
FLOUR
FLOURESCENT
SIM
SIMILAR
FT
FOOT/ FEET
Sc
SOLID CORE
FTG
FOOTING
SPKR
SPEAKER
EMAIL: TCURNUTTE@SCAHOUSTON.COM
SPECS
SPECIFICATIONS
SQ
SQUARE
G
A-541
RESTROOM DETAILS
GA
GAGE,GAUGE
SF
SQUARE FEET
GC
GENERAL CONTRACTOR
STD
STANDARD
GL
GLASS, GLAZING
SST
STAINLESS STEEL
GB
GRAB BAR
ST
STEEL
GRBM
GRADEBEAM
STOR
STORAGE
GR
GRADE, GRADING
STIR
STRUCTURAL
GYP BD
GYPSUM BOARD
SUSP
SUSPENDED
H
T
PHONE: (713) 783-7707
HDW
HARDWARE
TEL
TELEPHONE
HTG
HEATING
TV
TELEVISION
HT
HEIGHT
TEMP
TEMPERED
HM
HOLLOW METAL
THK
THICK
HOR
HORIZONTAL
TK
THIMK
HB
HOSE BIBB
TPD
TOILET PAPER DISPENSER
HW
HOT WATER
TC
TOP OF CURB / CONCRETE
A-806
BANK EQUIPMENT
Ti
TOP OF JOIST
BANK EQUIPMENT:
TS
TOP OF SLAB
BANK EQUIPMENT
N
INCH (")
TOS
TOP OF STEEL
ID
INSIDE DIAMETER / DIMENSION
TYP
TYPICAL
INFO
INFORMATION
TO
TOWEL DISPENSER
INS
INSULATE
CONTACT: PAUL PEEK
U
UL
UNDERWRITERS LABORATORY
J
JAN
JANITOR'S CLOSET
U.N.O.
UNLESS NOTED OTHERWISE
JS
JANITOR'S SINK
JT
JOINT
V
JST
JOIST
VAR
VARIABLE(')
JB
JUNCTION BOX
VERT
VERTICAL
VOL
VOLUME
K
KPL
KICKPLATE
w
WSCT
WAINSCOT
WC
WATER CLOSET
L
LAM
LAMINATE
WH
WATER HEATER
LAV
LAVATORY
WP
WATERPROOFING
LH
LEFT HAND
WS
WATERSTOP / WEATHERSTRIP
LHR
LEFT HAND REVERSE
WT
WEIGHT
LT
LIGHT
WWM
WELDED WIRE MESH (FABRIC)
LWF
LIGHT WEIGHT FILL
W
WIDE
LR
LIVING ROOM
WW
WINDOW WALL
LVR
LOUVER
W/
WITH
LB
POUND
W/O
WITHOUT
WD
WOOD
HOUSTON, TEXAS
NOTES
A. PRIOR TO ANY DEMOLITION OR RENOVATION WORK, VERIFY FROM THE OWNER THATAN ENVIRONMENTAL ASSESSMENT/ASBESTOS SURVEY HAS SUMMARY OF THE WORK:
SYMBOLS USED AS ABBREVIATIONS BEEN COMPLETED AND THAT NOTIFICATION HAS BEEN GIVEN TO THE TEXAS DEPARTMENT OF HEALTH. IF HAZARDOUS WASTE WAS FOUND, VERIFY CONSTRUCTION OF A FREESTANDING BANK INCLUDING DRIVE THRU MOTOR BANK CANOPY.
