Loading...
HomeMy WebLinkAboutDrawingsF PAE LA�'�}l.IT�DETAIL. 12 7 Section Through Shop -1/8-= 1'-0" Arc ectural Elements (AE) Descriptions AE -19HOCO I, - Meta l gutter surround detail AE -2 -Metal Awning Exterior Specifications Front Elevation 1,060 sf Left Elevation 567 sf Total Wall Area 1,060 sf Total Wall Area 567 sf % Masonry 30 % Masonry 29 % Hardi Board Siding 19 % Hardi Board Siding 71 % Glazing Area 2 % Glazing Area -0- % Roll -up Doors 41 % Roll -up Doors -0- % Doors 8 % Doors -0- Rear Elevation I Right Elevation Total Wall Area 1,060 sf Total Wall Area 567 sf % Masonry 30 % Masonry 29 % Hardi Board Siding 62 % Hardi Board Siding 71 • Glazing Area -0- % Glazing Area -0- • Roll -up Doors -0- % Roll -up Doors -0- % Doors 8 % Doors -0- 12 Metal 1 Roof & Trim Vertical siding -- – — ertical sid Decorative relief element — _ _ Horizontal relief eleml AE -1 y 4" out from wall —Awning Hardi Board_ 12 4" out from 18'- 2 1 /4" 4' - 0" 18' - 2" 6 T -- ----- 18'- Right 8'- 1 1'-0"_12'-21/4"_1'-0" 12'- 2 1/4" 1' - 0" 12' - 2 1/2"_1 1 - 0" Exterior Color Schedule as per Sherwin Williams Color Wheel Color Color Name Paint Location Strip # �..�''�i�tG'tr.���..�►����� •��In��r•��r11Dt��r1���• ��i•��T�1i�i11��x��i•��� # r•�s..Wr..�r•+•r•�r..sr���..�►r..• �r•r.����r���r•sr•���►��� _ •����� � •����i• 5 Arresting Auburn 6034 Logo Text G Tony Taupe 7037 Primary Finish (Walls, Doors, etc.) H Urbane Bronze 7048 All Trim (Door, Window, Gutters, etc.) Ri ht Elevation - Faces Rear Property Line 1/8" = 1'-0" M FA—E-211 12 1 /X1_ AE -1 8'-21/4 '-0" 12'-21/4" 1'-0" n Left Elevation - Faces McCullough Rd. R.O.W. It 1/8" = 1'-0" Rear Elevation - Faces Interior Drive & Parking 1 /8" = 1'-0" i f Sheet Name I i Elevations Al �..�''�i�tG'tr.���..�►����� •��In��r•��r11Dt��r1���• ��i•��T�1i�i11��x��i•��� �rR�►r•�.. r001�s���r� �► r.r.. r•�+•���O��ir����r.��r.r•�>�.���'Ir�■ � i�i•�iili�il���l��i�i•������ r•�s..Wr..�r•+•r•�r..sr���..�►r..• �r•r.����r���r•sr•���►��� _ •����� � •����i• 1������������•■�i�• ���i���i���i���i���i���i���'i���i���il Foundation & Plumbing Pian 1�i�Jei���i���i���i��� ■� Ii�J�'i���i���i���i�1�i�1�i���i>•��i��! i t i Rear Elevation - Faces Interior Drive & Parking 1 /8" = 1'-0" Fire Department Lock Box 7048 White Limestone n Front Elevation - Faces Adjacent Property, Royder Tract G 1/411 = 1'-0" HORIZONTAL J 7037 HARDI BOARD 7037 REVIEWED FOR COMPLIAN E DEC 2 2 2015 COLLEGE EG E STATION I ON DEVELOPMENTR CES PLAT FILED: o' REVVY 11 t r " . ' A �s DEC 2 15 CO I'A SON ENG ERIN Sheet List i f Sheet Name I i Elevations Al i A2 j i I 1 Foundation & Plumbing Pian i t i i E 7048 I I - " 17' 9 7/32 Eave Hei ht 0o 16 048 AE -1 12 6 Structural Eave H. _ 15'-33/4" Int. Min. Clrnc. Awnin Hg t I1 8'--0" v E-1 7048 4'- 5" 33' - 2" 23'- 4 1/2" 23'- 5 1/2" AE -2 b m "315N' o oc� 0c)o 0 0 000 000 ocTo o OTO JCD00C � Ooo0oc�0oTC�0 000 0000 0000000000 