Loading...
HomeMy WebLinkAboutDrawingsLandscape Requirements: Landscape Legend: '1 Perform all work in accordance with all applicable laws, codes, ynd regulations required by authorities having jurisdiction over such work and provide all inspections and permits required by Federal, State, and local authorities in supply, transportation, and installation of materials. 2. The contractor shall be. responsible for the verification of all underground utility lines (telephone, gas, water, electrical, cable, TV, etc.) and all overhead utility easements prior to start of any planting works. 3. All plant materials shall possess the following minimum qualities: a. Plants shall be nursery grown in accordance with good horticultural practices under climatic conditions similar to those of the project for at least twelve months. b. All plants shall be heavy, symmetrical, tightly knit, so trained or favored for development and appearance as to be superior in form, number of branches, compactness, and symmetry. C. Plants shall be sound, healthy and vigorous, well branched, and densely foliated when in leaf. They shall be free of disease, insects, pests, eggs, or larvae. d. All plants shall be true of species and variety and shall conform to measurements (caliper size, trunk heights, spread) as specified on the drawings. e. Container grown stock when specified shall have grown in the container in which delivered for at least six months, but not over two years. Samples must prove no rootbound conditions exist. f... Caliper measurements shall be taken at a point on the trunk six inches (6") above natural ground line for trees up to four inches (4") in caliper. g. All trees shall be staked by a minimum of two metal "T" stakes for single trunk trees and three stakes for all multi -thunk trees, 4. Planting mix shall be thoroughly mixed in the following proportions; a. Prepared soil as backfill for shade and ornamental trees shall be: 5 part clay loam topsoil + 2 part compost + 1 part sharp sand + 4 Lbs. Commercial fertilizer per CY Or 10 Lbs. Organic fertilizer. b. Prepared soil as backfill for shrubs and groundcovers and seasonal colors shall be: 1 part enriched mulch + 'i part compost bark mulch + 1 part enriched topsoil + 1 part No. 1 Bank ' Sand + 3 Lbs. Time- released fertilizer, 14-14-14 per CY or 8 Lbs. Organic fertilizer. 5. Excavation work and Surface drainage works shall conform to the following requirements: a. Test drainage of plant beds and plant pits by filling with water twice in succession. Conditions permitting the retention of water for more than 24 hours shall be brought to the attention of the Owner. b. Work shall include the final responsibility for proper surface drainage of planted areas. Any obstructions on the site, or prior work done by another part, which precludes establishing proper. drainage shall be brought to the attention of the Owner in writing. C. Excavate each tree hole 18" deep plus the depth of the tree container size (-15 gal. Or 30 gal. Or 65 gal. Or 100 gal.). d. Excavate entire shruh bedtoa depth of 8" plus the depth of the shrub container size (5 gal.) unless noted as being pit planted on landscape legend. e. Excavate entire groundcover bed to a depth of 6" plus the depth of the groundcover container size (4" pot or 1 gal.). 6. Additional work requirehients on landscape areas: . Symbolic Quantities Botanical Common Size and Plaut Requirements Name (Verify) Name Name 3" cal. min. 65 gal. container; 10' to 12' UP 3 Litmus Parvifolia La* cebark 3" cal. 6 Street Trees Required, Semperviren Elm ht. 3" cal. min. 66 gal. container; 10' to 12' LO 8 Quercus Live Oak 560 Points (lts 4. Virginiana 5 gal. ht: LI Lagerstroemia Natchez White 2" cal. min. 30 gal. container, 8'-9' ht. ADDITIONAL LANDSCAPE POINTS FOR STREET SCAPE t Indica Crepemyrtles multi -trunk LF 10 Leucophyllum Texas Sage 5 gal. planted at 30" o.c. 956 Points required. CC BCS 1 LP Frustescens 1700 Research Parkway 5 gal, planted at 30" ox, RI i Architect: i Raphiolepis Clara Indian Houston, TX 77056 (713) 877-1274 Indica. Hawthorn 2730 Longmire Drive DP t t Pittosport.rrn Dwarf _ 5 gal. planted at 30" o.c. Bryan, TX 77803 - (979) 268-3195 .. Wheeled Pittosporum 5207 Spruce (! ' Bellaire, TX 77401 SG 09.26.12 Tulbaghia Society Garlic 1 gal. planted at 24" o.c, with AZ 10.0 11. City Review Comments Violacea Dote: 0000000 bed, Iris i Morae Dietes Butterfly Iris 3 gal. planted at 18" o.c. Iriododes Edge Verify Proposed 18" wide maintenance i LF. edge to be constructed around building. Excavate channel 3" deep; install filter fabric over stabilized subgrade prior to installing 1" diameter to -1-1/2" diameter bull rocks over channel. Make sure edging is set to drain away from building at all locations. Grass Verify Cynodon Common Hydromulch, All unpaved and SF. Dactylon Bermuda unplanled areas within project site shall be cleaned up, fine graded to drain properly per civil grading plan prior to grass works. a. Prior to Installation of any planting works (trees, shrubs,groundcover and grass works); apply "Round Up" in all planting areas to eradicate all weed growths on site. b. Install weed control barriers in all trees, shrub and groundcover planting areas, Weed barrier j fabric shall be black polypropylene sheet 27 mils thick, 4 oz/s.y, grab tensile strength per ASTM D-4632; 90 lbs. (machine direction) 50 lbs. (cross machine direction). Provide DeWitt "Weed Barrier" or aprpoved substitute. C. Edge all planting bed areas with Ryerson steel edging to clearly define the edge of the planting bed the start of the grass areas. Edging shall be Ryerson estate Curb, 1/8"x4" with new - stakes free of rust. d. Spread a minimum two inch layer of pine bark mulch overall shrub and groundcover bed areas. i 7. Landscape maintenance work by the Landscape Contractor after final acceptance shall include the following: a. The maintenance period shall commence upon inspection and approval at Final Acceptance and + shall be for a period of Thirty Days (30). I b. Tyre landscape contractor shall coordinate the watering program for all the landscape work with ! the Owner. C. Maintenance of new plantings shall consist of watering, cultivating, weeding, mulching, restating, tightening and repair of guys; resetting plants for proper grades or upright position, and furnishing and application of pesticides/herbicides; sprays, and invi orants as are necessary to keep plantings free of insects and disease and in Cl thriving condition. I 8. Warranty Periods, Plant Guarantees, and Replacements: Vl a. Planting supplied shall be warranted to remain alive and healthy fora period of twelve months (12) after the date of Final Acceptance by Owner. Plants in an impaired, dead, or dying condition after initial acceptance or within 12 months shall be removed and replaced immediately to the - satisfaction of the Owner. i an. vvv.+ r, .,Vll IIG1V 4/UVVl11 -GI, II I—Y —IU VU 1O1 YY 1— t.i G11I lO&, III LI Q1101\ — 111 OtVI Q&U VV III IIVt VU acceptable. b.' All grass seed shall be fresh, re -cleaned grass seed of the latest crop, mixed in the following proportions by weight and meeting the accepted standards of pure live seed content, purity and germination. c. Grass seed shall have the following minimum ratio: Summer Mix: Cynodon Dactylon (Hulled Common Bermuda Grass) 85% pure live seed at 75 Lbs. Pure live seed per acre: Winter Mix: Cynodon Dactylon (Unhulled - Common Bermuda Grass) 85% pure live seed at 75 Lbs, Pure live seed per acre. Annual Rye Grass or equal, 85% pure live seed at 175 Lbs. Pure live seed per acre. 2. Slurry Mix Component per Acre shall be Wood cellulose fiber mulch = 2,000 pounds + Grass Seed as specified +fertilizer (13-13-13) 800 pounds. 3. Hydromuiched,seeding on Prepared finished grades: a, Install and spread out a minimum of one inch layer of topsoil over all areas to be hydromuiched. b. Bed preparation: immediately after the finished grade has been approved, begin hydroseeding operation to reduce excessive weed growth and erosion, c. Apply seed, fertilizer and mulch by spraying them on the previously prepared seedbeds in the form of an aqueous mixture and by using the methods and equipment described herein. d. Particular care shall be exercised by tine contractor to insure that the application is made uniformly ; Areas Requiring Landscape Landscape Calculations Landscape Required Quantity Streetscape: ,1. Lacebark.Elm 1. 83.33' 191.70 LF - 24 ft. driveway / 32 = Ei Street Trees. 450 2. Live Oak 3" cal. 6 Street Trees Required, Cl 1200 50,00' 95°29'20" 55.03' 7 {.02' S05'47'29"E 560 Points (lts an. vvv.