Loading...
HomeMy WebLinkAboutDrawingsI I NEW EXTERIOR STUCCO 1- _ E O appx + 36.9" AFF NEW ADDITION TOTAL HT. appx + 36-9" AFF =NEW DITION T TAL FIT. NEW EXTERIOR STUCCO NEW ALUMINUM ROLLING COUNTER DOOR - _ RA NEW METAL RDRAIL NEW METAL GUARDRAIL .. 42" HIGH BRICK WAINSCOT GU . appx + 30'-6" AFF NEW GUARD RAIL HT. appx 7 N HT pp Rp PAIL ' ' ' • •' •' + 30'-6"AFF W GUA I GLASS PANELS'-0SETBACK 11 42" HIGH BRICK WAINSCOT 2 0 F- PRELIM appx + 26'- 4"AFF NEW ROOFTOP FLOOR a xpp + 26'- 4' AFF = NE ROOFTO , FLO R 1 0 I�j� Cn % + 24'-8" aff =EXISTING ROOF LINE + 24'-8" aff =EXISTINGROQFLINE i � Z10 EXISTING FACAD EXPOSED STEEL STRUCTURE NEW EXTERIOR METAL STAIR 00 I 04-22-09 EXISTING FACADE + 13'-0" AFF = 2ND FLOOR + 1314 AFF 2ND, FLOOR .. o (ON oo W rri ry o �Cy% Q� J ^^11 w oz -f— o z z "WEST" „ i a HOOKAH STATION - WEST ELEVATION HOOKAH STATION - -NORTH ELEVATION o Uj SCALE: 3/16” = 1'-0" "FRONT"/COLLEGE MAIN SCALE: 3/16" = 1,_0" »LEFT" FAC NNGG SPIJ�k� STREET RIGHT OF WAY RI�HT Q w CD Q o o C*4 CD °0 c� o o X ,> o cn 0 NEW EXTERIOR STUCCO-+- EXTERIOR STUCCO -{- I _ O _ II ,Oi appx + 36-91 AFF - NEW ADDITION TOTAL HT. appx + 36 -9 AFF -. NEW ADDITION TOTAL HT. �C _{__. to CIO NEW EXTERIOR STUCCO 0 (D • "• ' • ,• w 42" HIGH N . . ,.•.. • • ...... • ' ' TO MATCH EXISTING BRICK - O NEW METAL GUARDRAIL 42" HIGH WAINSCOT II - TO MATCH EXISTING BRICK . 2-0 SETBACK----, • I + - " - :: • ' appx + 30'-6" AFF = NEW GUARD RAIL HT. appx 30 6 AFF NEW GUARD RAIL HT. PP PROJECT TITLE & DESCRIPTION 42" HIGH BRICK WAINSCOT NEW EXTERIOR METAL STAIR I ' appx + 26- " AFF = NEW ROOFTOP FLOOR appx + 26'- 4" AFF NEW ROOFTOP FLOOR O + 248" aff =EXISTING ROOF LINE +24'-8" aff = EXISTING ROOF LINE NEW EXTERIOR STUCCO - .. o EXPOSED STEEL STRUCTURE NEW EXTERIOR METAL 0 EXISTING FACADE0 co o EXISTING FACADE o I Z o ��O wm¢ 00�3 �Cn� 0�> o + 13I 11 CD -0 AFF - 2ND FLOOR + 13-0 AFF.= 2ND FLOOR I `— = o EEd EEd Eal Hsi Ell - 1 " NEW EXTERIOR METAL STAIR o _--- ---- LLQ 0 � o °D o O0 0 O I I I I I \ NI I 2 HOOKAH STATION "EAST" ELEVATION SCALE: 3/16" = 1'-0" "REAR" FACING LODGE ST. NON -RIGHT OF WAY HOOKAH STATION - "SOUTH" ELEVATION SCALE: 3/16" = 1'-0" "RIGHT" FACING UNIV DR. NON -RIGHT OF WAY i Horizontal Trim Window Sills & Hcaders Window Frames & Counter Doors Aluminum Mill Finish Brick - 42" Wainscot Acme Brick - Napa Valley I )O TOP ADDITION - HOOKAH STATION 06 COLLEGE MAIN, COLLEGE STATION, TX 