000 0000 00000000000 0 \ / \ . \ \ 000 000 Too 0o Too ocTo 000 =0000000000 00000 000 000ao ❑0000 100000 000 0000 000ao 0000 0 00 / / , / // / / o o o o Fire Department Lock Box 7048 White Limestone n Front Elevation - Faces Adjacent Property, Royder Tract G 1/411 = 1'-0" HORIZONTAL J 7037 HARDI BOARD 7037 REVIEWED FOR COMPLIAN E DEC 2 2 2015 COLLEGE EG E STATION I ON DEVELOPMENTR CES PLAT FILED: o' REVVY 11 t r " . ' A �s DEC 2 15 CO I'A SON ENG ERIN Sheet List Sheet Number Sheet Name AO Elevations Al Dimension Plans A2 Electrical Plan A3 Foundation & Plumbing Pian WOODHILL STUDIOS Inc. P.O. Box 655 Millican, TX 77866 Sean Eubanks - President & C.E.O. (979) 255-9943 sean@woodhill-studios.com www.woodhill-studios.com WOODHILL STUDIOS MAY NOT BE HELD RESPONSIBLE AND ASSUMES NO LIABILITY FOR ANY CONSTRUCTION BASED ON THESE PLANS APPLICANT: Tripp Family Trust 1393 Seamist Lane College Station, TX, 77845 979-219-2774 No. Description Date Wellborn Business Park, Phase 2, 3 & 4 38037 38057 & 3809 McCullough Rd. College Station, TX Elevations Project number RH 08 2 11 Date 12/18/15 Drawn by Author Checked by Checker AO Scale As indicated 7 PH4SE LAY}ITTAIL 12 7 Section Through Shop 1/8" = 1'-0" Architectural Elements (AE) Descriptions AE -1 -Metal gutter surround detail AE -2 -Metal Awning 12 o(�d Cate rs e1Ere'r ►rope yr �rAiCOA Inc Exterior Color Schedule as per Sherwin Williams Color Wheel Color Color Name Paint Location Strip # 1,060 sf # 567 sf 5 Arresting Auburn 6034 Logo Text G Tony Taupe 7037 Primary Finish (Walls, Doors, etc.) H Urbane Bronze 7048 All Trim (Door, Window, Gutters, etc.) n Right Elevation - Faces Rear Property Line 1/8" = 1'-0" Q Exterior Specifications Front Elevation Sheet Number Left Elevation AO Elevations Total Wall Area 1,060 sf Total Wall Area 567 sf A3 % Masonry 30 % Masonry 29 • Hardi Board Siding 19 % Hardi Board Siding 71- • Glazing Area Roll 2 % Glazing Area -0 • -up Doors 41 % Roll -up Doors -01' • Doors 8 % Doors -01. Rear Elevation Right Elevation 11 Total Wall Area 1,060 sf Total Area Wall a ea 5 7 6 sf • Masonry 30 % Masonry 29 • Hardi Board Siding 62 % Hardi Board Siding 7�' • Glazing Area -0- % Glazing Area -OI • Roll -up Doors -0- % Roll -up Doors -0- • Doors .8 % Doors -0� Metal 12 nLeft Elevation - Faces McCullough Rd. R.O.W. It 1/8" = 1'-0" c c)ge ardo and n Rear Elevation - Faces Interior Drive & Parking 1/8" = V-0" HARDI BOARD n W Elevation -Faces Adjacent Property, Royder Tract = V-0" a Sheet List Sheet Number Sheet Name AO Elevations Ilk 1wal��.11 Dimension Plans A2 Electrical Plan A3 Foundation & Plumbing Plan l �IIi��.�lI��.III��..00a.•Me 11 IN s s�.�►��.s�a.���.���.�• r�I1�1�am,!, �a.���.���.�1►��.>♦��.���.