+ r, .,Vll IIG1V 4/UVVl11 -GI, II I—Y —IU VU 1O1 YY 1— t.i G11I lO&, III LI Q1101\ — 111 OtVI Q&U VV III IIVt VU acceptable. b.' All grass seed shall be fresh, re -cleaned grass seed of the latest crop, mixed in the following proportions by weight and meeting the accepted standards of pure live seed content, purity and germination. c. Grass seed shall have the following minimum ratio: Summer Mix: Cynodon Dactylon (Hulled Common Bermuda Grass) 85% pure live seed at 75 Lbs. Pure live seed per acre: Winter Mix: Cynodon Dactylon (Unhulled - Common Bermuda Grass) 85% pure live seed at 75 Lbs, Pure live seed per acre. Annual Rye Grass or equal, 85% pure live seed at 175 Lbs. Pure live seed per acre. 2. Slurry Mix Component per Acre shall be Wood cellulose fiber mulch = 2,000 pounds + Grass Seed as specified +fertilizer (13-13-13) 800 pounds. 3. Hydromuiched,seeding on Prepared finished grades: a, Install and spread out a minimum of one inch layer of topsoil over all areas to be hydromuiched. b. Bed preparation: immediately after the finished grade has been approved, begin hydroseeding operation to reduce excessive weed growth and erosion, c. Apply seed, fertilizer and mulch by spraying them on the previously prepared seedbeds in the form of an aqueous mixture and by using the methods and equipment described herein. d. Particular care shall be exercised by tine contractor to insure that the application is made uniformly ; and at the prescribed rate and to guard against miss and overlapped areas. 1200 points from canopy trees > 50% V. Where slope of areas to be grassed exceed a 3:1 H:V; all erosion control fabric shall be installed prior to hyromulching process. 4. Maintenance: a. Maintenance shall consist of weeding, fertilizing, insect control, watering, replanting, mowing, maintaining of existing grades and repair of any erosion damages, b. Guarantee growth and coverage of hydromulch planting shall be a minimum on ninety five percent 95% of the area planted will be covered with specified planting after sixty days with no bare spots visible. c. Watering: Coordinate with the Owner to properly operate irrigation system to assure a regular, deep watering program. 5. Inspection and Final Acceptance: Final acceptance of lawn establishment shall mean that hydroseed areas are Ninety Five percent 95% uniform coverage of grass in excess of one inch height. No bare spots will be acceptable. CURVE LENGTN RADIUS DELTATANGENT �NOT.E) CHORD. DIRECTIvN Areas Requiring Landscape Landscape Calculations Landscape Required Quantity Streetscape: ,1. Lacebark.Elm 1. Francis Street 191.70 LF - 24 ft. driveway / 32 = Ei Street Trees. 450 2. Live Oak 3" cal. 6 Street Trees Required, 8 1200 3, Crepemyrtles 2. Foster Avenue 175.00 LF -24' ft driveway / 32 = 5 street trees, . 560 Points (lts 4. Leucophyilum Frustescen (Texas Sage) 5 gal. 5 Street Trees Required, 5. Indian Hawthorn. 3. ADDITIONAL LANDSCAPE POINTS FOR STREET SCAPE (191.7-24)+(175-24)/ 50x3O0 = 1,912.20 Points required. 6. Dwarf Pittosporum 5 gal. 10 4. LANDSCAPE REQUIREMENTS (Point Per project Area): 31,859 SF./1000 = 31.8500 956 Points required. CC BCS 1 LP c/o Clint Cooper 1700 Research Parkway Total Points Required = 2,868 Points and at the prescribed rate and to guard against miss and overlapped areas. 1200 points from canopy trees > 50% V. Where slope of areas to be grassed exceed a 3:1 H:V; all erosion control fabric shall be installed prior to hyromulching process. 4. Maintenance: a. Maintenance shall consist of weeding, fertilizing, insect control, watering, replanting, mowing, maintaining of existing grades and repair of any erosion damages, b. Guarantee growth and coverage of hydromulch planting shall be a minimum on ninety five percent 95% of the area planted will be covered with specified planting after sixty days with no bare spots visible. c. Watering: Coordinate with the Owner to properly operate irrigation system to assure a regular, deep watering program. 5. Inspection and Final Acceptance: Final acceptance of lawn establishment shall mean that hydroseed areas are Ninety Five percent 95% uniform coverage of grass in excess of one inch height. No bare spots will be acceptable. CURVE LENGTN RADIUS DELTATANGENT �NOT.E) CHORD. DIRECTIvN Landscape Plantings Size College Station Points Quantity Total Points Provided ,1. Lacebark.Elm 3" cal. 150 3 450 2. Live Oak 3" cal. 150 8 1200 3, Crepemyrtles 2" cal. 40 :J1— 560 Points (lts 4. Leucophyilum Frustescen (Texas Sage) 5 gal. 10 5. Indian Hawthorn. 5 gal. 10 LOTS.9, & 10, BLOCK 3 �! 4_'d 6. Dwarf Pittosporum 5 gal. 10 _'-? It t I (979) 492-0425. .. Owner: CC BCS 1 LP c/o Clint Cooper 1700 Research Parkway Suite 240 College Station, TX 778451,, (979) 260-7000 i'; i Architect: i Hill & Frank, Inc. -- 5 Total Points E OF T'�4 tk �+ fr AQP 0•70 NG r 1. � 'ong car lissocibtes, .h]C. ' 5207 Spruce. Bellaire, Texas 77401-3310 Tel. 7.13 777 9198 Fax 713 777 4.104 Member. American Sociely ofl-andseape Architects s 1-7 Cr"' p CD Legal Description: LOTS.9, & 10, BLOCK 3 �! COLLEGE HILLS ESTATES VOLUME 100, PAGE 440 [ s, COLLEGE STATION, BRAZOS COUNTY, TEXAS Total Site Area .73 Acres Applicant Jesse Darden P.O. Box 12214 College Station, TX 77842 (979) 492-0425. .. Owner: CC BCS 1 LP c/o Clint Cooper 1700 Research Parkway Suite 240 College Station, TX 778451,, (979) 260-7000 i'; i Architect: i Hill & Frank, Inc. 1800 St. James Place, Suite 205 Houston, TX 77056 (713) 877-1274 Civil Engineer Schultz Engineering 2730 Longmire Drive College Station, TX 77845 (979) 764-3900 Surveyor Kerr Surveying; LL( 409 N. Texas Avenue Bryan, TX 77803 - (979) 268-3195 .. Landscape Wong & Associates; Inc. 5207 Spruce (! ' Bellaire, TX 77401 (713) 777-9198 09.26.12 Updated Per City Review Comments. 10.0 11. City Review Comments PI-o1ec t: i Dote: 0000000 37" 8--8 A5F'FIAL 1 I -A VtMt IV L DETAILS EXISTING 12"J SEWER LINE I CD N Cb O _G7li D ;1 %C -i * D -a rr EVIE r A' to N Curve Table LEGEND CURVE # LENGTH RADIUS DELTA TANGENTCHORD CHORD DIRECTION EXISTING CONTOUR C1 83.33• 50.00' O95'29'20" 55.03' 7402' SW47'29`E PROPOSED COMDR BOUNDARY '3 FLOW DIRECTION FiRE HYDRANT GATE VALVES OSANITARY SEWER MANHOLE 5-6- PROPOSED SANITARY SEWER W-6 PROPOSED WATER TINE ST ST PROPOSED SWM SEWER U ........_... . ............. CONSTRUCTION EKN ED SILT FENCE INLET PROTECTION WHEEL STOP ACCESSIBLE ROUTE DECORATIVE FENCE (PER ARCHITECTURAL DETAIL' AE ""----^- OVERHEAD ELECTRIC UNE TIRE LANE Curve Table r. CURVE # LENGTH RADIUS DELTA TANGENTCHORD CHORD DIRECTION C1 83.33• 50.00' O95'29'20" 55.03' 7402' SW47'29`E 11 VICINITY MAP FROMCT J LbCAMN 17 NOT TO SCMS NOT,,'? 8'20 2 COLLEOE S A ®i ENGI EE ENG EXISTING MH #2 RIM=314.45 REVIEWED FOF uOMPL MN NOv 2 8 2012 ��V 4.;ah�s�R4�11� I'•I �.s�.�.d 1 4° �^�i PLA SITE SPECIFIC Hg= - 1. THE OWNER OF THE PROPERTY IS CC BCS 1 I.P. THE SUBJECT PROPERTY IS LOTS 9 AND 1% BU OF THE FiRST INSTALLMENT OF COLLEGE HILLS ESTATES, VOL. 96 PG. 498. THE PROPERTY IS ZONE PDD WITH 96 BASE ZONING. 2. THE DISTURBED AREA FOR THIS PROJECT 1S 0.73 ACRES (31.859 SF). 3. DRAINAGE INFORMATION AND DETAILS WELL BE PROVIDED ON THE DRAINAGE PLAN AND DRAINAGE REE 4 LANDSCAPING AND i NCA710H DESIGN AND ANALYSIS WILL BE PROVIDED ON THE LANDSCAPE AND IRRIGATION PLANS. S. THE IRRIGATION SYSTEM MUST Be APPROVED AND INSTALLED PRiOR TO C.O. $' THE MINIMUM REQUIRED FIRE FLOW FOR A COMMERCIAL BUILDING IBC TYPE VA OF 27,806 SF IS 3, MONSGALLONS PER MIEIM THE BUILDING IS FULLY SPRINKLED WHiCH DECREASES THE REQUIRED FIRE F X (1,500 GPM). ONE FIRE HYDRANT is REQUIRED. THE HYDRANT FLOW WELL BE PROVIDED AN EXISTING HYDRANT AND A PROPOSED HYDRANT WHICH IS NEEDED TO SERVE THE FIRE DEPARTME CONNECTION. 7. THE SUBJECT TRACT DOES NOT LIE WITHIN THE 100 YEAR FLOODPLAIN ACCORDING 'T'0 FEMA F LOOO INSURANCE RATE MAPS FOR BRAZOS COUNTY, MM AND INCORPORATED AREAS. COMMUNITY NO. 480083, PANEL NO. 30SE MAP NO. 48"IC0305E. EFFECTIVE DATE. MAY. 16. 2012. 8. ALL RADII AND DISTANCES ARE MEASURED TO THE BACK OF CURB UNLESS OTHERWISE NOTED. 9. ALL PAVEMENT SHALL BE C N1CRETE. REFER TO THE PAVEMENT PLAN FOR PAVEMENT DEPTHS: 10. ALL. UTILITY LINES WATER. GAS, SANITARY SEWR. VERIZON. STORM SENDER, ETC.) SHOWN AIB= TAKE FROM BEST AV RECORD INFORMA71ON BASED ON CONSTRUCTION UTTUTY MAP DOCUMENTS OBTAINED BY FROM CITY AND INDEPENDENT AGENCIES AND/OR ABOVE GROUND FIELD EVIDENCE. SI POSITIONS MAY NOT REPRESENT AS-BULT CONDITIONSi, 11. BUILDING SETBACK LINES SHALL BE IN ACCORDANCE WITH THE CITY OF COLLEGE STATION umFlE o DEVELOPMENT ORDINANCE AND APPROVED PDD ZONING. 12. � SO AS --NOT 70 $ IN7ED MECHANICAL VISIBLE FROM ANY PUBLICRIGHT-OF-WAY OR RESIDBE SCREEMED ENTiAL DISTRICT W 1-W OF BE COORDINA' ED WITH THE BUILDING ARCHITECTRED FROM A URE AND SCALE TFEET OVE GRADE. ED MAINTAIN A UNIFI CH SCREENING EARAN( 13. PROPOSED SIGNS SHALL BE PERMITTED SEPARATELY IN ACCORDANCE WITH THE LIDO AND PDD ZONIc 14. ALT. >LECTwx IMPROVEMENT$ $HALL BE PER comm STATION UTILITIES SPECIFICATIONS AND PER COLLEGE STATION UTILITIES, EIECTRTCAL DESIGN FOR THIS PROJECT. CSU ELECTRICAL CONTACT: CSU ELECTRIC PROJECT COORDINATOR CITY OF COLLEGE STATION UTILITIES PH: 979-704-W14 15. THE FIRE SUPPRESSION UNE SHALL HAVE A LOCKABLE UD ON THE ISOLATION VALVE, THE LOCKABLE SHALL SUPPLY THE SAME PROTECTION AS THE AMP OR USA, LL562 LOCKING UD AT MINIMUM. AN ALTERNATE LOCKABLE LID SHALL BE APPROVED By COLLEGE STATION UTILITIES OR HES DESIGNEE 16. TRAFFIC IMPACT ANALYSIS IS NOT REQUIRED. 