77842 BO fETT SUB DIVISION, BLOCK 2, LOT 5 (PT OF) "HOOKAH STATION" 06 OLLEGE MAIN, COLLEGE STATION, TX 77842 Dr-1101TIAG TITLE ELEVATIONS. PROJECT NO. 209,03 Ii i DRAWING SHEET NUMBER I I i i SHEET OF i - NEW EXTERIOR STUCCO appx + 36'-9"AFF NEW ADDITION TOTAL HT. appx + 36'-9"AFF NEW DDITION I T. 0 NEW EXTERIOR STUCCO NEW ALUMINUM ROLLING COUNTER DOOR NEW METAL GUARDRAIL --- - 42 HIGH BRICK WAINSCOT NEW METAL D + :- n — n appx 30 6 AFF -NEW GUARD RAIL HT. a + •.... • • . • PP .. ppx 30-6 AFF W GUARD RAIL jiT. 42'HIGH BRICK WAINSCOT GLASS PANELS 2-0 SETBACK q1]INN �,I O [2:26'- 4°AFF =NEW ROOFTOP FLOOR a x + 26'• 4"AFF = NE ROOFT P FLOOR t + 248" aff =EXISTING ROOF LINE + 24'-8" aff I XISTING R OF LINE EXPOSED STEEL STRUCTURE NEW EXTERIOR METAL STAIR EXISTING FACAC 00 EXISTING FACADE �I + 13'-0"AFF = 2ND FLOOR + 131- "AFF 2N FLO R it OR it i HOOKAH STATION _ "WEST" ELEVATION HOOKAH STATI -ELEVATIONON NORTH SCALE: 3/16" = 1'-0" "FRONT/COLLEGE MAIN3SCALE: 3/16" = 1,-0" "LEFT" FAC NNGG SPIJ�g� STREET RIGHT OF WAY RI�HT NEW EXTERIOR STUCCO NEW EXTERIOR STUCCO appx + 36'-9" AFF = NEW ADDITION TOTAL HT. appx + 36'•9" AFF NEW ADDITION TOTAL HT. NEW EXTERIOR STUCCO •• "' � • ' • ' • ' • 42" HIGH WAINSCOT :..'. TO MATCHEXIS TING BRICK NEW METAL GUARDRAIL 42" HIGH WAINSCOT MATCH EXISTING ICK • TO MA G BR 2'-0"SETBACK ' .. • .... .. ..' • • . appx + 30'-6" AFF = NEW GUARD RAIL HT. : ' appx + 30'-6" AFF = NEW GUARD RAIL HT, 42"HIGH BRICK WAINSCOT .. . •• ' ' NEW EXTERIOR METAL STAIR appx + 26'- 4" AFF = NEW ROOFTOP FLOOR appx + 26'- 4" AFF = NEW ROOFTOP FLOOR + 248" aff = EXISTING ROOF LINE + 24'-8"aff =EXISTING ROOF LINE NEW EXTERIOR STUCCO EXPOSED STEEL STRUCTURE' - NEW EXTERIOR METAL STAT EXISTING FACADE - 0 EXISTING FACADE o 0 0 0 121-4 RA o •-_-_ + 131-011 AFF = 2ND FLOOR + 13' -()"AFF = 2ND FLOOR 0 o NEW EXTERIOR METAL STAIR o 0 0 0 O HOOKAH STATION - "EAST" ELEVATION A HOOKAH STATION - "SOUTH" ELEVATION SCALE: 3/16" = 1'-0" "REAR" FACING LODGE ST. SCALE: 3/16" = 1'-0" "RIGHT FACING UNIV DR. NON—RIGHT OF WAY NON—RIGHT OF WAY Horizontal Trim., Window Sills & Headers Window Frames & Counter Doors Aluminum Mill Finish Brick - 42" Wainscot Acme Brick - Napa Valley OFTOP ADDITION - HOORAH STATION 06 COLLEGE MAIN, COLLEGE STATION, TX 77842 BOYETT SUB DIVISION, BLOCK 2, LOT 5 (PT OF) "HOOKAH STATION" 06 OLLEGE MAIN, COLLEGE STATION, TX 77842 DRAWING TITLE BUILDING. E LEVATIONS NEW EXTERIOR STUCCO 000 42"HIGH BRICK WAINSCOT EXPOSED STEEL STRUCTURE 2 appx + 364" AFF = NEW ADDITION TOTAL HT. NEW ALUMINUM ROLLING COUNTER•••:= -ice --� --� NEW METAL GUARDRAIL appx ."AFF = NEW GUARDRAIL =� GLASS• .NELS : :�����:i��.