��■ c c)ge ardo and n Rear Elevation - Faces Interior Drive & Parking 1/8" = V-0" HARDI BOARD n W Elevation -Faces Adjacent Property, Royder Tract = V-0" a Sheet List Sheet Number Sheet Name AO Elevations Al Dimension Plans A2 Electrical Plan A3 Foundation & Plumbing Plan WOODHILL STUDIOS Inc. P.O. Box 655 Millican, TX 77866 Sean Eubanks - President & C.E.O. (979) 255-9943 sean@woodhill-studios.com www.woodhill-studios.com WOODHILL STUDIOS MAY NOT BE HELD RESPONSIBLE AND ASSUMES NO LIABILITY FOR ANY CONSTRUCTION BASED ON THESE PLANS =11M.11,H11 Tripp Family Trust 1393 Seamist Lane College Station, TX, 77845 979-219-2774 No. Description Date Wellborn Business Park, Phase 2, 3 & 4 38037 3805, & 3809 McCullough Rd. College Station, TX Elevations Project number RH 08 2 11 Date 11/18/15 Drawn by Author Checked by Checker AO Scale As indicated �� / r V (t'0 J C 1 Ri ht Elevatior- Faces Adjacent Property, Royder Tract 1/4" = T-0" 4 Left Elevation - Faces Adjacent Property, Ruoff Tract 1/4" = 1'-0" Architectural Elements (AE) Descriptions AE -1 - Stone gutter surround detail AE -2 - Metal Awning i AE -117 12 6� TC HORIZONTAL AE -2 HARDI BOARD Ic c ED White Limesto DoomIDD m 3 Rear Elevation - Faces Rear Property Line, Opposite McCullough Rd. 7048 Exterior Color Schedule as per Sherwin Williams Color Wheel Color Color Name Paint Location Strip # IN, Masonry 28 # 23 G Bright White 7007 Roof Color G Tony Taupe 7037 Primary Finish (Walls, Doors, etc.) H Urbane Bronze 7048 All Trim (Door, Window, Gutters, etc.) H Show Stopper 7588 Roll Up Doors & Front Door Exterior Specifications Front Elevation 18'- Left Elevation Total Wall Area 1,808 sf Total Wall Arda 00 sf IN, Masonry 28 %D Masonry 23 %O Hardi Board Siding 48 % Hardi Board Siding 77 %O Glazing Area 1 %D Glazing Area -0- % Roll -up Doors 22 % Roll -up Doors -0- %O Doors 1 % Doors -0- Rear Elevation Right Elevation Total Wall Area 1,808 sf Total Wall Area 900 sf %D Masonry 12 % Masonry '.. 12 % Metal Siding 88 % Hardi Board Siding 88 • Glazing Area -0- % Glazing Area -0- % Roll -up Doors 46 % Roll -up Doors -0- %O Doors 1 % Doors -0- 0- 18'- 7 3/4" 1' - 0". 20'- 21 /4" �.,.. + :•..._ i V REVIEWED FOR COM LIA CE COMPLIANCE MAR 0 6 2015 , COLLI=uc STATION DEVELOPMENT RVICES � PLAT FILED* ­Jn dp r IJ J rl I lilg WOODHILL STUDIOS Inc. P.O. Box 655 -Millican, TX 77866 Sean Eubanks - President & C.E.O. (979) 255-9943 sean@woodhill-studios.com www.woodhill-studios.com WOOD14ILL STUDIOS MAY NOT BE HELD RESPONSIBLE AND ASSUMES NO LIABILITY FOR ANY CONSTRUCTION BASED ON THESE PLANS Consultant Address Address Phone Fax e-mail APPLICANT: Tripp Family Trust 1393 Seamist Lane College Station, TX, 77845 979-219-2774 No. Description Date Wellborn Business Park Phase #1 3808 McCullough Rd. College Station, TX Elevations Project number RH 08_2_11 Date 3/04/15 Drawn by Author Checked by Checker AO Scale 1/4" = 1'-0" �s �. 0� M 7 PHASE LAYOUT DETAIL.. 12 Section Through Shop 1 /8" = 1'-0" Architectural Elements (AE) Descriptions AE -1 - Hardi gutter surround detail AE -2 -Metal-roofed Awning Q 12 --======3 1 Elevation200, W0-20- 22004,54 1 I Pawl so a was, Right --..