17. COVERED PARTING S LOCATED WITHIN THE BUILDING SETBACK. THE PDD ZONING WELL BE AMENDED I ALLOW THE COVERED PARKING iN THE BUILDING SETBACK, 18. THE GATE TO FRANCIS DRIVE IS FOR FIRE DEPARTMENT EMERGENCY ACCESS USE ONLY. IN THE EVEN THE GATE IS LEFT OPEN, THE CITY OF COLLEGE STATION RETAINS THE ABILITY 70 CLOSE THE GATE WITHOUT CONSULTING THE PROPERTY OWNER. 19. FOSTER AVENUE APARTMENTS. COLLEGE HILLS ESTATES BLOCK 3 LOTS 9-10. IS TO BE CONSIDERED BUILDING PLOT FOR THE PURPOSE OF SIGNAGE AND LANDSCAPING. 20. ACCESS SHALL BE PROVIDED AT ALL TIMES FOR POLICE; FIRE. CITY INSPECiTCN% MAiL DET.TVERY, GARBAGE PICK -LIP. DUAL -A -RIDES. UTILITY. SCHOOL BUSES. AND 07HER HEALTH AND SAFETY -RELATE! VEHICLES. ACCESS MUST NOT REQUIRE DRIVERS TO EXIT THEiR VEHICLE 21. A KNOX BOX WILL BE REQUIRED FOR THE GATE ON FOSTER AND NEAR THE rdSER ROOM PER FIRE DEPARTMENT REQUIREMENTS. 22. A KNOX PADLOCK WILL. BE INSTALLED ON AAE ACCESS GATE ON FI7ANCI5, 23. THE DETENTION AND DRAINAGE FACIUTTES MUST BE CONSTRUCTER) FIRST. GENERAL NOTES: I- THE CONTRACTOR SHALL 13E RESPONSIBLE FOR VERIFYING THE EXACT LOCATION OF ALL EXISTING UNDERGROUND UTIUTTES. NOTIFICATION OF THE UTILITY COMPANIES 48 HOURS IN ADVANCE OF CONSTRUCTION IS REQUIRED. DIG TEES: (800) 344-8377 ATMOS ENERGY: (979 774-2506 SUDDEN LINK COMMUNICATIONS: (979 995-2429 VERIZON: (979) 821-4770 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO USE WHATEVER MEANS NECESSARY TO MINIMIZE EROSION AND PREVENT SEDIMENT FROM LEAVING THE PROJECT SITE THIS INCLUDES THE INSTALiA71 N OF A CONSTRUCTION EXIT AND SILT FENCE AS NECESSARY. 3. THE CONTRACTOR IS RESPONSIBLE FOR OLVE3CTING AND MAINTAINING THE EROSION AND SEDIMENT CONTROL DEVICES. INSPECTIONS SHAM BE HONE EVERY 14 DAYS AND AFTER EVERY RAINFALL EVEW OF 1/2" OR MORE THE CONTRACTOR SHALL REMOVE ALL MUD DEPOSITED ON THE ADJACENT STREETS AS A RESULT OF THE CONSTRUCTION OF THIS PROJECT: 4. THE CONTRACTOR IS REQUIRED 70 MAINTAIN THE 7PDES GENERAL PERMIT NO. rAR 150000 REQUIREMENTS FOR CONSTRUCTION STIES. 5. PERMANENT VEGETATION WILL BE ESTABLISHED ON THE DISTURBED AREAS AFTER CONSTRUCTION LS ' COMPLETE BY HYDROMULCHING AND SEEDING ALL DISTURBED AREAS. S. ALJ. CONSTRUCTION SHALL BE iN ACCORDANCE WITH THE 2012 CITY OF BRYAN/COLLEE STATION STANDARD SPECIRCA71ONS AND DETAILS FOR WA7M ALL CONSTRUCTION SHALL BE CXX>itDiNATt;D WITH THE CITY ENGINEER'S OFFICE 7. THE CONSTRUCTION SHALL COMPLY WITH OSHA STANDARD 29 CSR PART 1926 SUBPART P FOR liiEfV SAFETY REOUIREMS T5, 8. THE CONTRACTOR SHALL REMOVE THE EROSION CDNMOL MEASURES ONCE GRASS IS ESTABLISHED. 9. INLET PROTECTION 70 BE INSTALLED AT ALL. PROPOSED AND EXISTING INLET'S ADJACENT' TO THE PROJECT SITE 10. CONTOURS SHOWN ARE FROM FIELD SURVEY DATA PREPARED BY KERR SURVEYING, LLC. I 11. D(TERIOR BUILDING AND SiTE UG TING WILL MEET THE STANDARDS OF SECTION 7.10 OF THE UNIFIED NO FIXTUDEVELORMENT ORDINANCEE RE SHAD. DTREMYiPROJECT- LIGHT HORIZE UGHT SOURCE �ON3NALLY: FIXTURES WILL Be MOUNTED N SUCH OT PROJECT BELOW A14 OPAQUE HOUSING A MANNER THAT THE PROJECTED CONE OF LIGHT DOTS NOT CROSS ANY PROPERTY UNE. PLEASE NOTE THAT COMPLIANCE WITH THIS SECTION WILL BE VERIFIED AT THE 71ME OF BUILDING PERMfT AND CERTIFICATE OF OCCUPANCY. PARKING AWLYM ' Ut'll,." DEMAND 'I �QUIRED PARKING MINIMUM EMANb DER' 8UI ENG 0 GPM 2 13EDROCIa UNITS - 16 UNITS - 32 BEDROOMSAVERAGE 20 GPM 1.5 SPACES/BEDROOM - 48 SPACES MAXIMUM (PEAK) 80 GPM ir AEDROOM UNITS � s NITS - B BEDROOMS 2" DOMESTIC WATER METER SP fBEDROOid -56 25% REDUCTION = 14 SPACES TOTAL REQUIRED - 42 SPACES `L HANDICAP SPACES REQUIRED PROPOSED PARKING: 42 SPACES 2 HANDICAP SPACES 42 BIKE SPACES 44 SPACES TOTAL SANITARY SEiM1I 11DAAW AVERAGE 25 GPM MAXIMUM (PEAK) 100 GPM 6" SANITARY SEWER UNE ® 1.50% MIN. SLOPE FIXTURE UNITS = 380 FIXTURE UNITS ALLOWED = 700 PiPE SLOPE OK FOSTER AVENGE APARTMENTS 10 5 0 1'10 1024 AND 1026 FOSTER AVE. sCALE IN FEET LO -M g AND 10, BLOCK 3 TOTAL AREA = 0.74 ACRES 1 BULDING 27,806 SF 24 UNITS / ACRE I� IIr� COLLEGE HTS EeFrA` M VOLUME 90, PO 468 PROJ_EGT BENCN MAkK COLLEGE STA710N1. 8vzw COUNly, TEXAS SCALE: 1"=10' AUGUST 2012 RAIILLROAD SPIKE IN OWNER/DEVELOPER: SURVEYOR: TELEPHONE POLE CC 8CS 1 LP KERR SURVEYING, LLC. ELEVATION: 313.36' C/O CUNT COOPER 409 N. TEXAS AVE. 170 R H PAR " BRYAN, 7 X 7'7'803 �.. LTTE 2 F �:; '. 979-268-3195 CO LE r F �iLON, )M 77845 -X60- 000 ENGINEER: SCHLlLTZ ENGINEERING, U.C. Vi PO BOX 11995 COLLEGE STAVON. TX 77842 (979)764-3900 SHEET 10 F 2 SCALE VERTICAL NLA HORIZONTAL 1e=19 PLOTTING SCALE: PILE NAME: 12-210 SHEET [7, (' ........_... . ............. to J ED / ca EXISTING MH #2 RIM=314.45 REVIEWED FOF uOMPL MN NOv 2 8 2012 ��V 4.;ah�s�R4�11� I'•I �.s�.�.d 1 4° �^�i PLA SITE SPECIFIC Hg= - 1. THE OWNER OF THE PROPERTY IS CC BCS 1 I.P. THE SUBJECT PROPERTY IS LOTS 9 AND 1% BU OF THE FiRST INSTALLMENT OF COLLEGE HILLS ESTATES, VOL. 96 PG. 498. THE PROPERTY IS ZONE PDD WITH 96 BASE ZONING. 2. THE DISTURBED AREA FOR THIS PROJECT 1S 0.73 ACRES (31.859 SF). 3. DRAINAGE INFORMATION AND DETAILS WELL BE PROVIDED ON THE DRAINAGE PLAN AND DRAINAGE REE 4 LANDSCAPING AND i NCA710H DESIGN AND ANALYSIS WILL BE PROVIDED ON THE LANDSCAPE AND IRRIGATION PLANS. S. THE IRRIGATION SYSTEM MUST Be APPROVED AND INSTALLED PRiOR TO C.O. $' THE MINIMUM REQUIRED FIRE FLOW FOR A COMMERCIAL BUILDING IBC TYPE VA OF 27,806 SF IS 3, MONSGALLONS PER MIEIM THE BUILDING IS FULLY SPRINKLED WHiCH DECREASES THE REQUIRED FIRE F X (1,500 GPM). ONE FIRE HYDRANT is REQUIRED. THE HYDRANT FLOW WELL BE PROVIDED AN EXISTING HYDRANT AND A PROPOSED HYDRANT WHICH IS NEEDED TO SERVE THE FIRE DEPARTME CONNECTION. 7. THE SUBJECT TRACT DOES NOT LIE WITHIN THE 100 YEAR FLOODPLAIN ACCORDING 'T'0 FEMA F LOOO INSURANCE RATE MAPS FOR BRAZOS COUNTY, MM AND INCORPORATED AREAS. COMMUNITY NO. 480083, PANEL NO. 30SE MAP NO. 48"IC0305E. EFFECTIVE DATE. MAY. 16. 2012. 8. ALL RADII AND DISTANCES ARE MEASURED TO THE BACK OF CURB UNLESS OTHERWISE NOTED. 9. ALL PAVEMENT SHALL BE C N1CRETE. REFER TO THE PAVEMENT PLAN FOR PAVEMENT DEPTHS: 10. ALL. UTILITY LINES WATER. GAS, SANITARY SEWR. VERIZON. STORM SENDER, ETC.) SHOWN AIB= TAKE FROM BEST AV RECORD INFORMA71ON BASED ON CONSTRUCTION UTTUTY MAP DOCUMENTS OBTAINED BY FROM CITY AND INDEPENDENT AGENCIES AND/OR ABOVE GROUND FIELD EVIDENCE. SI POSITIONS MAY NOT REPRESENT AS-BULT CONDITIONSi, 11. BUILDING SETBACK LINES SHALL BE IN ACCORDANCE WITH THE CITY OF COLLEGE STATION umFlE o DEVELOPMENT ORDINANCE AND APPROVED PDD ZONING. 12. � SO AS --NOT 70 $ IN7ED MECHANICAL VISIBLE FROM ANY PUBLICRIGHT-OF-WAY OR RESIDBE SCREEMED ENTiAL DISTRICT W 1-W OF BE COORDINA' ED WITH THE BUILDING ARCHITECTRED FROM A URE AND SCALE TFEET OVE GRADE. ED MAINTAIN A UNIFI CH SCREENING EARAN( 13. PROPOSED SIGNS SHALL BE PERMITTED SEPARATELY IN ACCORDANCE WITH THE LIDO AND PDD ZONIc 14. ALT. >LECTwx IMPROVEMENT$ $HALL BE PER comm STATION UTILITIES SPECIFICATIONS AND PER COLLEGE STATION UTILITIES, EIECTRTCAL DESIGN FOR THIS PROJECT. CSU ELECTRICAL CONTACT: CSU ELECTRIC PROJECT COORDINATOR CITY OF COLLEGE STATION UTILITIES PH: 979-704-W14 15. THE FIRE SUPPRESSION UNE SHALL HAVE A LOCKABLE UD ON THE ISOLATION VALVE, THE LOCKABLE SHALL SUPPLY THE SAME PROTECTION AS THE AMP OR USA, LL562 LOCKING UD AT MINIMUM. AN ALTERNATE LOCKABLE LID SHALL BE APPROVED By COLLEGE STATION UTILITIES OR HES DESIGNEE 16. TRAFFIC IMPACT ANALYSIS IS NOT REQUIRED. 17. COVERED PARTING S LOCATED WITHIN THE BUILDING SETBACK. THE PDD ZONING WELL BE AMENDED I ALLOW THE COVERED PARKING iN THE BUILDING SETBACK, 18. THE GATE TO FRANCIS DRIVE IS FOR FIRE DEPARTMENT EMERGENCY ACCESS USE ONLY. IN THE EVEN THE GATE IS LEFT OPEN, THE CITY OF COLLEGE STATION RETAINS THE ABILITY 70 CLOSE THE GATE WITHOUT CONSULTING THE PROPERTY OWNER. 19. FOSTER AVENUE APARTMENTS. COLLEGE HILLS ESTATES BLOCK 3 LOTS 9-10. IS TO BE CONSIDERED BUILDING PLOT FOR THE PURPOSE OF SIGNAGE AND LANDSCAPING. 20. ACCESS SHALL BE PROVIDED AT ALL TIMES FOR POLICE; FIRE. CITY INSPECiTCN% MAiL DET.TVERY, GARBAGE PICK -LIP. DUAL -A -RIDES. UTILITY. SCHOOL BUSES. AND 07HER HEALTH AND SAFETY -RELATE! VEHICLES. ACCESS MUST NOT REQUIRE DRIVERS TO EXIT THEiR VEHICLE 21. A KNOX BOX WILL BE REQUIRED FOR THE GATE ON FOSTER AND NEAR THE rdSER ROOM PER FIRE DEPARTMENT REQUIREMENTS. 22. A KNOX PADLOCK WILL. BE INSTALLED ON AAE ACCESS GATE ON FI7ANCI5, 23. THE DETENTION AND DRAINAGE FACIUTTES MUST BE CONSTRUCTER) FIRST. GENERAL NOTES: I- THE CONTRACTOR SHALL 13E RESPONSIBLE FOR VERIFYING THE EXACT LOCATION OF ALL EXISTING UNDERGROUND UTIUTTES. NOTIFICATION OF THE UTILITY COMPANIES 48 HOURS IN ADVANCE OF CONSTRUCTION IS REQUIRED. DIG TEES: (800) 344-8377 ATMOS ENERGY: (979 774-2506 SUDDEN LINK COMMUNICATIONS: (979 995-2429 VERIZON: (979) 821-4770 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO USE WHATEVER MEANS NECESSARY TO MINIMIZE EROSION AND PREVENT SEDIMENT FROM LEAVING THE PROJECT SITE THIS INCLUDES THE INSTALiA71 N OF A CONSTRUCTION EXIT AND SILT FENCE AS NECESSARY. 