�� :�..-��.��.�����i�..--u-w--------------ww_-------w-------w----w---w-w-w-----IPA ®u-:-w-u-i--i-u-u-.--�-uw---�-•°---°---------------------------------------------------.- .-o-uw-■.-'----'-��-'---•��-'■-�-� '-n---------------------------------------------------•-- -----•--------°----'-------•°---°--------------------------------------------------•.w —.--.-uw-■.- -----��-u--�.-�--i-- —.1 --------- ------- -------------- --------- ------------- u-.--�-•--i--i-u-a--.--i-u-'--�--°- --°---------------------------------------------------.- �-..-uw-.�-u---'--�-u_-n-�-wi-■ .-n----------------------------------------------------- - u-------------n----i----:-.-i-•°---°------------------------------------------------ ---.smw -.-'---■�-�---��-■.-�-_-■.-�--�-■ —.1------------M------------------------------- -------• —..—�.--■�----.,—.._�._—..—�.-�.. .—I. t---------------------------------------------------- app. +6-4 • ' - - -,--:---•--4------°-----•--'■'-��•O---r'---------------------------------------------------.w + 24'-8" aff = EXISTING ROOF LINE NEW EXTERIOR METAL STAIR EXISTING FACADE + 13'-0" AFF = 2ND FLOOR -NEW EXTERIOR STUCCO 42" HIGH BRICK WAINSCOT i I I appx + 36-9" AFF = NEW A DITION T NEW METAL GUA DRAIL appx + 30'•6" AFF = NE V GUARD S j 2'-0" SETBACK appx + 26'- 4„ AFF = NEV ROOFTOP. + 24'-8"aff =! 'STING ROC EXISTING FACADE +13'-0 F=2 i' • o oo 0 z " l S LU C> o ��Q Cr c; w too) 1LU i o c I z —�. Z i U z HOOKAH STATION _ "WEST" ELEVATION _ �, 0 HOOKAH STATION NORTH ELEVATION w SCALE: 3/16" = 1,_0" "FRONT"/COLLEGE MAIN SCALE: 3/16" = 1,_0" LEFT" FAC NG SPIJU� STREET cnRIGHT OF WAY RI�HTU Q dS04 00 Q o s` 4> C/7) C) O x NEW EXTERIOR STUCCO NEW 1 _ I . E _ _ , n appx + 361-91AFF NEW ADDITION TOTAL HT. appx + 36 -9 AFF -NEW ADDITION TOTAL HT. N OR STUCCO NEW EXTERIOR ' "' • • • • 42".HIGH WAINSCOT w •". • • " •. •:.. . • � ' •� • ' • ' ' • .