THAT IT WAS PROPERLY ABATED ACCORDING TO THE SURVEY RECOMMENDATIONS. THE DEMOLITION/RENOVATION NOTIFICATION FORM MUST BE NEW CONSTRUCTION WILL INCLUDE INTERIOR FINISH OUT, PARTITIONS, CEILINGS,
@ AT FILED WITH THE T.D.H. TEN DAYS PRIOR TO ANY DEMOLITION WORK. ELECTRICALAND LIGHTING, SITE IMPROVEMENTS NEW UTILITY SERVICES ALSO
L ANGLE
C CENTERLINE -
I CHANNEL
0 DEGREES
' FEET OR MINUTES
" INCHES, SECONDS OR DITTO
# NUMBER OR POUNDS
/ PER
% PERCENT
P PLATE (OR PROPERTY LINE)
+ PLUS OR MINUS
0 ROUND, OR DIAMETER
LEGEND
OFFICE ROOM NAME & NUMBER:
100 SEE FINISH SCHEDULE
DOOR NUMBER:
SEE DOOR SCHEDULE
OWINDOW TYPE:
A SEE DETAILS
SPECIFIC KEY NOTE:
/ REFER TO SCHEDULE
REVISION NUMBER
CLOUDING FOR SOME
REVISIONS
Al LARGE SCALE DETAIL DRAWN
A-514 AS DETAILAI ON SHEETA17
A3 DETAIL DRAWN AS NO. A3
A-511 ON SHEET A-511
A4 BUILDING SECTION DRAWN AS
A-301 NO. A4 ON SHEET A-301
B2 EXTERNAL ELEVATION DRAWN AS
A-201 NO. B2 ON SHEET A-201
D3 INTERIOUR ELEVATION DRAWN
A-211 AS NO. D3 ON SHEET A-211
DESIGNATED FINISH
1 SEE FINISH
SCHEDULE
5
C COLUMN LINE
DESIGNATION
( DIMENSION TO
CENTER LINE
DIMENSION TO FACE OF EXISTING
CONSTRUCTION, FACE OF NEW
CONSTRUCTION, OR FOUNDATION
164, ELEVATION (ABOVE FINISHED
- FLOOR OR OTHER REFERENCE
PLANE)
LOCAT/ON MAP
A2 HOUSTON, TEXAS
COORDINATION AND FINAL HOOK-UP OF BANK SUPPLIED EQUIPMENT.
BUILDING STRUCTURE WILL BE CONCRETE SLAB ON GRADE, METAL STUD STRUCTURE WITH
MANUFACTURED WOOD TRUSSES, MINOR STEEL FRAMING, BRICK MASONRY, PLASTER AND
MODIFIED BITUMINOUS ROOF.
BANKING RELATED ITEMS IN THE GENERAL CONTRACT ARE:
BULLET RESISTANT WINDOW FRAME AND GLASS
LANE LIGHTS
RELATED WORK UNDER SEPARATE CONTRACTS:
A. BANK EQUIPMENT:
SAFE DEPOSIT BOXES
CASH SAFE
AUTOMATIC TELLER MACHINE
MOTOR BANKING EQUIPMENT AND PNEUMATIC TUBES
NIGHT DEPOSITORY AND CHEST
CASH PEDESTALS, CASH DISPENSERS
B. SECURITY SYSTEM DEVICES AND CABLING*
C. FURNITURE AND FURNISHINGS
D. EXTERIOR ELECTRIFIED BUILDING AND SITE SIGNAGE (ELEC BY CONTRACTOR)
E. LANDSCAPE AND IRRIGATION SYSTEM
F. APPLIANCES
TELEPHONE/DATA WORK UNDER SEPARATE CONTRACTS:
A. DATA SYSTEM DEVICES AND CABLING*
B. TELEPHONE SYSTEM DEVICES AND CABLING*
* NOTE: CONTRACTOR IS TO PROVIDE HOLE IN WALL WITH PULL STRINGS AT TELEPHONE/DATA
POINTS SHOWN ON DRAWINGS UNLESS CONDUITAND BOX REQUIREMENTS ARE NOTED.
COORDINATE EXACT LOCATION OF TELE/DATA POINTS WITH OWNER.