3. THE CONTRACTOR IS RESPONSIBLE FOR OLVE3CTING AND MAINTAINING THE EROSION AND SEDIMENT CONTROL DEVICES. INSPECTIONS SHAM BE HONE EVERY 14 DAYS AND AFTER EVERY RAINFALL EVEW OF 1/2" OR MORE THE CONTRACTOR SHALL REMOVE ALL MUD DEPOSITED ON THE ADJACENT STREETS AS A RESULT OF THE CONSTRUCTION OF THIS PROJECT: 4. THE CONTRACTOR IS REQUIRED 70 MAINTAIN THE 7PDES GENERAL PERMIT NO. rAR 150000 REQUIREMENTS FOR CONSTRUCTION STIES. 5. PERMANENT VEGETATION WILL BE ESTABLISHED ON THE DISTURBED AREAS AFTER CONSTRUCTION LS ' COMPLETE BY HYDROMULCHING AND SEEDING ALL DISTURBED AREAS. S. ALJ. CONSTRUCTION SHALL BE iN ACCORDANCE WITH THE 2012 CITY OF BRYAN/COLLEE STATION STANDARD SPECIRCA71ONS AND DETAILS FOR WA7M ALL CONSTRUCTION SHALL BE CXX>itDiNATt;D WITH THE CITY ENGINEER'S OFFICE 7. THE CONSTRUCTION SHALL COMPLY WITH OSHA STANDARD 29 CSR PART 1926 SUBPART P FOR liiEfV SAFETY REOUIREMS T5, 8. THE CONTRACTOR SHALL REMOVE THE EROSION CDNMOL MEASURES ONCE GRASS IS ESTABLISHED. 9. INLET PROTECTION 70 BE INSTALLED AT ALL. PROPOSED AND EXISTING INLET'S ADJACENT' TO THE PROJECT SITE 10. CONTOURS SHOWN ARE FROM FIELD SURVEY DATA PREPARED BY KERR SURVEYING, LLC. I 11. D(TERIOR BUILDING AND SiTE UG TING WILL MEET THE STANDARDS OF SECTION 7.10 OF THE UNIFIED NO FIXTUDEVELORMENT ORDINANCEE RE SHAD. DTREMYiPROJECT- LIGHT HORIZE UGHT SOURCE �ON3NALLY: FIXTURES WILL Be MOUNTED N SUCH OT PROJECT BELOW A14 OPAQUE HOUSING A MANNER THAT THE PROJECTED CONE OF LIGHT DOTS NOT CROSS ANY PROPERTY UNE. PLEASE NOTE THAT COMPLIANCE WITH THIS SECTION WILL BE VERIFIED AT THE 71ME OF BUILDING PERMfT AND CERTIFICATE OF OCCUPANCY. PARKING AWLYM ' Ut'll,." DEMAND 'I �QUIRED PARKING MINIMUM EMANb DER' 8UI ENG 0 GPM 2 13EDROCIa UNITS - 16 UNITS - 32 BEDROOMSAVERAGE 20 GPM 1.5 SPACES/BEDROOM - 48 SPACES MAXIMUM (PEAK) 80 GPM ir AEDROOM UNITS � s NITS - B BEDROOMS 2" DOMESTIC WATER METER SP fBEDROOid -56 25% REDUCTION = 14 SPACES TOTAL REQUIRED - 42 SPACES `L HANDICAP SPACES REQUIRED PROPOSED PARKING: 42 SPACES 2 HANDICAP SPACES 42 BIKE SPACES 44 SPACES TOTAL SANITARY SEiM1I 11DAAW AVERAGE 25 GPM MAXIMUM (PEAK) 100 GPM 6" SANITARY SEWER UNE ® 1.50% MIN. SLOPE FIXTURE UNITS = 380 FIXTURE UNITS ALLOWED = 700 PiPE SLOPE OK FOSTER AVENGE APARTMENTS 10 5 0 1'10 1024 AND 1026 FOSTER AVE. sCALE IN FEET LO -M g AND 10, BLOCK 3 TOTAL AREA = 0.74 ACRES 1 BULDING 27,806 SF 24 UNITS / ACRE I� IIr� COLLEGE HTS EeFrA` M VOLUME 90, PO 468 PROJ_EGT BENCN MAkK COLLEGE STA710N1. 8vzw COUNly, TEXAS SCALE: 1"=10' AUGUST 2012 RAIILLROAD SPIKE IN OWNER/DEVELOPER: SURVEYOR: TELEPHONE POLE CC 8CS 1 LP KERR SURVEYING, LLC. ELEVATION: 313.36' C/O CUNT COOPER 409 N. TEXAS AVE. 170 R H PAR " BRYAN, 7 X 7'7'803 �.. LTTE 2 F �:; '. 979-268-3195 CO LE r F �iLON, )M 77845 -X60- 000 ENGINEER: SCHLlLTZ ENGINEERING, U.C. Vi PO BOX 11995 COLLEGE STAVON. TX 77842 (979)764-3900 SHEET 10 F 2 SCALE VERTICAL NLA HORIZONTAL 1e=19 PLOTTING SCALE: PILE NAME: 12-210 SHEET 10. " DEBMTED PAFXM C*Ly NOTES!, 1. SIGN SHALL COMPLY WITH THE CoM FIRE SERVICE STANDARDS. FIRE LANE SIGN DETAIL N.T.S. EIRE LANE MARKINGS 1. ALL CURBS AND CURB ENDS SHALL BE PAINTED RED WITH FOUR INCH (4') WHITE LEI ING STATING "FIRE LANE - NO PARKING - TOW AWAY Z0N!'. WORDING MAY NOT BE SPACED MORE THAN FIFTEEN FEET APART. 2. A SIGN TWELVE INCHES (12') WIDE AND EIGHTEEN INCHES_ (18' IN HEIGHT SHALL E MOUNTED IN A CONSPICUOUS LOCAMON AT EACH ENTRANCE TO THE PROPERTY AND AT THE LOCATIONS SHOWN. SUCH SIGNS SHALL BE TWELVE INCHES (12-) WIDE AND EIGHTEEN INCHES HIGH, WITH A COMPANION SIGN TWELVE INCHES (12') WIDE AND SIX INCHES (6-) HIGH STATING 'TOW -AWAY ZONE". SUCH SIGNS SHAD. BE PAINTED ON A WHITE BACKGROUND WITH SYMBOLS, LETTER AND BORDER. IN ED. *CROSS SLOPE NOT TO EXCEED 27. OR BE LESS THAN 1% ON ANY TO OF RAMP OR TRANSITION P� 0 J� PR I&ERTM-7 L I SIDEWALK 1:12 T' SLOPE MAN EXPANSION JT. & BACK SMOOTH DOWEL BAR, OF CURB 1/2" DIA. X 16". WITH 6' MIN. CAP 0 12" O.C.. COATED W/HEAVY 8' SIDEWMX AMBULATORY R"PSP AT STREET INTERSECTION SECTION & DRIVES SW3-03 RESERVED2'x18" REFLECTIVE MISH METAL SIGN PARKING Vi 1-� STEEL REINFORCING BARS {, CONCRETE PAVEME�i T •. '.a' + �,. c 4'. �. •• � ;M,0." •�1.i �.. •! . ' '-v"' • • • • 'ip"�' -C^0.' ?":' �.e �1�' �. j� ""v. X 3" 12"x9' REFLELIM FINISH METAL SIGN _. 'a " • M 6" LIME +STABILIZED SUBGRADE (EXTENDS 1' OUTSIDE THE EDGE OF PAVEMENT) 2x2 GALVANIZED STEEL TUBE COLUMN * X=5" OR 6" AS SHOWN ON THE PAVEMENT PLAN SET IN CONCRETE FOOTING. PROVIDE * 6" PAVEMENT - USE #4 REBAR 0 18" O.C.E.W. OVTUBTTEAT TPOFEPANT TUBE AD W. * 5" PAVEMENT -- USE ,#3 REBAR ® 15" O.C.E.W. ! L TYPICAL CONCRETE PAVING SECTION Ii i j ! ! jf N:T•S. !NOTESea 3` N. L 3J 1. ALL CHARACTERS MUST BE 60" MINIMUM ABOVE GRADE OR SIDEWALK. ADA SIGN DETAIL CROSS SLOPE 2% MIN. CROSS SLOPE CROSS SLOPE SIDEWALK z 2% to 4% 296 MAX.. 1% MIN. a CA ENT CURB , n "�� l } A Ii 4 A 8' TYP. o NOTE: THIS DOES NOT TAKE INTO ACCOUNT DRAINAGE REQUIREMENTS - BERMS MAY BE REQUIRED OUTSIDE OF THE SIDEWALK. t CROSSWALK DIMENSIONS, **VARIES 4' CROSSWALK MARKINGS, AND STOP LINE LOCATIONS SHALL BE AS SHOWN ELSEWHERE IN THE PLANS. 8' �'•.♦ SIDEWALK PROPERTY UNE • 4' ivTA1C •• I0t23' (16' CURB RADIUS) w 21.5' (20 CURB RADIUS) 16.5' 25' CURB RADIUS) *-CROSS SLOPE NOT TO EXCEED 2X% X OR BE LESS THAN 12 ON ANY a• :. PORTION OF RAMP OR IRANS17ION TO STREET 8' SIDEWALK AMBULATORY RAMP AT STREET EVIEMECTION SW3-01 f PER TAS STANDARDS SIDEWALK SLOPE REQUIREMENTS SWI -0o 0 #4 BARS NOIL, ALL CURBS 6" IN HEIGHT UNLESS NOTED OTHERWISE. f� = 3/4" x 1 B' sMOOTH TYPICAL CURB DI' TAIL, EXPANSION DOWELS NT.S. NOTE TYPE "G" EXPANSION JOINTS IN CURB & GUTTER SHALL E SPACED AT A MAXIMUM DISTANCE OF 4d' APART AND AT ALL RADIUS POINTS, P.T.'S AND P.C.-S. TYPE V CONTRACTION JOINTS IN CURB. do GUTTER SHALL. BE SPACED AT A MAXIMUM DISTANCE OF 10' MART. 4 ACR WIR T 1d 3 Q d 4 4 Q Q 4 _ 04 GARS CONTINUOUS AND 3' CLEAR TYP. 28 DAY CONCRETE STRENGTH = 35013 PSI 24° LA'Y DOWN CURB DETAIL NTS. APPEARNG ON THIS SHEET THE SEAL .v ;l BY �: E � 11 1 V V' �� 1 1 .. JOSEPH P. DOCUMENT W ULTZ' P.E., LICENSE - NO. 65889 ON OCTOBER 4. 2012. 2730 Longmire, Suite A College Station, Texas 77845 ISSUED FOR CONSTRUCTION 979.764.3900 TBPE NO. 12327 SURVEYED DESIGNED DRAWN APPROVED JOB NO. DATE KERR JPS DLD JPS 12-210 OCTOBER 2012 FIRM # 12327 SCHULTZ ENGINEERING, LLC FOSTER AVENUE APARTMENTS 1024 8� 1026 FOSTER AVE. COLLEGE HII,LS ESTATES LOTS 9 & 10, BLOCK 3 -COLLEGE STATION, TX I � I- 1 108' J 6" AT EACH END 6' [=W MIHI. 6" [=30' MIN. 6" 5'-*`t�36 •► BIKE RACK DETAIL N.T.S. NOTES: 1. SIDEWALK PLACEMENT SHALL BE IN ACCORDANCE WITH B/CS UNIFIED DESIGN GUIDELINES. 2. FINISH: LIGHT BROOM FINISH. JOINTS TO BE TOOLED 1" DEEP AT AN INTERVAL EQUAL TO THE SIDEWALK WIDTH. EXPANSION JOINTS ® 4O' O.C.,CONTRACTION JOINTS 04V O.C. 3. DOWEL IN AND TIE TO ANY CONCRETE S CTURE ADJACENT TO SIDEWALK (DRIVEWAY, INLET BOX. CURB. JUNCTION BOX, ETC.) WITH #3 x 12" BARS 0 12" D.C. OR #4 x 2" BARS 0 18" O.C. 4. COMPACTION: COMPACTED SUOGRADE M RIAL COMPACTED TO A DENSITY AT LEAST 98% OF MAXIMUM DRY DENSITY AS DETERMINED BY PROCTOR COMPACTION T ASTM D698 (STANDARD) AND SHALL BE 0-4% WET OF THE OPTIMUM MOISTURE CONTENT 5. A MINIMUM CLEAR PEDESTRIAN WIDTH AS REFINED BY TAS AND ADA SHALL BE PROVIDED FOR ENTIRE LENGTH OF SIDEWALK. SEAL WITH EXPANSION JOINT MATERIAL SMOOTH DOWEL BAR 1/4" R 1/2" la X 18". 12" O.C. 3/4" (COATED W/HEAVY GREASE) _ -8!-0. VARIES •� 2% MAX. RECYCLED MATERIAL. 1/2" SEE NATE 4 THICK AS MANUFACTURED BY J.D. RUSSELL. CO. OR 3" LONA METAL OR PLASTIC CAP, INSIDE APPROVED EQUAL DIAMETER TO BE 1'/,16" GREATER -THAN DIAMETER OF DOWEL BAR. CAP MUST3 BARS 12" O.C.E.W. OR 28 -DAY CONCRETE BE LONG ENOUGH TO COVER 2"017 #4 BARS 0 18" O.C.E.W. STRENGTH = 30130 psi DOWEL AND HAVE STOP SO END OF CAP IS 1° FROM END OF BAR. SEE FINISH NOTE I SIDEWALK MANSIO TYPICAL 8' SIDEWALK DE'T'AIL & CONSTRUCTION JOINT SAWED OR FORMED, 1/8" TO 3/16"SEAL WITH E ANSION JOINT MATERI MIN. 3/8" R_ SIDEWALK CONTRACTION JOINT VARIES INTO ALL St in TS SEE PLAN COC SIDEWALK r .v� .w 4" 7.5" GENERAL NOTES DETECTABLE DETECTABLE WARNIN S WARNING SURFACE PEDESTRIAN FACILITIES 1. CURB RAMPS MUST CONTAIN A DETECTABLE WARNING SURFACE THAT GENERAL NOTES I" MAX. SAND CONSISTS OF RAISED TRUNCATED DOMES COMPLYING WITH SECTION PT�$E IMA A 1Mr1wv 4.29 OF THE TEXAS ACCESSIBILITY STANDARDS (TAS). THE 1. ALL SLOPES ARE MAXIMUM AA O�WABLE� TH£ LEAST POSSIBLE SLOPE THAT WILL 4 Q ir� LANDING SURFACE MUST CONTRAST VISUALLY WITH ADJOINING 'SURFACES, STILL. DRAIN PROPERLY SHOULD BE USED. ADJUST CURB RAMP LENGTH OR GRADE -�} a IK otOA INCLUDING SIDE FLARES. FURNISH DARK BROWN OR PARK RED OF APPROACH SIDEWALKS AS DIRECTED. DETECTABLE WARNING SURFACE ADJACENT TO UNCOLORED 'THE .0MAX. o aoNp USUpL PLANS.p CONCRETE, UNLESS SPECIFIED ELSEWHERE IN 2. LANDINGS SHALE. BE A 5' X 5' MINIMUM WITH A MAXIMUM 2% SLOPE IN ANY j000a000 00000002. N /6000000 DETECTABLE WARNING SURFACES MUST BE SUP RESISTANT ANOg DIRECTION. o o o 0 0 o o NOT ALLOW WATER TO ACCUMULATE 3. MANEUVERING SPACE AT THE BOTTOM OF CURB RAMPS SHALL BE A MINIMUM OF 3. ALIGN TRUNCATED DOMES IN THE DIRECTION OF PEDESTRIAN 4' X 4' WHOLLY CONTAINED WITHIN THE CROSSWALK AND WHOLLY OUTSIDE TRAVEL WHEN ENTERING THE STREET. THE PARALLEL VEHICULAR TRAVEL PATH. 6" MIN. FACE OF 10" MAX. CURB 4. SHADED AREAS ON SHEETS 3 AND 4 INDICATE THE 4. MAXIMUM ALLOWABLE CROSS SLOPE ON SIDEWALK AND CURB RAMP IS 27. APPROXIMATE LOCATION FOR THE DETECABLE WARNING TYPICAL PLACEMENT OF DIi:TECTABLE W1?