• : •. ' . ' .. '• .. :. . .. ' . • RICK T M — • THE B _ NEW METAL GUARDRAIL 42 HIGH WAINSCOT 2'-0" SETBACK TO MATCH EXISTING BRICK U appx + 30'-6" AFF - NEW GUARD RAIL HT. . • appx + 30'-6" AFF - NEW GUARD RAIL HT. •-:�—,—s-�• , - • —r—�— • PROJECT TITLE &DESCRIPTION 42" HIGH BRICK WAINSCOT .. .. .. .. .. . •. . ' NEW EXTERIOR METAL STAIR a xpp + 26'- 4" AFF = NEW ROOFTOP FLOOR+ 24-8" aff EXISTING ROOF LINE appX + 26'.4"AFF =NEW ROOFTOP FLOOR o NEW EXTERIOR STUCCO + 241•8" aff EXISTING ROOF LINE , 0 1. >: EXPOSED STEEL STRUCTURE NEW EXTERIOR METAL STAII 0 _ � � N EXISTING FACADE �--- 0. F2 , z QCM CV � EXISTING FACADE 0'- Cn LU OFEz O D J CU 0 000�t� v``, _.�. Lij 0 E + 13'0 -0" AFF = 2ND FLOOR _ + 13'-0"AFF = 2ND FLOOR m o 0 Cn 00 NEW EXTERIOR METAL STAIR = o o m o 0 0 o o , 2HOOKAH STATION - "EAST" ELEVATION SCALE: 3/16" = 1'-0" "REAR" FACING LODGE ST. NON–RIGHT OF WAY HOOKAH STATION - "SOUTH" ELEVATION SCALE: 3/16" = 1'-0" "RIGHT" FACING UNIV DR. NON -RIGHT OF WAY MATERIAL COLOR SELECTIONS Roof Railing Horizontal Trim, Window Sills & Headers Black Fox SW 7020 ([TDO Color) ' � ` '4 " endow Frames & Counter Doors L S;•. Aluminum Mill Finish i Stucco i Brick - 42" Wainscot Senergy Finish System - 3108 Badger Acme Brick - Napa Valley PROJECT TITLE & DESCRIPTION PROJECT N0, 209.03 DRAWN BY: RS/AH CHECKED BYE AGH CONTRACT ISSUE DATE: o4-1 o-09 REVISIONS R 0�TOP ADDITION - HOOKAH STATION 0 6 COLLEGE MAIN, COLLEGE STATION, TX 77842 0 BOYETTSUB DIVISION, BLOCK 2, LOT 5 (PT OF) Q "HOOKAH STATION" 6 COLLEGE MAIN, COLLEGE STATION, TX 77842 0 DRAWING TITLE DRAWING SHEET NUMBER BUILDING ELEVATIONS SHEET OF 'I--� HOOKAH STATION SITE LOCATION SCALE: NTS v r NO WORK IS CURRENTLY PROPOSED ON THE EXISTING FIRST FLOOR.THE ELEVATOR IS PROPOSED AND IS CURRENTLY AN ALTERNATE OPTION FOR THE BUILDING OWNER. IF INSTALLED, THE ELEVATOR WORK WILL AFFECT THE FIRST FLOOR. RVVr 1 Vt" Dr%R MRCl1 18' NEW BIKE ,SACK--- COLUMBI A., CASCADE cYaoO;32»0-5 HOOKAH STATION - EXIST SECOND FLOOR HOOKAH STATION - NEW ROOFTOP SCALE: 1 /4 = 1'-0" 3_ SCALE: 1 /4" = 1'-0" HOOKAH STATION -EXST FIRST FLOOR SCALE: 1 /4" = V-0" DRAWING TITLE PROPOSED FLOOR PLANS. r l• U o Z � OI, rcc-�, 0 U rn � w _ O'o( Elfcy, O� t-- C)N f— LL = z .0 z z Q O n t� 0, 0 t,n Q Lu U W H U C ry T 0 O 0 0 x T o w 0) r-, (1) T 0 ;- U 0 Z Q Lr) N 00 Z C\ ti CV � V ~ Z ,. ^ �,J �J � W cM� O T W ... 