-- 0 a Exterior Color Schedule as per Sherwin Williams Color Wheel Color Color Name Paint Location Strip # # 5 Arresting Auburn 6034 Logo Text G Tony Taupe 7037 Primary Exterior Specifications Front Elevation Left Elevation Total Wall Area 1,060 sf Total Wall Area 567 sf Masonry 30 %Masonry 29 %Hardi Board Siding 19 %Hardi Board Siding 71 Glazing Area 2 %Glazing Area -0- Roll -up Doors 41 %Roll -up Doors -0- Doors 8 %Doors -0- Rear Elevation Right Elevation Total Wall Area 1,060 sf Total Wall Area 567 sf Masonry 30 %Masonry Sheet Number Sheet Name AO Elevations Al Dimension Plans A2 Electrical Plan A3 Foundation &Plumbing Plan Finish (Walls, Doors, etc.) H Urbane Bronze 7048 All Trim (Door, Window, Gutters, etc.) Elevation200, W0-20- 22004,54 1 I Pawl so a was, Right --..-- 0 a Exterior Color Schedule as per Sherwin Williams Color Wheel Color Color Name Paint Location Strip # # 5 Arresting Auburn 6034 Logo Text G Tony Taupe 7037 Primary Exterior Specifications Front Elevation Left Elevation Total Wall Area 1,060 sf Total Wall Area 567 sf Masonry 30 %Masonry 29 %Hardi Board Siding 19 %Hardi Board Siding 71 Glazing Area 2 %Glazing Area -0- Roll -up Doors 41 %Roll -up Doors -0- Doors 8 %Doors -0- Rear Elevation Right Elevation Total Wall Area 1,060 sf Total Wall Area 567 sf Masonry 30 %Masonry Metal Roof &Trim Hardi sidirn 12 relief eleme 4" out from N 6 � 15'-71/2 _ 12 2'-2114" 1'-0" 12'-21/4"�1'-0" 12'-21/4" 1'-0" MISSION 011 MOWN n Left Elevation -Faces McCullough Rd. R.O.W. HARDIBOARD r,—,, n Rear Elevation -Faces Interior Drive &Parking REVIEWED O� COPLIANE APR 2 0 2016 COLLEGE STATION Front Elevation -Faces Adjacent Property, Royder Tract DEVELOPMEN�ERVICES PLAT FILED: WOODH ILL* STUDIOS Inc. P.O. Box 655 Millican, TX 77866 Sean Eubanks -President & C.E.O. (979) 255-9943 sean@woodhill-studios.com www.woodhill-studios.com Sheet List Sheet Number Sheet Name AO Elevations Al Dimension Plans A2 Electrical Plan A3 Foundation &Plumbing Plan 19 %Hardi Board Siding 62 %Hardi Board Siding 63 %Glazing Area -0- %Glazing Area -0- Roll -up Doors -0- %Roll -up Doors 14 Doors 8 %Doors 4 Metal Roof &Trim Hardi sidirn 12 relief eleme 4" out from N 6 � 15'-71/2 _ 12 2'-2114" 1'-0" 12'-21/4"�1'-0" 12'-21/4" 1'-0" MISSION 011 MOWN n Left Elevation -Faces McCullough Rd. R.O.W. HARDIBOARD r,—,, n Rear Elevation -Faces Interior Drive &Parking REVIEWED O� COPLIANE APR 2 0 2016 COLLEGE STATION Front Elevation -Faces Adjacent Property, Royder Tract DEVELOPMEN�ERVICES PLAT FILED: WOODH ILL* STUDIOS Inc. P.O. Box 655 Millican, TX 77866 Sean Eubanks -President & C.E.O. (979) 255-9943 sean@woodhill-studios.com www.woodhill-studios.com Sheet List Sheet Number Sheet Name AO Elevations Al Dimension Plans A2 Electrical Plan A3 Foundation &Plumbing Plan WOODHILL STUDIOS MAY