►RNING SURFACE FOR EACH CURB RAMP TYPE. S. CURB RAMPS WITH RETURNED CURBS MAY BE USED ONLY WHERE PEDESTRIANS 5. DETECTABLE WARNING SURFACES SHALL BE A MINIMUM OF 24' 1N DEPTH IN THE DIRECTION OF PEDESTRIAN TRAVEL, AND EXTEND THE WOULD NOT NORMALLY WALK ACROSS THE RAMP, EITHER BECAUSE THE ADJACENT SURFACE IS PLANTING OR OTHER NON -WALKING SURFACE OR BECAUSE THE SIDE SURFACE ON LANDING AT STP= EDGE FULL WIDTH OF THE CURB RAMP OR LANDING WHERE THE APPROACH IS SUBSTANTIALLY OBSTRUCTED. OTHERWISE, PROVIDE FLARED SIDES. SW2 OO PEDESTRIAN ACCESS ROUTE ENTERS THE STREET. 6. ADDITIONAL INFORMATION ON CURB RAMP LOCATION, DESIGN. LIGHT RELECTIVE VALUE 6. DETECTABLE WARNING SURFACES SHALL BE LOCATED SO THAT THE EDGE NEAREST THE CURB UNE IS A MINIMUM OF 6" AND A AND TEXTURE MAY BE FOUND IN THE CURRENT EDITION OF THE TEXAS ACCESSISIUTY STANDARDS (TAS) AND 16 TAC 968.102. MAXIMUM OF 10" FROM THE EXTENSION OF THE FACE OF CURB. DETECTABLE WARNING SURFACES MAY BE CURVED ALONG THE 7. TO SERVE AS A PEDESTRIAN REFUGE AREA. THE MEDIAN SHOULD BE A MINIMUM o CORNER RADIUS. OF 5' WIDE. MEDIANS SHOULD BE DESIGNED TO PROVIDE ACCESSIBLE PASSAGE �- oILnding OVER OR THROUGH THEM. 7. ACCEPTABLE PAVER MATERIAL SHALL BE CLAY, VITRIFIED @'e E POLYMER COMPOSITE. PRECAST POLYMER CONCRETE, 8, CROSSWALK DIMENSIONS, CROSSWALK MARKINGS AND STOP BAR LOCATIONS SHAH BE Detectable warning surface . AND CONCRETE. AS SHOWN ELSEWHERE IN THE PLANS. AT INTERSECTIONS WHERE CROSSWALK (Domes to run parallel to MARKINGS ARE NOT REQUIRED. CURB RAMPS SHALL BE ALIGNED WITH THEORETICAL pedestrian travel) CROSSWALKS, OR AS DIRECTED BY THE ENGINEER. 4" Max _ and Usual 9. EXISTING FEATURES THAT COMPLY WITH TAS MAY REMAIN IN PLACE UNLESS 0160.16-0 a 0 0 0 OTHERWISE SHOWN ON THE PLANS. 00oo0ooeo1de flare E 160 0000000 0 0 0 0 00 00 (Typical) 10. HANDRAILS ARE NOT REQUIRED ON CURB RAMPS. PROVIDE CURB RAMPS WHEREVER N 000000000 ON ACCESSIBLE ROUTE CROSSES (PENETRATES) A CURB. 11. SEPARATE CURB RAMP AND LANDINGS FROM ADJACENT SIDEWALK AND ANY OTHER ELEMENTS WITH PREMOLD OR BOARD JOINT OF 3/4" UNLESS OTHERWISE DIRECTED 6" min Face of BY THE ENGINEER. 10 max �,b 'TYPICAL PLACEMENT OF DETECTABLE - 12. PROVIDE A SMOOTH TRANSITION WHERE THE CURB RAMPS CONNECT TO THE STREET. WARNING SURFACE ON SLOPING RAMP RUN 13. FLARE SLOPE SHALL NOT EXCEED 10% MEASURED ALONG CURB LINE. SW2-OI GENERAL NOTES (PAVERS) 1- 2- FURNISH WARNG�Lr G ALL EQUIREMENTSCTABLE OF ASTM C - 936P C--33 AVER �NITS LAY IN A NTW0 Y TWO UNIT BASKET WEAVE PATTERN OR AS DIRECTED. ZY` j LAY FULL-SIZE UNITS FIRST FOLLOWED BY ' c � LAND NG - -+- CLOSURE UNITS c CONSISTING OF AT LEAST 25 PERCENT OF A FULL UNIT CUT c DETECTABLE WARNING PAVER UNITS USING A POWER SAW. 7-0-0-0-3-1 u �Landing mom a» 0 � 4 0 0 0 O 3 REBAR AROUND PAVER INSET M electable warningNO. ^i paver with truncaed DETECTABLE WARNING PAVER WITH dome surface CL 4" Max EXPANSION JOINT TRUNCATED DOME SURFACE D=CTABLE WA"bVGPAVER and Usual AS REQUIRED 1" MORTAR BED - SHALL. CONFORM TO A A SIDE FLARE APPUCA13LE SPECIFICATIONS N 1 0 SLOPE N Typtcck{e (�') CONTROL JOINT PERMISSIBLE AX (TYPICAL) Face of 1__7(Tr_YP6ICAL) Face of curbMiN. 4" 4' RAMP WIDTH (TYPICAL) �� 7r,WL'ADOMEPA7'1'FAW No. 3 REBAR AT -TYPICAL) 18" (MAX.) ON -CENTER 7� L SS A CONCRETE CURB AA" BOTH WAYS CLASS BL ERSTE - SHALL CONFORM TYPICAL AMBULATORY RAMP W/ TO FLARED WINGS DETECTABLE WARNING PAVER SMYONA-A W2-02 Fs --W-2-031 APPEARNG ON THIS SHEET THE SEAL .v ;l BY �: E � 11 1 V V' �� 1 1 .. JOSEPH P. DOCUMENT W ULTZ' P.E., LICENSE - NO. 65889 ON OCTOBER 4. 2012. 2730 Longmire, Suite A College Station, Texas 77845 ISSUED FOR CONSTRUCTION 979.764.3900 TBPE NO. 12327 SURVEYED DESIGNED DRAWN APPROVED JOB NO. DATE KERR JPS DLD JPS 12-210 OCTOBER 2012 FIRM # 12327 SCHULTZ ENGINEERING, LLC FOSTER AVENUE APARTMENTS 1024 8� 1026 FOSTER AVE. COLLEGE HII,LS ESTATES LOTS 9 & 10, BLOCK 3 -COLLEGE STATION, TX I � I- 1 108' J 6" AT EACH END 6' [=W MIHI. 6" [=30' MIN. 6" 5'-*`t�36 •► BIKE RACK DETAIL N.T.S. NOTES: 1. SIDEWALK PLACEMENT SHALL BE IN ACCORDANCE WITH B/CS UNIFIED DESIGN GUIDELINES. 2. FINISH: LIGHT BROOM FINISH. JOINTS TO BE TOOLED 1" DEEP AT AN INTERVAL EQUAL TO THE SIDEWALK WIDTH. EXPANSION JOINTS ® 4O' O.C.,CONTRACTION JOINTS 04V O.C. 3. DOWEL IN AND TIE TO ANY CONCRETE S CTURE ADJACENT TO SIDEWALK (DRIVEWAY, INLET BOX. CURB. JUNCTION BOX, ETC.) WITH #3 x 12" BARS 0 12" D.C. OR #4 x 2" BARS 0 18" O.C. 4. COMPACTION: COMPACTED SUOGRADE M RIAL COMPACTED TO A DENSITY AT LEAST 98% OF MAXIMUM DRY DENSITY AS DETERMINED BY PROCTOR COMPACTION T ASTM D698 (STANDARD) AND SHALL BE 0-4% WET OF THE OPTIMUM MOISTURE CONTENT 5. A MINIMUM CLEAR PEDESTRIAN WIDTH AS REFINED BY TAS AND ADA SHALL BE PROVIDED FOR ENTIRE LENGTH OF SIDEWALK. SEAL WITH EXPANSION JOINT MATERIAL SMOOTH DOWEL BAR 1/4" R 1/2" la X 18". 12" O.C. 3/4" (COATED W/HEAVY GREASE) _ -8!-0. VARIES •� 2% MAX. RECYCLED MATERIAL. 1/2" SEE NATE 4 THICK AS MANUFACTURED BY J.D. RUSSELL. CO. OR 3" LONA METAL OR PLASTIC CAP, INSIDE APPROVED EQUAL DIAMETER TO BE 1'/,16" GREATER -THAN DIAMETER OF DOWEL BAR. CAP MUST3 BARS 12" O.C.E.W. OR 28 -DAY CONCRETE BE LONG ENOUGH TO COVER 2"017 #4 BARS 0 18" O.C.E.W. STRENGTH = 30130 psi DOWEL AND HAVE STOP SO END OF CAP IS 1° FROM END OF BAR. SEE FINISH NOTE I SIDEWALK MANSIO TYPICAL 8' SIDEWALK DE'T'AIL & CONSTRUCTION JOINT SAWED OR FORMED, 1/8" TO 3/16"SEAL WITH E ANSION JOINT MATERI MIN. 3/8" R_ SIDEWALK CONTRACTION JOINT VARIES INTO ALL St in TS SEE PLAN COC SIDEWALK r .v� .w 4" 7.5" CONCRETE SIDEWAI MAX. '. SEE NO 4 SEE NOTE 3 -A 28 -DAY CON RE #4 BARS 0 18" O.C.E.W. STRENGTH - 3 O 6" UME STABILIZED SUBGRADE (6" THICK �N. SEE FINISH I � i FIRE RATED SIDEWAII 16 ' VIEWS a A� JO y I. _ j NOV _ � 2X12 1 � Q@@??����@p�Lp�1�-+i��--4yyggl�r)`+', SITE PLAN s1IMET 2 OF z REVi FOR CON-1 rm L:1,ACE NOV 2, 8 2012 COLLEGLSTATION ENGINEERING FOSTER AVENUE APARTMENTS 1024 AND 1026 FOSTER AVE. LOTS 9 AND 10, BLOCK 3 TOTAL AREA - 074 ACES 1 BUILDING 27,806 Sf= 24 UNITS / ACME FW Wry' COLLEGE HRLS E3fAIM VOUAE 9% M 40 COUMN STA't M BIRAM COUNTY, 7EXA8 SCALE: 1"=10' AUGUST 2012 OWNER/DEVELOPER: SURVEYOR: CC BCS 1 LP KERR SURVEYING, LLC. 0/0 CUNT COOPER 409 N. TEXAS AVE. 1700 RESEARCH PARKWAY BRYAN, 'TX 77803 SUITE 246 979-268-3195 COLLEGE Tx 77845 ENGINEER: SCHULTZ ENGINEERING. LLC. PO BOX 11995 COLLEGE STATION, TX 77842 (979)764-3900 SCALE VERTICAL N/A HORIZONTAL NIA PLOTTING SCALE: 1.1 FILE NAME: 12-210 o s 6" I" MAX. SAND LAYING COURSE PT�$E IMA A LL SIDEWALK PAVERS CTION (FERE LANE RAITI CONCRETE SIDEWAI MAX. '. SEE NO 4 SEE NOTE 3 -A 28 -DAY CON RE #4 BARS 0 18" O.C.E.W. STRENGTH - 3 O 6" UME STABILIZED SUBGRADE (6" THICK �N. SEE FINISH I � i FIRE RATED SIDEWAII 16 ' VIEWS a A� JO y I. _ j NOV _ � 2X12 1 � Q@@??����@p�Lp�1�-+i��--4yyggl�r)`+', SITE PLAN s1IMET 2 OF z REVi FOR CON-1 rm L:1,ACE NOV 2, 8 2012 COLLEGLSTATION ENGINEERING FOSTER AVENUE APARTMENTS 1024 AND 1026 FOSTER AVE. LOTS 9 AND 10, BLOCK 3 TOTAL AREA - 074 ACES 1 BUILDING 27,806 Sf= 24 UNITS / ACME FW Wry' COLLEGE HRLS E3fAIM VOUAE 9% M 40 COUMN STA't M BIRAM COUNTY, 7EXA8 SCALE: 1"=10' AUGUST 2012 OWNER/DEVELOPER: SURVEYOR: CC BCS 1 LP KERR SURVEYING, LLC. 0/0 CUNT COOPER 409 N. TEXAS AVE. 1700 RESEARCH PARKWAY BRYAN, 'TX 77803 SUITE 246 979-268-3195 COLLEGE Tx 77845 ENGINEER: SCHULTZ ENGINEERING. LLC. PO BOX 11995 COLLEGE STATION, TX 77842 (979)764-3900 SCALE VERTICAL N/A HORIZONTAL NIA PLOTTING SCALE: 1.1 FILE NAME: 12-210 SITE SPFrJE]Q NOTES.. THE OWNER WNER OF THE PROPERTY IS CC BCS 1 LP. THE SUBJECT PROPERTY IS LOTS 9 AND 10, BLOCK .3 TRANSFORMER PAD PER CSU I LEGEND OF THE FIRST INSTALLMENT OF COLLEGE HILLS ESTATES. VOL. 96 PG. 498. PLANS AND SPECIFICATIONS N/F/ ' PDD WITH R6 BASE ZONING. THE PROPERTY IS ZONED JOHN C. CULPEPPER III EXISTING CONTOUR 2. THE DISTURBED AREA FOR THIS PROJECT I PUE LOT 8 & 11-12, BLOCK 3 1> S 0-�_3 k_'RES 31 859 SF). E HILLS Z R-6 PROPOSED CONTOUR WILL 13E PROVIDED ON THE DRAINAGE PLAN AND DRAINAGE REF ORT. N47 00'461E -180.10' r 3. DRAINAGE INFORMATION AND M=R 10,18' LANDSCAPING AND IRRIGATION DESIGN AND ANALYSIS coon^aonaeeBOUNDARY IRRIGATION PLANS. pYkk. . . . . . . . . . . . WILL BE PROVIDED ON THE LANDSCAPE AND 7.5' SID FLOW DIRECTION 5. THE IRRIGATION SYSTEM MUST 13E APPROVED AND INSTALLED PRIOR To C.O. 71" > 7.5' k T --I IDE SETBACK GALLONS PER MINUTE. THE BUILDING IS FULLY SPRINKLED WHICH DECREASES THE REQUIRED .SETBACK 001 6. THE MINIMUM REQUIRED FIRE FLOW FOR A COMMERCIAL BUILDING IBC TYPE VA OF 27,80() SF IS 3 U) FIRE HYDRANT 1900 NLU FIRE FLOW PROVIDED !BY CON NG HYDRANT AND A PROPOSED HYDRANT WHICH IS NEEDED TO SERVE THE FIRE' UEPARTMENT CONNECTION. PAF KING ISLAND- -6' HIGH SANITARY SEWER MANHOLE 18' 0-j l� TYP. 182 SF SCREEN AND - 00 C_ > 4 0 0 -W-6 > 20' FENCE 192 SF ' rn 80083, PANEL NO. 30SE, MAP NO. 4804lc6305E. EFFECTIVE DATE: 0 --1 OD cf) 91 -0 INSURANCE RATE MAPS FOR 13RAZOS COUNTY TEXAS AND INCORPORATED AREAS. COMMUNITY NO. P KING ISL 50 -0 Oct -S-6- PROPOSED SANITARY SEWER LI IE 7. THE SUBJECT TRACT DOES NOT LIE WITHIN THE I DO YEAR FLOODPLAIN ACCORDING To FEMA FLOOD GATE VALVES ONE FIRE HYDRANT IS REQUIRED. THE HYDRANT FLOW WILL B k _0BY 50 X (1,500 GPM). k k k I Typ. > PROPOSED WATER LINE (n 0 MAY. 16, 2012. PARKING rn B. ALL RADII AND DISTANCES ARE MEASURED TO THE BACK OF CURB An g > M . . . . . . . - � 1, _< 7- - ST ST UNLESS OTHERWISE NOTED. ISLAND __4 PROPOSED STORM SEWER LINE 9. ALL PAVEMENT S 382 SF 4 PARKING I LAND 11 k I SHALL BE CONCRETE. REFER TO THE PAVEMENT PLAN FOR PAVEMENT DEPTHS. 