BUILDING CODE INFORMATION:
BUILDING CODE: INTERNATIONAL BUILDING CODE, 2006
INTERNATIONAL ENERGY CONSERVATION CODE, 2006
TEXAS ACCESSIBILITY STANDARDS
PLUMBING 2006
MECHANICAL 2006
FIRE 2006
NATIONAL ELECTRICAL CODE 2005
SITE AREA: 44,084 S.F. (1.01 AC)
BUILDING AREA: 2656 GROSS SF
OCCUPANT LOAD: 2656/100= 27 OCCUPANTS
PARKING SPACES: 20 FULL SIZE
2 ACCESSIBLE
22 TOTAL SPACES
OCCUPANCY GROUP: B (BUSINESS)
TYPE OF CONSTRUCTION: V -B
BUILDING HEIGHT: 1 STORY (26'-1" A.F.F.)
ALLOWABLE HEIGHT: 40'
ALLOWABLE AREA: 9,000 SF +AREA MODIFICATIONS
LEGAL DESCRIPTION:
LOT 1R, BILOCK 1, KFO SUBDIVISION AS RECORDED IN VOL. 3779, Pg. 88
`iI
A0 . 0"
X BUILDING PERMIT j
X B.R. WINDOW FRAME P 4D GLASS
X LANE LIGHTS
X MODULAR VAULT INSi L
X VAULT DOOR, AND PAN L BED P TE
X VAULT WALLS SHOE PL kTE
X VAULT DOOR GROUT
X NIGHT DEPOSIT STEEL URROU D
X CARPET PURCHASE
)( CARPET INSTALL
X INTERIOR SIGNAGE/ IRI OM SIG GEIS NOTED
X EXTERIOR ELECTRIFIE BUILDI SIGNAGE
FIRE SPRINKLER SYSTEM REQUIRED: YON
FIRE ALARM SYSTEM WITH AUDIO/VISN L DEVICE 3 RE UIRED:Y ON * SEE NOTE
II
* NOTE: A FIRE ALARM SYSTEM IS REQUIRED BY ODE • INT ESE SITUATIONS
1. HIGH RISE OFFICE BUILDING (75' OR MORE)
2. MULTIFAMILY RESIDENTIAL
3. WHEN BUILDING HAS A SPRINKLER SYSTEM / 108 H DS DR MORE
4. WHEN REQUESTED BY OWNER ALTHOUG T REQU I RED BY CODE
AUD/O/VISUAL DEVICES ARE REQUIRED WITPI IRE ALARM SYSTEM
SMOKE DETECTORS ARE REQUIRED BY CODE:
i
1. IN A/C MAIN SUPPLY DUCTS AND RETURN AI (OVER 2 00 C M) WITH A SHUT DOWN RELAY
IN CASE OF FIRE.
2. IN ALL ELEVATOR LANDINGS AND ELEVATOiR QUIPME T ROOMS
3. SMOKE & HEAT DETECTORS ARE REQUIRE D N ELEVATORSHAFT IF SHAFT IS SPRINKLERED.
A.D.A.A.G. & T.A.S. COMPLIANCE:
THIS BANK FACILITY HAS BEEN DESIGNED T COMPLY WITF TEXAS ACCESSIBILITY
STANDARDS (T.A.S.) OF THE ARCHITECTURAL BARRIER ACT, ARTICLE 9102, TEXAS
CIVIL STATUTES, EFFECTIVE APRIL 1, 1994. .S. IS BA ED ON THE AMERICANS WITH
DISABILITIES ACT ACCESSIBILITY GUIDELINE (A.b.A.A. .), /'ND ALL REQUIREMENTS
NECESSARY FOR COMPLYING WITH A.D. G. ARE It LUDED IN T.A.S. PLANS WILL
BE SUBMITTED FOR T.D.L.R. REVIEW AND ROYAL; D.L.T.. WILL MAKE AN ON-SITE
COMPLIANCE INSPECTION WITHIN ONE YEA OF THE GATE F SUBSTANTIAL COMPLETION.
(SUBMITTAL REQUIRED FOR PROJECTS OF RE THA $50000 CONSTRUCTION COST.)