NOT BE HELD RESPONSIBLE AND ASSUMES NO LIABILITY FOR ANY CONSTRUCTION BASED ON THESE PLANS APPLICANT: Tripp Family Trust 1393 Seamist Lane College Station, TX, 77845 979-219-2774 No. Description Date Wellborn Business Park, Phase 2, 3 & 4 38037 3805, & 3809 McCullough Rd. College Station, TX Elevations Project number RH 08 2 11 Date 4/19/16 Drawn by Author Checked by Checker AO Scale As indicated '401 1L.0 -r� Front Elevation Color Left Elevation Paint Total Wall Area 1,493 sf Total Wall Area 567 sf • Masonry 30 % Masonry 29 • Hardi Board Siding 44 % Hardi Board Siding 71 • Glazing Area 2 % Glazing Area -0- • Roll -up Doors 19 %.Roll -up Doors -0- % Doors 5 % Doors ._0_ -0- Rear Rear Elevation Right Elevation Total Wall Area 1,333 sf Total Wall Area 567 sf % Masonry 18 % Masonry 29 % Hardi Board Siding 57 % Hardi Board Siding 71 % Glazing Area -0- % Glazing Area -0- % Roll -up Doors . 19 % Roll -up Doors -0- % Doors 5 % Doors -0- WOODHILL STUDIOS Inc. P.O. Box 655 Millican, TX. 77866 Sean Eubanks -President & C.E.O. (979) 255-9943 sean@woodhill-studios.com www.woodh.iii-studios.com WOODHILL STUDIOS MAY NOT BE HELD RESPONSIBLE AND ASSUMES NO LIABILITY FOR ANY CONSTRUCTION BASED ON THESE PLANS APPLICANT: Tripp Family Trust 1393 Seamist Lane,'.. (''nllnnn C+,n+inn TV 77PA r Left 1/8 Elevation -Faces Rear Property Line Rear Elevation - aces Adjacentrope y, oy er r - 3 „_ it 1 ,_ 1 /8 – 1 0 = 1 0 Exterior Color Schedule as per Sherwin Williams Color Wheel Color Color Name Paint Location Strip # Date 4/25/14 # r 5 Arresting Auburn 6034 Logo Text G Tony Taupe 7037 Primary Finish (Walls, Doors, etc.) H Urbane Bronze 7048 All Trim (Door, Window, Gutters, etc.) 1 I 1 I I I I I I I I I I I I li I I I I I I I I I I I I I 1 .1 I i I ! I( I I I I I I 1 1 1 1 I I 1 _ Eave Hei ht 14'-0' Structural Eave H: AE -1 13'- 3 3/4" (10 DC C Int. Min. Clrnc.. 12 12'- 3 1/4" 6 rc Int. PI. Hei ht . — 8' 0„ IC VERTICAL . \ / HARDI BOARD o /,LE f \� 00 00 COc000c�0CDo0oc)0oCD E CD00oo a oCD000 000coocao0oc�ooc�000 , OcoOOOa o _U 00000 O O O OOOOC�OOCOC�OI�OOC�OO COCOCOOC� White Limestone , M 100C -DUE 0000000000o Co00 o oao O 000000 0000 , 0000000000000000 coO�o 000000 ooc�0000DIDE o00000000 o 21'-811 ��-�"� 21'-81/4" 1'-0► 15'-53/4"\ 15'-53/4" 1'-p 21'-81/4". 1'-0 - 7037. 7G37— Front Elevation - Faces Interior. Drive & Parking-:` S' 2 1/A""= 1 ,-nll Wellborn Business .Park - Phase 5 .3808 McCullough Rd.. College Station, TX Elevations Project number RH 08_2_11 Date 4/25/14 Drawn by r Checked by Mtkgri A6 I IAN JUN `2 4 2014 Scale C U f a, 10jwwa 1 i 'i OODHILL STUDIOS �I Inc P.O. Box 655 Millican TX 77866 Sean Eubanks - President & C.E.O. (,79) 115-1141 sean@woodhill-studios.corn www.woodhill-studios.com AND ME LIABILITY WOO. NYC CONSTRUCTION NOT ON ASSUMES TY FO ANY CONSTRUCTION BASED ON THESE PLANS AE -2 AE -2 12 AE -2. Metal Consultant AE -1 Roof & Trim 1 12 Address AE -2 Address ® 1 AE -1 Phone Fax D e-mail 4' - 0' 23'- 2" O Metal Roof APPLICANT: Ic Tripp Family Trust 4,-0., 4 3 1393 Seamist Lane 4. 