182 SF L0 CONSTRUCTION EXIT 10- ALL UTILITY LINES (WATER GAS. SANITARY SEWER, VERIZON, STORM SEWER, ETC.) SHOWN ARE TAKEN 15' PUE (n . - cn - , ___e_ - , - FROM BEST AVAILABLE RECORD INFORMATION BASED > 10 9' PARKING SPACES �mmmf`IRE LANEmm /AN FIRE LANE SILT FENCE b ON CONSTRUCTION UTILITY MAP DOCUMENTS I� RE LANE­--mm--mw nRE LANFmwwmwmmmmw.WRE LAN RE LANE nRE OBTAINED BY FROM CITY AND INDEPENDENT AGENCIES AND/OR ABOVE GROUND FIELD EVIDENCE, SHOWN 2 9 PARKING SPACES SIGN %=.Oc:p INLET PROTECTION POSITIONS MAY NOT REPRESENT AS -BUILT CONDITIONS. 171 > (n 300 GAL 7 Il. BUILDING SETBACK LINES SHALL BE IN ACCORDANCE WITH THE CITY OF COLLEGE STATION UNIFIED (n U) (n z SOLID WASTE WHEEL STOP DEVELOPMENT ORDINANCE AND APPROVED PDD ZONING, CONTAINERS SLIDING GATES 12. ALL ROOF AND GROUND -MOUNTED MECHANICAL ul ACCESSIBLE ROUTE ICAL EQUIPMENT SHALL BE SCREENED FROM I I `I I 1\ - 100, (n ISOLATED SO AS NOT TO BE VISIBLE FROM ANY PUBLIC VIEW OR DECORATIVE FENCE 150' OF THE SUBJECT LOT, MEASURED RIGHT-OF-WAY OR RESIDENTIAL DISTRICT FROM A POINT 5 FEET A13OVE GRADE. WTHIN BE COORDINATED WITH SUCH SCREENING SHAL cO (n V) 23' (PER BE DETAILS) THE BUILDING ARCHITECTURE AND SCALE TO MAINTAIN A UNIFIED APPEARANCE. TYP. ELECTRIC LINE I C VAN -ACCESSIBLE SPACE \ to __AE- OVERHEAD ELE 13. PROPOSED SIGNS SHALL BE PERMITTED SEPARATELY IN ACCORDANCE WITH THE LIDO AN . ' I M 26 D PDD ZONING". FIRE LANE 14. ALL" ELECTRICAL IMPROVEMENTS SHALL BE PER COLLEGE STATION UTILITIES SPECIFICATION > COLLEGE STATION U71UTlES ELECTRICAL DESIGN FOR S AND PER THE (n U)S PROJECT. is 24' CSU ELECTRICAL CONTACT: CSU ELECTRIC PROJECT COORDINATOR Is is is is Is is is is, 10- is IS is Is is Is Is is is is Is CITY OF COLLEGE STATION UTILITIES w is ELECICAL S VI W PH: 979-764-6314 PER PLA 15. THE FIRE SUPPRESSION LINE SHALL HAVE A LOCKABLE LID ON THE ISOLAT10N VALVE, THE LOCKA13LE AND ECIFICATIONS j:� 0 0 CA E t z 5' ITI (A W 3 NY1 38 NVI 38 SHALL SUPPLY THE SAME PROTECTION AS THE AMP OR USA, LL562 LOCKING LID AT MINIMUM. AN 1 4 __4 4 , NY -1 38rro� ACCESS __O ALTERNATE LOCKABLE LID SHALL BE APPROVED BY COLLEGE STATION UTILITIES OR HIS DESIGNEE. �LID U) . . . . . .. KEYPAD 0 > 16. TRAFFIC IMPACT ANALYSIS IS NOT REQUIRED. (n F 8'\ C) V) cn 17. COVERED PARKING IS LOCATED WITHIN THE BUILDING PDD ZONING WILL 13E AMENDED T 4 --1 . ALLOW THE COVERED PARKING IN THE BUILDING SETBACK. ...... cn 10 9' PARKING SPACES SETBACK. THE V) :TANGE� HANDICAP SPACES CURVE # LENGTH FADIUS Curve Table 18. THE GATE TO FRANCIS DRIVE IS FOR FIRE DEPARTMENT EMERGENCY ACCESS USE ONLY. IN THE EVENT! THE GATE IS LEFT OPEN, THE CITY OF COLLEGE STATION RETAINS THE ABILITY To CLOS PA KI G ISLAND C ORD WITHOUT CONSULTING THE PROPERTY OWNER. 2 04� H DIRECT,0N E Ra 1Z 234 SF THE GATE In (n %Qil 1. - - . , , I N Cl 190. 1 . 4 . --i cn 4� s-4 83.33' 10.00' 1 23' k k -?ARKING ISL, �ND 55.0 S05.4V29-E 19. FOSTER AVENUE APARTMENTS, COLLEGE HILLS ESTATES BLOCK 3 LOTS 9-10. is To BE CONSIDERED ONE cn . . -Z --i ... . -_ 1095-29 3 47�4.02 BUILDING PLOT FOR THE PURPOSELANDSCAPING. TYP. 365 SF -S-4 R PROPOSE OF SIGNAGE AND Is 3 Is 20. ACCESS SHALL BE PROVIDED AT ALL TIMES FOR L DELIVERY, is GAR13AGE PICK-UP, DIAL -A -RIDES, UTILITY, SCHOOL BUSES, AND OTHER HEALTH AND SAFETY-RELATED F V) V) 6' SIDEWALK POLICE, FIRE, CITY INSPECTIONS, MAI > PROPOSED 6' V) VEHICLES. ACCESS MUST NOT REQUIRE DRIVERS TO EXIT THEIR VEHICLE. (n SIDEWALK RAM --I ­ , , ADA EXISTING SEWER 45 SIDEWALK SERVICE TO BE 21. A KNOX BOX WILL BE REQUIRED FOR THE GATE ON FOSTER • DEPARTMENT REQUIREMENTS. ER AND NEAR THE RISER ROOM PER FIRE V- - ------ .17 . 7. *'� 7 77 .. \7 ABANDONED 22. A KNOX PADLOCK WILL BE INSTALLED ON AAE ACCESS GATE ON FRANCIS. cn En . . . . . . . . . . . tl> V I (j) U) mid V . . . . . . . . . . .• 23. THE DETENTION AND DRAINAGE FACILITIES MUST BE CONSTRUCTtf) FIRST. V) Ld �? 17 t> U C) c U) cn I . I . . - . 1. � ... - - 11 . . . m 1 . . V __17 9 TBM 1 < w< _1p_• 17. -4 0- 0- co cr cn- .17 D fl� 0 < m < L0 U_ I n _j W W ILil < ry 50' X 26' �r- Ld AERIAL FIRE z I> > ACCESS (n (n ( w Uj 0 EASEMENT rn 0 - . 7 > <M > ;0 - GENERAL NOTES: 1> Z z _._ - i _: -VICINITY MAP I- THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE EXACT LOCATION OF ALL EXISTING Uj rn cn 0 UNDERGROUND UTILITIES. NOTIFICATION OF THE UTILITY COMPANIES 48 HOURS IN ADVANCE OF PROPOSED ADA SIGNAGE}II EXISTING 12" t> SEWER LINE CONSTRUCTION IS REQUIRED.,, DIG TESS: 7moi (800) 344-8377 U) ATMOS ENERGY: (979) 774-2506 cl) SUDDEN LINK COMMUNICATIONS: (979) 595-2429 VERIZON: f -lit 979) 821-4770 2. IT IS THE RESPONSIBILITY OF THE coNTRACTO D RIM=314.54 OF A CONSTRUCTION EXIT AND SILT FENCE AS EXISTING MH #1 EROSION AND PREVENT SEDIMENT FROM LEAVIR TO USE WHATEVER E. MEANS S NECESSARY To MMINIMIZEJ ' I -}II NG THE PROJECT SITTHIINCLUDES THE INS1ALLATIOlI NECESSARY. GRASS(AREA FL=302.67 3. THE CONTRACTOR IS RESPONSIBLE FOR INSPECTING AND MAINTAINING THE EROSION AND SEDIMENT FL=302.69 CONTROL DEVICES. INSPECTIONS SHALL BE DONE EVERY 14 DAYS AND AFTER EVERY RAINFALL EVEN OF 1/2' OR MORE. THE CONTRACTOR SHALL REMOVE LLJ 7. V �7 t> S, AS A RESULT OF THE CONSTRUCTION OF THIS PROJECTALL MUD DEPOSITED ON E ADJACENT STREETS E 0).y 61 4. THE REQUIREMNTS IS REQUIRED TO MAINTAIN THE TPDES GE PERMIT NO. TXR 1500oo TS FOR CONSTRUCTION SITES. A> SEWER SERVICE 5. PERMANENT VEGETATION WILL BE ESTABLISHED ON THE DISTURBED AREAS AFTER CONSTRUCTION IS WITH CLEANOUT COMPLETE By HYDROMULCHING AND SEEDING ALL DISTURBED AREAS. Vj- 'PARKING ISLAND ACCESSIBLE ROUTE 6. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE 2012 CITY OF BRYAN /COLLEGE STA11ON STANDARD SPECIFICATIONS AND DETAILS FOR WATER. ALL CONSTRUCTION SHA /C < "-DECORATIVE 201 SF• THE CITY ENGINEER'S OFFICE. LL BE COORDINATED NITI PAVEMENT 7. THE CONSTRUCTION SHALL COMPLY WITH OSHA TANDARD 29 C s FR PART -19.? -Orz­­Tp (n` ., - -QTY _6_ _SUB. Pl-,r� R 11 7 �Em 26 BIKE SI /-4 -1 8. THE CONTRACTOR SHALL REMOVE THE EROSION CONTROL MEASURES ONCE GRASS IS ESTABLISHED ------FIRE LANE RATED CD PIRDJE HE 9. INLET PROTECTION TO BE INSTALLED AT ALL PROPOSED AND EXISTING INLETS ADJACENT TO THE N CONCRETE' PAVERS LOCATION PROJECT SITE. A co < -11 f > 0 10. CONTOURS SHOWN ARE FROM FIELD SURVEY DATA PREPARED BY KERR SURVEYING, LLC, Z-4 1 M (n cy) (,() \+J I 373 -U NOT TO SCALE 11 11. EXTERIOR BUILDING AND SITE UGHTING WILL MEET THE STANDARDS OF SECTION 7.10 OF THE UNIFIED > DEVELOPMENT ORDINANCE. THE LIGHT SOURCE SHALL NOT PROJECT BELOW AN OPAQUE HOUSING AND 4* POS% > NO FIXTURE SHALL DIRECTLY PROJECT LIGHT HORIZONTALLY. FIXTURES WILL BE MOUNTED IN SUCH A T TYP. FOSTER AVE. APARTMENTS MANNER THAT THE PROJECTED CONE OF LIGHT DOES NOT CROSS ANY PROPERTY LINE. PLEASE NOTE :!E m -I--LAY DOWN I-- 1 0 1 18 UNITS 1� -1 * > - THAT COMPLIANCE WITH THIS SECTION WILL BE VERIFIED AT THE TIME OF BUILDING CERTIFICATE OF OCCUPANCY. LDING PERMIT AND Uj CURB -41 r, nn, -7 17 _U I <\ > 20' REAR\ 27,806 S.F. < PARKING ANA m G7 I SETBACKllll REQUIRED PARKING: X > m W z 2 BEDROOM UNITS - 16 UNITS - 32 BEDROOMS 10' BUILDING HEIGHT f I I I _j T s 1.5 SPACES/BEDROOM = 48 SPACES (A BUILD( G' SETBA K < 4 BEDROOM UNITS 2 UNITS - 8 BEDROOMS Z 6 35' BUILDING HEIGHT 1 SPACE/BEDROOM 8 SPACES X j TOTAL SPACES CALCULATED - 56 > :25% REDUCTION = 14 SPACES r U) El - 7 TOTAL REQUIRED = 42 SPACES W V) < _:,+/ 2 HANDICAP SPACES REQUIRED CONDENSING UNITS RISER Ld < ROOM .