A9813695
EABPRJ No.
IF TENANT SPACE, BASE BUILDING EABPRJ No
2003 INTERNATIONAL ENERGY CONSERVATION ODE CO
GMPLI INCE
THIS BUILDING BEEN DESIGNED TO CO LY WITH REQUIREMENTS SET FORTH IN THE
2000 INTERNATIONAL ENERGY CONSERVA K CODE (l CC).' CALCULATIONS HAVE BEEN
MADE IN THE FOLLOWING AREAS:
BUILDING ENVELOPE, INSULATION R-VALU WINDO AND DOOR AREAS, SOLAR HEAT
GAIN COEFFICIENTS, HEATING AND COO SYST �EFFII IENCY DUCT INSULATION,
AND ELECTRICAL LIGHTING LOADS.
4
PROJECT TEAM
M'r—ms ; A W, RIO
ARCHITECTURE
PLA NIS
e
INTERIOR DES Gil
2425 WEST LOOP SOUTF
SUITE 665
HOUSTON TEXAS 77027
FAX 713-552-9810
713-552-0707
WWW.MGARCHITECTS.COM
CONSULTANTS
STRUCTURAL ENGINEER:
SCA Consulting Engineers
M/E/P/ ENGINEER:
Henderson Engineers
06/12/09
A O0°0000000000
�� °c
W 0
0
(r o`
OA uvr7
°
>. 06000517\ 0°00° C*:)q 0000°°°°��P
ATF
OF _�
College Station Bank "ng
Center
100 Manuel Drive
College Station, TX 7t,84
ISSUE:
MARK DATE DESCRIPTION
06/12/09 BID AND PERMIT ISSUE
PROJECT NO:
09-521.A
GENERAL INFORMA Ti ON
o
1l'
/II
ARCHITECT CERTIFYING COMPLIANCE
ALTERNATES
I.
I'
OWNER:
THE BANK AND TRUST
1716 BRIARCREST DR., SUITE. 400
ALTERNATE
#1:1 PERFORMANCE
NND PAYAENT
BONDS.
BRYAN, TX 77802
(`
CONTACT: JERRY FOX
PHONE: (979) 777-2770
FAX: (979) 691-5474
KLUNKERT & ASSOCIATES, INC.
CONSTRUCTION PROGRAM
1722 BROADMOOR, SUITE 102
MANAGER:
BRYAN, TX 77802
CONTACT: MATT KLUNKERT
PHONE: (979) 731-8584
FAX: (979) 731-8579
COVER SHEET
EMAIL: KLUNKERTASSOCIATES@HOUSESERVICES.COM
G-001
GENERAL INFORMATION
S 101 :FOI
NDATION
PLAN
S 02 ROOF
FLAMING
& BRACING PLAN
COVER & LEGEND
S 01 FO
NDA
ION SECTIONS
ARCHITECT:
SITE PLAN
S 02 FOI
IONS
MCCLEARY/GERMAN ASSOCIATES, INC.
C-1
GRADING & DRAINAGE PLAN
S 01FRMING
SECTIONS
2425 WEST LOOP SOUTH, SUITE 665
S 502 FIR)I
MING
SECTIONS
HOUSTON, TEXAS 77027-4207
S 03 FRAMING
SECTIONS
BIDDING CONTACT: DAVE LEWIS
A-100
SITE COORDINATION PLAN
S 01 GE
ERA
SPECIFICATIONS
CONTACT: MARK FARRIOR
-
A101
SITE PLAN
S 02 GE
ERAS
SPECIFICATIONS
PHONE: (713) 552-0707
A-102
SITE DETAILS
S 03 ; GE
ERA
SPECIFICATIONS
FAX: (713) 552-9810
A-111
FLOOR PLAN
S 04 HA
DY FRAME
DETAILS
EMAIL: MFARRIOR@MGARCHITECTS.COM
A-121
RCP
A-131
ROOF PLAN
�M Ill MECHANICAL
PLAN
CIVIL ENGINEER:
MCCLURE AND BROWNE
A-141
FURNITURE PLAN
M 501 MECHANICAL
DETAILS
1008 WOODCREEK DR., SUITE 103
A-201
EXTERIOR ELEVATIONS
E 100 ELE
TRIEAL
SITE PLAN
BRYAN, TEXAS 77845
A-211
INTERIOR ELEVATIONS
E 01 ELEORICAL
PHOTOMETRIC SITE PLAN
CONTACT: JEFF ROBERTSON
A-311
BUILDING SECTIONS
E 501 ELE
TRICAL
LEGEND
PHONE: (979)-693-3838
A-511
WALL SECTIONS '.