3» HoriZent� College Station, TX, 77845 D Steel Panel Siding Nardi eo0rd 4 -0. 979-219-2774 in 00cc��00cc��_o_oc�00 o0tt��0_0cc��o�o Docc��_cc_��__Occ��_o_oco��0 00 0oc�_Doc�ooc�Oc� 00 c� 00 0 00 Oc�00c�C�Oc�00c� O Oc�C�Oc�C�Do OcoC�ooC�O�Stone�=3 PC=, �C�OoC�Dc�OOc� Oo o O0 0o Oo Oo 00 0o Oo 0o O o �r 01 - 000000000000 000000000C�o O O ��o�Do�D �Oo�0CDJCDOUC �DDoc�Oe�`�Oe��Doe�c�oe� Mone c�Oe ooe�o0 Do O�� c�c�Oc�Doc�oo CSO [�O OC_' O� OOOo000000(�00 OOcoOOc��DOc� Oce D cc�� r O o00 OOc�0 =0Do�'J 00 00 0000000 0000000_�a0000000D000000000000000000000000o O0000 00000a0oo0c 0 0 0 o O o o O o c� O - o o �c�00000c-��Oc��Oc�O0000c goo 0 0 0 0 O o o O 0 o 50'-— � 0» T n Left Elevafion - Faces Adjacent Property, Royder Tract S 1/4 — 1 -0 >. n_Rlght.Elevatlon Faces Adjacent Property Ruoff Tract �- s� f Exterior cIfi cations Front Elevation —t Left Elevation Location Total Wall Area 1,808 sf Total Wall Area 900 sf % Masonry 28- % Masonry 23 % Hardi Board Siding 48 % Hardi Board Siding 77 % Glazing Area 1 % Glazing Area -0- % Roll -up Doors .22 % Roll -up Doors -0- % Doors. 1 % Doors - -0- Rear Elevation Right Elevation Total Wall Area 1;808 sf Total Wall Area 900 sf % Masonry 24 B/a Masonry 23 % Hardi Board Siding - . 29 % Hardi Board Siding 77 % Glazing Area _ -0- ' % Glazing Area -0- % Roll -up Doors 46 % Roll -up Doors -0- % Doors 1 % Doors -0- Exterior Color Schedule as per ;herwin Williams Color Wheat Color Color Name Paint Location Strip # # Date I 4/25/14 G Tony Taupe 1037 Primary Finish (Walls, Doors, etc.) H Urbane Bronze I 7048 All Trim (Door, Window, Gutters, etc.) �' I 3808 Wellborn Business Park - Phase #1 McCullough Rd. College Station, TX L Elevations is Project number RH 08_2_ 11 Date I 4/25/14 Drawn by Author Checked by Checker A5 Scale REVIEWEn, - N J Ca"' E UO-MAIPLIAq JU : 4 2014 x� r fi r,. 0 i €•-i # 14,. N trJ MGMME M P4't g fig • am All p. Zt - MW Front Elevation Left Elevation Total Wall Area 1,060 sf Total Wall Area 567 sf % Masonry 23 Masonry 29 % Hardi Board Siding 15 % Hardi Board Siding 71 %Glazing Area -0- % Glazing Area -0- % Roll -up Doors 54 % Roll -up Doors -0- % Doors 8 % Doors -0- Rear Elevation Right Elevation Total Wall Area 1,060 sf Total Wall Area .567 sf % Masonry, 18 % Masonry 29 % Hardi Board Siding 20 % Hardi Board Siding 71 % Glazing Area -0- % Glazing Area -0- % Roll -up Doors 54 % Roll -up Doors -0-, IYO Doors 8 % Doors -0- rA PHASE LAYQUT DETAIL 12 � Section Through Shop 1/8" = 1'-0" 12 1 Exterior Color Schedule as per Sherwin Williams Color Wheel Color Color Name Paint Location Strip # # 5 Arresting Auburn 6034 Logo Text G Tony Taupe 7037 Primary Sheet Number Sheet Name AO Elevations Al Dimension Plans A2 Electrical Plan A3 Foundation &Plumbing