& SCREEN WALL Na 0 < 2: r) I PROPOSED PARKING: _j of 2 41 SPACES PROPOSED 2" cr_ < 2 HANDICAP SPACES 42 BIKE SPACES N < > WATER SERVICE C-1) 43SPACES TOTAL 7 t> r) 0 PROPOSED 4" FIRE LLJLIJ F] F1 w \7 U) SPRINKLER LINE 16 BIKE SPACES GRASS AREA > 0 0 ry 0 F1 PROPOSED THOMAS PARK 0 < z:5 b) W z 6" FDC t> 40 ry q y - V) LINE CA n FIRE LANE < OPOSED FIRE RATED GRn U) DEPARTMENT CRETE OR ASS GRASS JAPPROVED z IRKING ISLAND-\ CONNECTION AREA I Cn" 181 SP PROPOSED tr O�T SIDEWALK 10 0 10 AND 1026 FOSTER AVE, SCALE IN FEET fv- mi_ CATS U AINU IU7 K w `• I<N < L IVVr_Aj 6 -------- EXISTING ------J-, L I A TOTAL AREA 0.74 FIF w ?E cz fLAY OWN ST ST ST ST ST S HYDRANT 1 R"n rain T %ZT - L,.,. f __ of% 2 CURB CU ST ST ST •24 k 10' BUILDING 01"o ou 0 - 1-1 C) V -Uo-ud PROPOSED <1 to 00, SETBACK Ea SIDEWALK EXISTING PARKING ISLAND /),IDao 6a0 O'c 0 -0-6 2:11 r. 194 SF 00 0" 57 11'W -136.67' 7�_ ATMOS GAS I 01r))0_0 I - _w__8 lu* W --E3 W-8 ------ LINE FIRE LANE W-8 �t_.-W-8 W-8 Vd W W-81 '7 RATED 4-E Uj > V SIDEWALK A> T ST -V ST ST,6;7- STI��- -ST- ST S T s -r,,. Si* s Z�T ST ST S T --SI ST s ;ST ST ST* ST ST ST -'ST S V t> I> SWINGING PROPOSED -A �PROPOSED '-6" ISO XTION_1, VALVE EXISTING STORM SEWER PROPOSED NGING GATE -SW/ EMERGENCY LAY DOWN FIRE HYDRANT SED 2" WATER (SEPNOTE 15) FRANCIS DR. EXISTING 8" DECORATIVE PROPOSED ACCESS ONLY SIGN CURB IRRIGATION METER 60' ROW WATERLINE IRON FENCE PER ADA METER 37' B -B ASPHALT PAVEMENT ARCHITECTURAL RAMP mmmmm� DETAILS PROPOSED AUG 2 3 '1013 ADA 1.6 W-CJUT' RAMP 24 UNITS ACRE: "W WTAU-Mffir COLLEGE STATI IN MUEGE "LL8 WrAT" ENGINEERING N-8 VOLUME 9e, m 468 t�'. I PROJECT •BEN-QH MARK COUNTY, TEXAS UA*Tri =10' Ef EVATI TBM 1 AUGUST 01 WN FIC ST /ST RAILROAD SPIKE. IN � �\jv ER/DEVELOPER: SURVEYOR-' TELEPHONE POLE CC BCS I LP KERR SURVEY ELEVATION: 313.36' C/O CLINT COOPER SURVEYING LC. 409 N. TEXAS AVE. EXISTING MH 1700 RESEARCH PARKWAY BRYAN, TX 77803 #2 i C3 REQUIRE RIM=314.45 SUITE 246 979-268-3195 E3 +11' FL=302.14 COLLEGE STATION, TX 77845 M _f L_= 9 0 �q,3 3 97 6p 7000 ENGINE -S-8 S-8 FL=303.88 ER: 4.2' +31 ii # k .1 CPU" .7 0 LNUINEERING, f.LLC. PO BOX 11995 COLLEGE • Engik SSTATIONi TV 4 X THE SEAL APPEARING ON THIS 'ileering, LU; JODOCUMENT WAS AUTHORIZED BY SEPH P. SCHULTZ P.E., LICENSE 2730 Longmire, Suite A NO. 65889 ON AUGUST 21, 2013. 2ollege Station, Texas 77845 - ADD. SCREEN WALL & COCOND, UNITS JS 8/21/13 '979 764.39(.10 TBPE NO. 12327 ISSUED FOR CONSTRUCTION 1 REVISED PROJECT NAME& PARKING, JS 5/8/13 SURVEYED DESIGNED DRAWN APPROVED JOB NO. DATE MARK REVISION BY DATE KERR JPS DLD JPS 12-210 REV. AUG. 2013 (979)764-3900 THOMAS PAI�I� LOFTS SCALE 1024 & 1026 FOSTER AVE. -SIVERTICAL TO PLAN LA COLLEGE HILLS ESTATES HORIZONTAL 111=10i LOTS 9 & 10, BLOCK 3 - COLLEGE STATION, TX SHEET I OF 2 PLOTTING SCALE: FILE NAME: 12-210 < <M > ;0 - GENERAL NOTES: 1> Z z _._ - i _: -VICINITY MAP I- THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE EXACT LOCATION OF ALL EXISTING Uj rn cn 0 UNDERGROUND UTILITIES. NOTIFICATION OF THE UTILITY COMPANIES 48 HOURS IN ADVANCE OF PROPOSED ADA SIGNAGE}II EXISTING 12" t> SEWER LINE CONSTRUCTION IS REQUIRED.,, DIG TESS: 7moi (800) 344-8377 U) ATMOS ENERGY: (979) 774-2506 cl) SUDDEN LINK COMMUNICATIONS: (979) 595-2429 VERIZON: f -lit 979) 821-4770 2. IT IS THE RESPONSIBILITY OF THE coNTRACTO D RIM=314.54 OF A CONSTRUCTION EXIT AND SILT FENCE AS EXISTING MH #1 EROSION AND PREVENT SEDIMENT FROM LEAVIR TO USE WHATEVER E. MEANS S NECESSARY To MMINIMIZEJ ' I -}II NG THE PROJECT SITTHIINCLUDES THE INS1ALLATIOlI NECESSARY. GRASS(AREA FL=302.67 3. THE CONTRACTOR IS RESPONSIBLE FOR INSPECTING AND MAINTAINING THE EROSION AND SEDIMENT FL=302.69 CONTROL DEVICES. INSPECTIONS SHALL BE DONE EVERY 14 DAYS AND AFTER EVERY RAINFALL EVEN OF 1/2' OR MORE. THE CONTRACTOR SHALL REMOVE LLJ 7. V �7 t> S, AS A RESULT OF THE CONSTRUCTION OF THIS PROJECTALL MUD DEPOSITED ON E ADJACENT STREETS E 0).y 61 4. THE REQUIREMNTS IS REQUIRED TO MAINTAIN THE TPDES GE PERMIT NO. TXR 1500oo TS FOR CONSTRUCTION SITES. A> SEWER SERVICE 5. PERMANENT VEGETATION WILL BE ESTABLISHED ON THE DISTURBED AREAS AFTER CONSTRUCTION IS WITH CLEANOUT COMPLETE By HYDROMULCHING AND SEEDING ALL DISTURBED AREAS. Vj- 'PARKING ISLAND ACCESSIBLE ROUTE 6. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE 2012 CITY OF BRYAN /COLLEGE STA11ON STANDARD SPECIFICATIONS AND DETAILS FOR WATER. ALL CONSTRUCTION SHA /C < "-DECORATIVE 201 SF• THE CITY ENGINEER'S OFFICE. LL BE COORDINATED NITI PAVEMENT 7. THE CONSTRUCTION SHALL COMPLY WITH OSHA TANDARD 29 C s FR PART -19.? -Orz­­Tp (n` ., - -QTY _6_ _SUB. Pl-,r� R 11 7 �Em 26 BIKE SI /-4 -1 8. THE CONTRACTOR SHALL REMOVE THE EROSION CONTROL MEASURES ONCE GRASS IS ESTABLISHED ------FIRE LANE RATED CD PIRDJE HE 9. INLET PROTECTION TO BE INSTALLED AT ALL PROPOSED AND EXISTING INLETS ADJACENT TO THE N CONCRETE' PAVERS LOCATION PROJECT SITE. A co < -11 f > 0 10. CONTOURS SHOWN ARE FROM FIELD SURVEY DATA PREPARED BY KERR SURVEYING, LLC, Z-4 1 M (n cy) (,() \+J I 373 -U NOT TO SCALE 11 11. EXTERIOR BUILDING AND SITE UGHTING WILL MEET THE STANDARDS OF SECTION 7.10 OF THE UNIFIED > DEVELOPMENT ORDINANCE. THE LIGHT SOURCE SHALL NOT PROJECT BELOW AN OPAQUE HOUSING AND 4* POS% > NO FIXTURE SHALL DIRECTLY PROJECT LIGHT HORIZONTALLY. FIXTURES WILL BE MOUNTED IN SUCH A T TYP. FOSTER AVE. APARTMENTS MANNER THAT THE PROJECTED CONE OF LIGHT DOES NOT CROSS ANY PROPERTY LINE. PLEASE NOTE :!E m -I--LAY DOWN I-- 1 0 1 18 UNITS 1� -1 * > - THAT COMPLIANCE WITH THIS SECTION WILL BE VERIFIED AT THE TIME OF BUILDING CERTIFICATE OF OCCUPANCY. LDING PERMIT AND Uj CURB -41 r, nn, -7 17 _U I <\ > 20' REAR\ 27,806 S.F. < PARKING ANA m G7 I SETBACKllll REQUIRED PARKING: X > m W z 2 BEDROOM UNITS - 16 UNITS - 32 BEDROOMS 10' BUILDING HEIGHT f I I I _j T s 1.5 SPACES/BEDROOM = 48 SPACES (A BUILD( G' SETBA K < 4 BEDROOM UNITS 2 UNITS - 8 BEDROOMS Z 6 35' BUILDING HEIGHT 1 SPACE/BEDROOM 8 SPACES X j TOTAL SPACES CALCULATED - 56 > :25% REDUCTION = 14 SPACES r U) El - 7 TOTAL REQUIRED = 42 SPACES W V) < _:,+/ 2 HANDICAP SPACES REQUIRED CONDENSING UNITS RISER Ld < ROOM .& SCREEN WALL Na 0 < 2: r) I PROPOSED PARKING: _j of 2 41 SPACES PROPOSED 2" cr_ < 2 HANDICAP SPACES 42 BIKE SPACES N < > WATER SERVICE C-1) 43SPACES TOTAL 7 t> r) 0 PROPOSED 4" FIRE LLJLIJ F] F1 w \7 U) SPRINKLER LINE 16 BIKE SPACES GRASS AREA > 0 0 ry 0 F1 PROPOSED THOMAS PARK 0 < z:5 b) W z 6" FDC t> 40 ry q y - V) LINE CA n FIRE LANE < OPOSED FIRE RATED GRn U) DEPARTMENT CRETE OR ASS GRASS JAPPROVED z IRKING ISLAND-\ CONNECTION AREA I Cn" 181 SP PROPOSED tr O�T SIDEWALK 10 0 10 AND 1026 FOSTER AVE, SCALE IN FEET fv- mi_ CATS U AINU IU7 K w `• I<N < L IVVr_Aj 6 -------- EXISTING ------J-, L I A TOTAL AREA 0.74 FIF w ?E cz fLAY OWN ST ST ST ST ST S HYDRANT 1 R"n rain T %ZT - L,.,. f __ of% 2 CURB CU ST ST ST •24 k 10' BUILDING 01"o ou 0 - 1-1 C) V -Uo-ud PROPOSED <1 to 00, SETBACK Ea SIDEWALK EXISTING PARKING ISLAND /),IDao 6a0 O'c 0 -0-6 2:11 r. 194 SF 00 0" 57 11'W -136.67' 7�_ ATMOS GAS I 01r))0_0 I - _w__8 lu* W --E3 W-8 ------ LINE FIRE LANE W-8 �t_.-W-8 W-8 Vd W W-81 '7 RATED 4-E Uj > V SIDEWALK A> T ST -V ST ST,6;7- STI��- -ST- ST S T s -r,,. Si* s Z�T ST ST S T --SI ST s ;ST ST ST* ST ST ST -'ST S V t> I> SWINGING PROPOSED -A �PROPOSED '-6" ISO XTION_1, VALVE EXISTING STORM SEWER PROPOSED NGING GATE -SW/ EMERGENCY LAY DOWN FIRE HYDRANT SED 2" WATER (SEPNOTE 15) FRANCIS DR. EXISTING 8" DECORATIVE PROPOSED ACCESS ONLY SIGN CURB IRRIGATION METER 60' ROW WATERLINE IRON FENCE PER ADA METER 37' B -B ASPHALT PAVEMENT ARCHITECTURAL RAMP mmmmm� DETAILS PROPOSED AUG 2 3 '1013 ADA 1.6 W-CJUT' RAMP 24 UNITS ACRE: "W WTAU-Mffir COLLEGE STATI IN MUEGE "LL8 WrAT" ENGINEERING N-8 VOLUME 9e, m 468 t�'. I PROJECT •BEN-QH MARK COUNTY, TEXAS UA*Tri =10' Ef EVATI TBM 1 AUGUST 01 WN FIC ST /ST RAILROAD SPIKE. IN � �\jv ER/DEVELOPER: SURVEYOR-' TELEPHONE POLE CC BCS I LP KERR SURVEY ELEVATION: 313.36' C/O CLINT COOPER SURVEYING LC. 409 N. TEXAS AVE. EXISTING MH 1700 RESEARCH PARKWAY BRYAN, TX 77803 #2 i C3 REQUIRE RIM=314.45 SUITE 246 979-268-3195 E3 +11' FL=302.14 COLLEGE STATION, TX 77845 M _f L_= 9 0 �q,3 3 97 6p 7000 ENGINE -S-8 S-8 FL=303.88 ER: 4.2' +31 ii # k .1 CPU" .7 0 LNUINEERING, f.LLC. PO BOX 11995 COLLEGE • Engik SSTATIONi TV 4 X THE SEAL APPEARING ON THIS 'ileering, LU; JODOCUMENT WAS AUTHORIZED BY SEPH P. SCHULTZ P.E., LICENSE 2730 Longmire, Suite A NO. 65889 ON AUGUST 21, 2013. 2ollege Station, Texas 77845 - ADD. SCREEN WALL & COCOND, UNITS JS 8/21/13 '979 764.39(.10 TBPE NO. 12327 ISSUED FOR CONSTRUCTION 1 REVISED PROJECT NAME& PARKING, JS 5/8/13 SURVEYED DESIGNED DRAWN APPROVED JOB NO. DATE MARK REVISION BY DATE KERR JPS DLD JPS 12-210 REV. AUG. 2013 (979)764-3900 THOMAS PAI�I� LOFTS SCALE 1024 & 1026 FOSTER AVE. -SIVERTICAL TO PLAN LA COLLEGE HILLS ESTATES HORIZONTAL 111=10i LOTS 9 & 10, BLOCK 3 - COLLEGE STATION, TX SHEET I OF 2 PLOTTING SCALE: FILE NAME: 12-210 30" x 30" TEE 0" PIPE 118 FL IN: 309.31 30" PIPE 117 FL OUT: 309.31 PIPE 117 30" PIPE 111 FL OUT: 309.35 30" RCP PIPE 1.1 LF 00.00% PIPE 118 30" RCP PIPE 1.0 LF 00.00% 90' BEND I I I 90' BEND 30" PIPE 117 FL IN: 309.31 E30" I I 30" PIPE 118 FL OUT: 309.31 PIPE 116 FL OUT: 309.35 III 30" PIPE 119 FL OUT: 309.35 II 1( I I I I I PIPE 119 30 CP PIPE RLF I I I I 29.9 00. 