E 502 ELTRI
, AL SCHEDULES & DETAILS
A-512
WALL SECTIONS
E -111 EL
TRI6AL
LIGHTING PLAN
A-513
MOTOR BANK SECTIONS
E -111 EL E
TRI6AL
POWER PLAN
STRUCTURAL ENGINEER:
SCA CONSULTING ENGINEERS
P Ill • PLO
BINIG
STORM PLAN
12511 EMILY COURT
A-514
A-515
MOTOR BANK SECTIONS
BUILDING DETAILS
P 12 PLU
BING
PLAN
SUGARLAND, TX 77478
A-531
MILLWORK DETAILS
P 01 PL
BINIG
DETAILS
CONTACT: TOM CURNUTTE
P 02 PLL
BING
RISERS &SCHEDULES
PHONE: (713) 779-7252
A-532
TELLERLINE DETAILS
FAX: (713) 779-1173
A-533
CHECKSTAND
EMAIL: TCURNUTTE@SCAHOUSTON.COM
A-534
DRIVE-THRU DETAILS
A-541
RESTROOM DETAILS
MEP ENGINEER:
HENDERSON ENGINEERS, INC.
A-601
PARTITION SCHEDULE
10370 RICHMOND AVE., SUITE 370
A-603
DOOR/WINDOW SCHEDULES
HOUSTON, TX 77042
A-701
FINISH PLAN
CONTACT: DAVID DARBY
A-801
ACCESSIBILITY GUIDELINES
PHONE: (713) 783-7707
A-802
ACCESSIBILITY GUIDELINES
FAX: (713) 783-7797
A-803
BANK EQUIPMENT
EMAIL: DAVID.DARBY@HEI-ENG.COM
A-804
BANK EQUIPMENT
A-805
BANK EQUIPMENT
A-806
BANK EQUIPMENT
BANK EQUIPMENT:
DIEBOLD INC.
A-807
BANK EQUIPMENT
9701 DESSAU RD. SUITE 104
A-808
BANK EQUIPMENT
AUSTIN, TX 78754
CONTACT: PAUL PEEK
PHONE: (512) 837-8547
FAX: (512) 837-2811
EMAIL: PEEKP@DIEBOLD.COM
PROJECT TEAM
M'r—ms ; A W, RIO
ARCHITECTURE
PLA NIS
e
INTERIOR DES Gil
2425 WEST LOOP SOUTF
SUITE 665
HOUSTON TEXAS 77027
FAX 713-552-9810
713-552-0707
WWW.MGARCHITECTS.COM
CONSULTANTS
STRUCTURAL ENGINEER:
SCA Consulting Engineers
M/E/P/ ENGINEER:
Henderson Engineers
06/12/09
A O0°0000000000
�� °c
W 0
0
(r o`
OA uvr7
°
>. 06000517\ 0°00° C*:)q 0000°°°°��P
ATF
OF _�
College Station Bank "ng
Center
100 Manuel Drive
College Station, TX 7t,84
ISSUE:
MARK DATE DESCRIPTION
06/12/09 BID AND PERMIT ISSUE
PROJECT NO:
09-521.A
GENERAL INFORMA Ti ON
o
1l'
/II