Loading...
HomeMy WebLinkAboutDrawingsM 15" EASEMENT PROPOSED DETENTION POND ACTUAL AREA T.B.D. S45057" 15"E 400.00 0 I t 15' EASEMENT PROPOSED DETENTION POND ACTUAL AREA T.B.D. CQ' o0 A go CONCEPT PLAN R rt Stevenson Survey, A— 54 N. -E C.1 S.H. 40 & Barron Road Col ge Station, Texas for Tri—Star Realty Partners, Ltd. 93 Eldridge Rd. S�' uile 295 Suc ar Land, Texas 77479 Tele' I pl-one: (281) 240-1250 Faxr (281) 277-1001 Development Synopsis LAND AREA 3.67 AC) 159,864 S.F. Colhce p t Plan N 19 ULULMBER 2008 LA PROJECT NO. 28316.001 LENWSON m AWOSER ASSOCIATES, L. P. 1177 W. Loop South, Suite 900 Houston, Texas 77027 Tel 713.850.7660 Fax 713.850.8250 LO ARCHITECTURE PLANNING INTERIOR DESIGN Fl L.�E:: 28316-1 O.dwg Q 0 N- 5 ITE LIGHTING WILL COMPLY WITH I -ML -14" -ORDINANCE., T -I Ei UNITED ---D EV- LO r-" M r -71--I TOTAL SITE AREA 3.67 ACRES. P�A i -RUIIREMENTS SCAPINVERIF DSETBE NEED ICATION. * N OT IN 100 YEAR FLOOD PLAIN. THE BUFFER AREA _WILL BE AS EC'UIRED BY THE UDO WHEN IONMERCIAL IS DEVELOPING ADJACENT Tb 1SINGLE FAMILY (151 BUFFER AREA P'NEH MASONRY WALL). �ID WALKS WILL BE CONSTRUCTED LONG THE BARRON ROAD FRONTAGE WITH THE STREET WIDENING PROJECT OR AS PART OF THE SITE DEVELOPMENT. ® I . Imo, • w Iw I CIO I • I • ■ I • 58-A9 1550A wr �'A sa On �v 10 p 06 1212z►o� cl) ' o 0 I t 15' EASEMENT PROPOSED DETENTION POND ACTUAL AREA T.B.D. CQ' o0 A go CONCEPT PLAN R rt Stevenson Survey, A— 54 N. -E C.1 S.H. 40 & Barron Road Col ge Station, Texas for Tri—Star Realty Partners, Ltd. 93 Eldridge Rd. S�' uile 295 Suc ar Land, Texas 77479 Tele' I pl-one: (281) 240-1250 Faxr (281) 277-1001 Development Synopsis LAND AREA 3.67 AC) 159,864 S.F. Colhce p t Plan N 19 ULULMBER 2008 LA PROJECT NO. 28316.001 LENWSON m AWOSER ASSOCIATES, L. P. 1177 W. Loop South, Suite 900 Houston, Texas 77027 Tel 713.850.7660 Fax 713.850.8250 LO ARCHITECTURE PLANNING INTERIOR DESIGN Fl L.�E:: 28316-1 O.dwg Q 0 N- 5 ITE LIGHTING WILL COMPLY WITH I -ML -14" -ORDINANCE., T -I Ei UNITED ---D EV- LO r-" M r -71--I TOTAL SITE AREA 3.67 ACRES. P�A i -RUIIREMENTS SCAPINVERIF DSETBE NEED ICATION. * N OT IN 100 YEAR FLOOD PLAIN. THE BUFFER AREA _WILL BE AS EC'UIRED BY THE UDO WHEN IONMERCIAL IS DEVELOPING ADJACENT Tb 1SINGLE FAMILY (151 BUFFER AREA P'NEH MASONRY WALL). �ID WALKS WILL BE CONSTRUCTED LONG THE BARRON ROAD FRONTAGE WITH THE STREET WIDENING PROJECT OR AS PART OF THE SITE DEVELOPMENT. ® I . Imo, • w Iw I CIO I • I • ■ I • 58-A9 1550A wr �'A sa On �v 10 p 06 1212z►o