0 Q ooco O ¢ vow > I— O 0 W e- � o LL O ui m o= m O PROJECT TITLE & DESCRIPTION PROJECT NO. 209.03 DRAWN BY: RS/AH CHECKED BY: ACTH CONTRACT ISSUE DATE: 04-10-09 REVISIONS 0 0 A 0 A ........._ DRAWING SHEET NUMBER Al--1 1 SHEET 1 OF ROOFTOP ADDITION HOOKAH STATION IN NORTHGATE DISTRICT COLLEGE STATION, TX Project Design Team 0 PRELIM. oC = 04-22-09 0� LL- CD 00 z cU Hawkins, Holster & Associates, Inc. P ARCHITECT 0 OWNER/APPLICANT 'cj 0 760.7 Eastmark Dr., Ste #200 College Station, TX 77840 Mark Sweidan QHookah Station Tel:979.693.3179 06 N 106 College Main College Station, TX 77845 N Tel: 979.574.8800 Y Gessner Engineering C)Co 01 o STRUCTURAL ENGINEER PROPERTY INFORMATION 2501 Ashford Drive Suite 102 Legal: Boyett Subdivision, Block 2, lot 5 (part of) College Station, TX 77842 PRELIMINARY 106 College Main Tel: 979.680.8840 Northgate District = NG-1 DRB- REVIEW Submittal Hawkins Holster & Associates, o ARCHITECTURE o PLANNING o INTERIOR DESIGN o 7607 Eastmark Drive, Suite # 200 O College Station, Texas 77840 PRELIMINARY NOT FOR CONSTRUCTION: /o 979.693.3179 SET NO------- \ I----------- Z I I I I I I I I I I I-I� I I ICI I I I I I 1 I O I I I I � ss• I I l l l I I I -H-I� _ i� �J `�`j :( BorErrsueomsloH.e�oacziarslaaurrGr:a� ,ea' p 1 - 4'W 1 w T oF- PRELIM. UP Sto. Cn k nW ROOFTOP I _ Z 10% 5 a Womens y Womens BAR AREA Z 0 04-22-09 s ° Mens Mens llo Sto. \ x Mech ,.j Egg . MENS RR 304 N o a�� y Bar 303 S ORAGE 1 HOOKAH STATION - SITE LOCATION a z 1 SCALE: NTS U O 4, N —_ Q ---- od S NO WORK IS CURRENTLY PROPOSED ON THE EXISTING D9 t}i9 h n FIRST FLOOR.THE ELEVATOR IS PROPOSED AND IS 0 CURRENTLY AN ALTERNATE OPTION FOR THE BUILDING OWNER. IF INSTALLED, THE ELEVATOR WORK WILL AFFECT O� THE FIRST FLOOR. THE SECOND FLOOR LS _ _ _ uj CURRENTLY SCHEDULED TO WOMENS RR REMODEL THE EXISTING 30Z O RESTROOM AND CORRIDOR TO PROVIDE AN SECONDARY w i� EXIT TO THE EXTERIOR STAIR- _ - -- FROM THIS FLOOR. THE T--' U ELEVATOR IS PROPOSED AND Bar IS CURRENTLY AN ALTERNATE OPTION FOR THE BUILDING OWNER. IF INSTALLED, THE UP ELEVATOR WORK WILL AFFECT Z THIS FLOOR FLOOR. LLO 1� O �N DOWN 0 H -�� = try NO /L T 6 EEO o 301 Q= S ROOFTOP BAR AREA O eRar�crNo 20903 a+nw}i BY: RS/AH ikELi®9Y• Ar.H C9NIRACTLSSUE0.4TE BC-10.0] �RSIONS UP �``%(( A NEW FIRE SPRINKLER SYSTEM SHALL BE INSTALLED IN Q ACCORDANCE WITH THE IBC 200E CODE WITH REGARD TO ANY STRUCTURETHAT IS THREE STORIES OR MORE A� B! DRAWINGTTTLE DRAWING SHEET NUMBER ................... � PROPOSED 2 HOOKAH STATION -EXST FIRST FLOOR HOOKAH STATION - EXIST SECOND FLOOR HOOKAH STATION - NEW ROOF TOP FLOOR PLANS A1,1 SCALE 1/4' = 1'-0' SCALE 1/4- = 1'-0' SCALE 1/4' = 1'-0- L. SHEET 1 OF 4THCH 4T NIGH NEW EXTERIOR STUCCO W4r. AFF • FEW AM=TOUL Rr. NEW ALUMINUM ROLLING COUNTER NEW