Plan ��►a��a��iiiasii��arsa��a� H `r�—s'�' ioi�iioiii� 7048 liii�iw�i •i�ivi� 1V�:• ������ 1% Irj��� �V:' Exterior Specifications Front Elevation Left Elevation. Total Wall Area .1,.060 sf Total Wall. Area 567sf Masonry 30 %Masonry 29 Hardi Board Siding 19 %Hardi Board Siding 71 Glazing Area 2 %Glazing. Area -0- Roll -up Doors 41 %Roll -up Doors -0- Doors 8 %Doors -0- Rear Elevation Right Elevation Total Wall Area 1,060 sf Total Wall Area 567 sf Masonry 30 %Masonry Metal 42 Roof &Trim --- 1 ------Vertical Sheet Number Sheet Name AO Elevations Al Dimension Plans A2 Electrical Plan A3 Foundation &Plumbing Plan Finish (Walls, Doors, etc.) H Urbane Bronze 7048 All Trim (Door, Window, Gutters, etc.) 19 Hardi- Board Siding 62 %Hardi Board Siding 63 %Glazing Area -0- %Glazing Area -0- % Roll -up Doors -0- %Roll -up Doors 14 Doors 8 %Doors 4 siding Decorative relief element -- - -Horizontal 12 4 out from wall Avening Hardi Board-- 6C oard 6� 15'-71/2" 4'-0" 20'-81/2" 10 A721v'-0"-12'- 2 1/4 1 -0"-12'- 2 114 1'- 012-91ra1_n n Left Elevation. -Faces McCullough Rd. R.O.W.Doi a MIA n Front Elevation -Faces Adjacent Property, Royder Tract HARD[ BOARD Architectural Elements (AE) Descriptions AE -1 -Metal gutter surround detail AE -2 -Metal Awning a�.�a�:�arl��Il��� l��l��l��r��! ��l�a�i��l�il��i��l��l��l��!■ �J�1�1�!'���l���li���l��'•l���11 ��'•��_1���1�1��'•r1��'• �l����>♦�'•���������_l� n Rear Elevation -Faces Interior Drive. &Parking �a��►a�oa�sa��a�sa��a�sa��►a�� 1811fte WCC®DRILL ST[31® Inc. P.O. Box 655 Millican, TX 77866 Sean. Eubanks -President & C.E.O. (979) 255-9943 sean@woodhill-studios.com wrivW.woodhill-studios.com wOODHILL STUDIOS MAY NOT BE HELD RESPONSIBLE AND ASSUMES NO LIABILITY FOR ANY CONSTRUCTION BASED ON THESE Sheet. List Sheet Number Sheet Name AO Elevations Al Dimension Plans A2 Electrical Plan A3 Foundation &Plumbing Plan Finish (Walls, Doors, etc.) H Urbane Bronze 7048 All Trim (Door, Window, Gutters, etc.) a�.�a�:�arl��Il��� l��l��l��r��! ��l�a�i��l�il��i��l��l��l��!■ �J�1�1�!'���l���li���l��'•l���11 ��'•��_1���1�1��'•r1��'• �l����>♦�'•���������_l� n Rear Elevation -Faces Interior Drive. &Parking �a��►a�oa�sa��a�sa��a�sa��►a�� 1811fte WCC®DRILL ST[31® Inc. P.O. Box 655 Millican, TX 77866 Sean. Eubanks -President & C.E.O. (979) 255-9943 sean@woodhill-studios.com wrivW.woodhill-studios.com wOODHILL STUDIOS MAY NOT BE HELD RESPONSIBLE AND ASSUMES NO LIABILITY FOR ANY CONSTRUCTION BASED ON THESE Sheet. List Sheet Number Sheet Name AO Elevations Al Dimension Plans A2 Electrical Plan A3 Foundation &Plumbing Plan PLANS APPLICANT: Tripp Family Trust 1393 Seamist Lane College Station, TX, 77845 979-219-2774 No. Description DateA' U Wellborn Business Park, Phase 2, 3 4 38037 38057 3809 McCullough d. College Station, TX Elevations Project number RH 08 2 11 Date 4/06/1.6 Drawn by Author Checked by Checker - Scale As indicated