METALGUARDRAIL �.9PdAFi=tra7Gl Wi0 "LLHT. GLASS PANELS m-W.AFF.IEf1'NOOFIOP_ F� +20da=E)=WF00FUlE TEXISTING FACADE +13-0'AFF=zonDea 1 HOOKAH STATION - "WEST" ELEVATION HOOKAH STATION -"NORTH" ELEVATION 1' SCALE: 3/16- = -0- 'FRON'r/OUEGE T OF MAIN WAY 3 SCALE 3/16' = l'-0' 'LEFT' F� � U &I� STREET NEWEXTERLORSIUCCO mw-3r0AFF-t03YAW MMrALRr NEW METAL GUARDRAB. T-0'SETBACK__\\� .W-WdAF-KWGW1RR-LHr. i—NEW EXTERIOR MEMI.STAIR q +� AFF. FlM� 7r',2,r13 u *',-YJ1':.- EXPOSED ME STRUCTURE .•----r—EXTSIWG FACADE -� +1"AFF-ORROOR — ,q¢+3gdlFF=rawAmmalmraxr. EXIMOR STUCCO 4T HGH BRICKWAINSCOT NEW METAL GUARDRAIL _ �pFc+3PdAFF.la3r/GlWd1RALM. 7-0 SMCK .xda=EFm�wGFinaFiaE NEW E7TIE60RSTUCCO p¢+23dAFF=NENADOIIIdI TOTALHT. NEWEXIERIORST CCO - 4THIGH WAINSCOT . TO MATCH EXISnNG BRICK 4T HIGH WAINSCOT TO MATCH EX6TNG BRICK .. 1{4,+J3dAtF•t�1'GIWiDBALHT. ,=+ eArF•ILwp00F'pr�_ +2eda=DasrlAFIOOFL07E 2HOOKAH STATION -"EAST" ELEVATION 4 HOOKAH STATION -"SOUTH" ELEVATION SCALE: 3/16' = l'-0' 'REAR' FACING LODGE ST. SCALE: 3/16- = V-0' 'RIGHT' FACING UNIV DR NON -RIGHT OF WAY NON -RIGHT OF WAY MATERIAL COLOR SELECTIONS Roof Railing Horizontal Trim, Vlrmdow Sills & Headers BIacY Fox SR' 7030 (LDO Colot) Window Frances & Counter Doors zll, ,'.a :, a Aluminum WIT Finish Siucco Brick -42" Wainscot ' Scri agy Finish SysRL'm - 3108 Budeer Acme Brick -Napa Valley +t3dAFF=TeFL00rt -NEW EXTERIOR METAL STAIR +13dAFF=X n= z O U o� PRELIM. cn F- Z 10% z 0 04-22-09 i ^off CU M E G p,PK Cn K P P (D FLL 1-- = z 2 •U O Q Cz S a) N h O a V! C� O w rn O _ C) PROJECThO 209.03 ORAWNITY: RSIAH BY' AQH txRRPAcrLssllEllATe aA.,Dm REVISIONS ROOFTOP ADDITION- HOOKAH STATION 0 106 COLLEGEMAIN, COLLEGESFATION.TX 77642 Q BOYEFTSUBDIVISION, BLOCK2,LOTS(PTOF) 'HOOKAH STATION' 106COLLEGE MAIN, COLLEGE STATION.TX 77942 DRAWING TITLE DRAWING SHEET NUMBER BUILDING A211 ELEVATIONS SHEET 1 OF 'I CHIGH NEW EXTERIOR NEW LXTEtBOR STUCCO qe s x' r AFF • NEW A11 BMM TOOL Hi. NEW ALUMINUM NEWMETALGUARDRAIL q --AF4=tEi'1GYAFtDR%Ht. ,p.28-1rAFF=9OFV__Z0_M .W4Pgz0M MROBFFL9E NEWEGER]] +ITVAFF-WROOH 1 HOOKAH STATION -"WEST" ELEVATION SCALE 3/16' = V-0' 'FRONT'/COLLEGE MAIN RIGHT OF WAY Vpj+W0AFF-TAWAW=TOfuHr. Z-VSEIBACK qp MrAFF_tEWMIARORMW. _NEVI EXIMOR METALSTAIR =, 25- ff1fEN'It wrTn00R i2P$dl=E7a571Ra WV LrE FACADE ♦1T V AFT=3ARDWt 3 HOOKAH STATION - "NORTH" ELEVATION SCALE: 3/16' = 1'-0' 'LEFT' 1pl6�� OFUWAY STREET JIT HIGH WAINSCOT TO MATCH DENG BRICK 2HOOKAH STATION -"EAST" ELEVATION 4 HOOKAH STATION -"SOUTH" ELEVATION SCALE: 3/16' = 1'—C 'REAR' FACING LODGE ST. SCALE: 3/16' = 1'—O' 'RIGHT' FACING UNIV DR. NON —RIGHT OF WAY NON —RIGHT OF WAY MATERIAL COLOR SELECTIONS lioofitailing Black Fox SIR' 7020 (LIDO Color) F Stucco Scacrgy Finish System - 3108 Badger .13WAFF-MADOR ,,--NEWEIMORSIUCCO s p.778Aff=tEWAWOlOItTM Ht. 42' HIGH WAINSCOT TO MATCH EXISTING BRICK Horizontal Trim, VAMdoW Sills & Headers window Frames & Counter Doors _Aluminum Mill Finish Brick -42" Wainscot ►s�> Acme Brick -Napa Valley M.* X-0'AFF • tEW (iUAD R Q HL im- 4AFF•lEWP40FjQ_P iX'/i .2parr=EgSIND INOFiRE J:NEW EXtER10R METAL STAIR EXISIING FACADE .170'AFF=30R�OR Z O o� PRELIM. �_z 10% z 0 04-22-09 a MM ri 5 i O .�O�M PRDJECTNO 209.m DRAWN BY: RSAH tNEdtH7 HN AGH CDNBiAJ;TLS5UED4TE Da,a.m REVISIONS ROOFTOP ADDITION- HOOKAH STATION A 1D5 COLLEGE MAIN, COLLEGE STATION,TX 77842 0 BOYETTSUB MISION, BLOCK 2, LOT 5 (PT OF) 'HOOKAH STATION' 106 COLLEGE MAIN, COLLEGE SFATION,TX 77842 DRAWING TITLE DRAWINGSHEETNUMBER BUILDING ELEVATIONS Mil SHEET 1 OF 1 HOOKAH STATION -SITE LOCATION L_) •v SCALE: NTS (� 0 4' N 4'A NO WORK IS CURRENTLY PROPOSED ON THE EXISTING Dok)ILN h o FIRST FLOOR.THE ELEVATOR IS PROPOSED AND IS LI 7- CURRENTLY AN ALTERNATE OPTION FOR THE BUILDING _ _I-- F OWNER. IF INSTALLED, THE ELEVATOR WORK WILL AFFECT THE FIRST FLOOR. THE SECOND FLOOR IS7le WOMENS RR _ _ _ _ to O O CURRENTLY SCHEDULED TO F - - - - REMODEL THE EXISTING 320 H RESTROOM AND CORRIDOR TO PROVIDE AN SECONDARY ---_ O EXIT TO THE EXTERIOR STAIR- _ _ _ _ FROM THIS FLOOR. THE ELEVATOR IS PROPOSED AND ' Bar IS CURRENTLY AN ALTERNATE OPTION FOR THE BUILDING OWNER. IF INSTALLED, THE UP z ELEVATOR WORK WILL AFFECT 0 THIS FLOOR FLOOR. DOWN co w _o o � $off Oh c' � o 301 _ ROOFTOP BAR AREA 0 F � � dmillY: RSIAH AC.H fbMRACTL5511EDATB O.:1003 REVISIONS A NEW FIRE SPRINKLER SYSTEM SHALL BE INSTALLED IN 0 UP - - - ACCORDANCE WITH THE IBC 2006 CODE WITH REGARD TO ANY STRUCTURE THAT IS THREE STORIES OR MORE 0 g 7 DRAWING TITLE DRAWING SHEET NUMBER PROPOSED 2 HOOKAH STATION -EXST FIRST FLOOR 3 HOOKAH STATION - EXIST SECOND FLOOR HOOKAH STATION - NEW ROOF TOP FLOOR PLANS Alml SCALE: 1/4" = 1'-0• SCALE: 1/4' = V-0' SCALE 1/4• = 1'-0• SHEET 1 OF r)ch CD ►-;0 m0-I • Ca p � _ o G G) -a r, m do m > (tG >m� 0 r) CD 700 -wm� V� mr)m 0 5 r31 00 0 o > d z ��,., z CD 00 -n 0 N'' r'J