9% I I I I I I I INLET 105 PIPE 116 TOP=313.20 L/ 30" RCP PIPE 24" GRATE INLET - V-5724-1 30' x 12" TEE rA Tyr D I 52.1 LF 00.25% I I I I I 5 x5 BOX STRUCTURE 30` PIPE 122 FL IN: 309.43 �( "'� 30" PIPE 120 FL IN: 309.31 _ L/ 12" PIPE 123 FL IN: 310.37 I ' 12' PIPE 121 FL IN: 310.18 PIPE 122 30" PIPE 179 FL IN: 309.26 PIPE 120 30" PIPE 122 FL OUT: 309'62 I I I 30" PIPE 112 FL OUT.309.26 30" HOPE PIPE 30" PIPE 120 FL OUT: 309.43 " ---- - -- - -- ---- I I 30 HDPE PIPE 48.9 LF 00.25% 73.7 LF 00.25% F-- I � I,� IIII II I II II II II I I I PIPE 121 INLET 104 1HDPE PIPE TOP=312.30 17.8 00.50% 24" GRATE INLET-V-5724-1 ' .5' BOX STRUCTURE � 12" PIPE __ II 115 FL OUT: 310.11 PIPE 115 I I INLET 106 PIPE 123 S- I 12" HDPE PIPE I I I I TOP=313.40 12" HDPE PIPE I 1.27.0 LF 00.50% I I 24" GRATE INLET - V-5724-1 134.9 .LF 00.50% D v E- 3.5'x3.5' BOX STRUCTURE 0 12` PIPE 121 FL OUT 310.27 v: o D .. o v �- v D �� D 30' x 12" TEE I I D p .v v 30" PIPE 116 FL IN: 309.22 I I I I v cD v '• v 0 (( ' 7 D 0 I I 12' PIPE 115 FL IN: 309.97 I I v D D _ 30' PIPE 114 FL OUT: 309.22 I I I I D v - v INLET 107 D � PIPE 111 I E-- I I �- 0 �. v TBM 1�Q 11135.0 30' RCP PIPE � LF 00.25% I D. . I I N D• I I '. D ¢ I I I PIPE 112 .17 to I I 30" HDPE PIPE v I I 101.E LF 00.25% I I D T III► I D• � p D TOP=313.75 0 12" AREA DRAIN - 19° PIPE 19A FL OUT.- 310 54 I v •• D v 0 v D • PIPE 114 D ' v av v p > 30" RCP PIPE I v ' • D (66.9 LF 00.25% D¢II -D � -• T r\ - � II D IIII _ I N I I D . ,,, 30" x 12" TEE I I FOSTER AVE. APARTMENTS v - Q 30 PIPE 114 FL IN. 309.05 I. _ __I_ _ __ ..__ _ _ - - FF-316:-00 I 12" PIPE 113 FL IN: 309.80 27, 806 SF , I 30" PIPE 110 FL OUT: 309.05 III { �D o. N INLET 10312. I I I I � D TOP=32.30 Ld Q 24" GRATE INLET - V-5724-1 k- I I v 3.5'x3.5' BOX STRUCTURE I ( ( v I12' PIPE 113 FL OUT: 309.94 I I ' I I I I PIPE 11 v y PIPE 113 30" RCP PIPEE 116.0 I INLET 110I 12' HOPE PIPE LF 00.25% I TOP=313.60 27.0 LF 00.50% I I I 1AREA DRAIN le AREA 90' BEND 12' PIPE 105 FL OUT: 309.49 N 30" PIPE 112 FLAN: 309.01 I I I 30" x 30" TEE 30" PIPE 109 FL :OUT: 309.01 I I Ltj < 30" PIPE 108 FL IN: 309.01 I I 30" PIPE 110 FL IN: 309.01 30" PIPE 107 FL OUT: 309.01 N I � - IPIPE 107 30" HDPE PIPE PIPE 109 y // 2.8 LF 00.25% ® 30" HDPE PIPE 1.1 LF 00.00% / 45' BEND / � 12" PIPE 105 FL IN: 309.38 30" x 30" TEE 112" PIPE 104 FL OUT: 309.37 102 30" PIPE 109 FL IN: 309.01 INLET 109 N I TOP INLET 12.95 i105 24' GRATE INLET - V-5724-1 I I 30" PIPE 10 FL IN:. 309. TOP=3DRAIN PIPE DP 5'x5' BOX STRUCTURE 30" PIPE 108 FL OUT: 309.01 INLET 108 12' AREA DRAIN 12' HOPE PIPE 30" PIPE 107 FL IN: 309.00 TOP=311.80 12" PIPE 104 FL IN: 309.20 22.6 LF 00.50% L I 12" PIPE 106 FL OUT: 308.86 I I 12` AREA DRAIN 12' PIPE 103 FL OUT: 309.20 PIPE 108 12' PIPE 103 FL IN: 308.91 I { (� ({� { { { { { { {� ( { { { { { { { { { v 31 HDPE PIPE 12" PIPE 102 FL OUT: 308.91 �_ { { { i { I ( i { { lit= (({ { I PIPE 10s I I 1.1 LF 00.00% { { { { I { 12" HDPE PIPE I 17.2 LF 00.50% PIPE 102 cfl PIPE 103 N (29.9 L12" HDPE PIPE 12" HDPE PIPE i �� ' /� • v D F 00.50% 58.5 LF 00.50% 51 WIC D PIPE 104 D 12' HOPE PIPE v INLET 101 E- o ` 34.9LF 00.50% TOP=312.90 y Iv/ POND OUTLET STRUCTURE U) 12" PIPE 106 FL IN: 308.76 12" PIPE 102 FL IN: 308.76 PIPE 101 10` PIPE 101 FL OUT: 308.61 w N 10" HDPE PIPE W- 8 Q 9.3 LF 00.68% J_W-8 _- -- W-8 ----��-W-8----W-8 D. _----W-8' ____------W-8 --W-B D -ts-rJ W-8 '� .4-----W-8 y---'W S' W-8-=----'-- W-B �----- -W.-8. _- - vST - ST v 5T -- STv- ST -�'ST go ° W-8 --�7 ST ST S ST - ST --:> ST -o T - ST ' o. ST --• Sb'-' ST o 5T- ST' v- Sl --. ST v �p18� 2�11RI�- D ST - ST ST - ST - ST S�v v o _� ---Ts FRANCIS DR. 60' ROW Structure - (19) 37' B-B ASPHALT PAVEMENT JUNCTION BOX U) 10' PIPE 101 FL IN: 308.54 30" EXISTING PIPE FL IN: 306.83 O 5 O O 30" EXISTING PIPE FL OUT 306.83 SCALE IN FEET 0 #t%it;�hU'I'ntz-�Enqineering,.L,LC. 2730 Lgngmire, Suite A College Station, Texas 77845 979.764.3900 TBPE NO. 12327 SURVEYED DESIGNED DRAWN APPROVED JOB NO. DATE KERR JPS RCF JPS 12-210 AUGUST 2012 C o . v D D v V FOSTER AVENUE APARTMENTS 1024 & 1026 FOSTER AVE. COLLEGE HILLS ESTATES LOTS 9 & 10, BLOCK 3 -COLLEGE STATION, TX SQUARE 28-DAY CONCRETE STRENGTH 3000 psi PLAN O.D. + 6" MIN. #4 BARS 12" O.C.E.W 6" TOP & SIDE WALLS BOTTOM SLAB NOTE: ALL PIPING AND FITTINGS TO BE IN ACCORDANCE WITH PLUMBING CODE PROPOSED ROOF DOWNSPOUT `4' PIPE \ LENGTH VARIES ` 4" 45' BEND 4' PIPE LENGTH VARIES W PIPE - 6' WYE %- 6' PIPE ROOF DOWNSPOUT CONNECTION DETAIL N.T.S. NON- STRUCTURAL STRUCTURAL PAVEMENT BACKFILL BACKFILL STRUCTURE CLEAN, EXCAVATED MATERIAL PER PAVING ° BACKFILLED AND COMPACTED PLAN ACCORDINGTO_ GEO-TECHNICAL REPORT 3' MIN. EACH SIDE -► f 6` SIDE WALLS #4 BARS 6" O.C.E.W. TOP & BOTTOM SLAB COMPACTED CEMENT STA81- SECTION A -A LIZED SAND, 1X SACK/CY, 000L0 PUGMILL ONLY. SPADE BY JUNCTION BOX DETAIL 12" MIN 0 0 0 00000 0 0 o 00000° LIFTS INTO PLACE, TO FILL ALL VOIDS AROUND PIPE. 000 °00 MANUALLY CONSOLIDATE AT N.T.S. 00°0 o 0 OPTIMUM MOISTURE. PIPE O.D. 8 c o'o0 °°0 °00 00 0°0 00 COMPACTED CEMENT STABI- (6` MIN) PIPE LIZED SAND, 1X SACK/CY PUGMILL ONLY. SPADE BY ❑❑❑❑❑❑ O.D. LIFTS INTO PLACE, TO FILL ALL VOIDS AROUND PIPE. ❑❑❑❑❑❑ THE TRENCH BOTTOM SHALL BE MANUALLY CONSOLIDATE AT ❑❑❑❑❑❑ GRADED SO AS TO PROVIDE UNIFORM \��\CELL• 12" MIN, OPTIMUM MOISTURE AND CONTINUOUS SUPPORT FOR THE ❑❑❑❑❑❑ ❑❑❑❑❑❑ PIPE BARREL BETWEEN BELL HOLES O.D. + 6" BEDDING AND TRENCH BACKFILL MIN. 2 -6 SQUARE 28-DAY CONCRETE DETAIL FOR HDPE & RCP STORM PIPE PLAN STRENGTH = 3000 psi #4 BARS 12" O.C.E.W. O.D. + 6" MIN. SIDE WALLS - 6" TOP & r- BOTTOM SLAB N.T.S. #4 BARS 6" 0 C.E.W 6" SIDE WALLS TOP & BOTTOM SLAB _ 8" ORIFICE SECTIONA A I ( / SINGLE GRATE INLET ELEv. 308.s1 6' SECTION B-B LEGEND - -�- EXISTING CONTOUR PROPOSED CONTOUR BOUNDARY -� FLOW DIRECTION oof FIRE HYDRANT •0- GATE VALVES 0 SANITARY SEWER MANHOLE S-6 PROPOSED SANITARY SEWER LINE W-6 PROPOSED WATER LINE ST ST PROPOSED STORM SEWER LINE CONSTRUCTION EXIT, - SILT FENCE Q�pp� INLET PROTECTION WHEEL STOP DECORATIVE FENCE (PER ARCHITECTURAL DETAILS) .AE OVERHEAD ELECTRIC LINE SECTION A A FLOW CONTROL OPENING DETAIL - INLET 101 N.T.S. D INAGE PL RACK RS 0 6" V. PLAN VIEW NOTES: 1. ALL TOPSOIL SHALL BE SALVAGED AND STOCKIPILED FOR REUSE. 2. BACKFILL ALL PROPOSED PARKING LOT ISLANDS WITH FULL DEPTH TOPSOIL 3. ALL STORM -SEWER PIPE. EXCEPT AS NOTED, MALL BE HDPE. SDR-35. ASTM D-3034 PVC: PIPE MAY BE USED IN PLACE OF HDPE PIPE HDPE PIPE SHALL MEET AASHTO M294. TYPE S WITH 'WATERTIGHT SEAL HOWEVER. THE - PROPOSED STORM SEWER IS PRIVATE AND SHALL BE INSTALLED IN ACCORDANCE WITH 1HE LOCAL PLUMBING CODE IRIS INCLUDES THE PIPE MATERIAL AND FITTINGS. THE CONTRACTOR SHALL VERIFY WITH THE LOCAL BUILDING OFFICIALS THE TYPE OF MATERIALS REQUIRED BY THE CITY OF COLLEGE STATION PRIOR Tit CONSTRUCTION OF THE STORM SEWER. 4. AREA INLETS MAY BE CAST IN PLACE OR PRECAST CONCRETE.. ALL' CONCRETE. FDIC DRAINAGE CONSTRUCTION SHALL HAVE A .MINIMUM 28-DAY COMPRESSIVE STRENGTN OF 3000 PSI. 5. STRUCTURAL BACKFILL AREAS ARE DEFINED AS ANY TRENCH SECTION UNDER OR WITHIN 3' OF PAVEMENT. 6. JUNC710N BOX STCM2M SEWER COVERS ARE PRIVATE AND SHALL USE NOT `CITY OF COLLEGE STATION* LOGO ON COVERS. SCALE VERTICAL 1 "=4' HORIZONTAL 1 "=10' PLOTTING SCALE: 1:1 FILE NAME: 12-210 EXHIBIT C L11111IM111 II I IIIH I IILIJ_LIIIIIII II T h o m a s P a r k 6 Wall Mounted Signage 5 Monument Signage Yvle: V6*I'Q Thom-C Park �1 4 Wall Hung Signage s[are.- ve+ro 3 North Signage Elevation 2 West Signage Elevation xam: v/1%11' H I,QwTL L F R A N K • • • RPLMIIECiS U) �00 O �� r J > (1) Qm L N V- O N CU O Cn N N � ,C O N U Legal OeaM LOTS 9. E+o, BLOcrc] COLLEGE HLLS ESTATES 'cural M PAGE He C.VNtt. T OLLEGE1 U. P P/SOSEAS Total cle M- u] —' M14gl l Jesse Durtlen P.I.-uoa 19]'9.cD+��T onu 25 CC CC BCS 1 LP do Clint Cooper + IOOfleSearcM1PaMay Sule2J0 Cnik9e slalbn, i%]1895 19)912E0.iW9 A.W Hill& Frank, Inc. +ero sL s�iaw.swuzos Q+JI BT!-+SIT Sc EgzE Schultz Engineering 2739LmeM:e ome emege slallo�. Tx Haas (9191)G99'� Sun p Kerr Surveying, LLC 403 N. TeraSRvew pr,p %'. (e181zb8JIB5 P'�j�Proct: June 6, 2014 1 East Signage Elevation S'.ale: I/b,ld 2 cvyglo,l 2m2 Hil h Emmx. a. Sheet O{ other tlocumenls v/e'-1 by I1e Archrlecl /ar 1F1 Project yr 'nslrvmenls of the Archilxl2 —A- 11 m vin re .—I us sole/y x;" respect lv this Pmjecl, -1 I1e s Ar[M1ife[f l:vll the Th vulho/ o/ ese Oo[uments ono shall '0— v s -1 olner Oocumenls /o/ in/ormo. ono /e/erevice in [onneclion vilh llle Owver's use -10 [uponcy v/e+ne p/oje[l. /ne Architect's O/owings. Scecrlicol/ans or other Oo—Wu moll not De usev Oy fne Owner m others roproje[fsv rtl vlhe[ [esenM /fights, including the [opyri ghl. the Owner shall Oe permillee Iv reloln copies. /n[lutl/ng repro EvciDle copies, o/ 1. to this Wojecl or /or [omPlelrvn o/ V:is Pivjecf OY olners, except pY ogreemenl in w lin9 ono wrM aPP/^Vnate cam4ensvfron !v Me Frchife['1 t L 1 1 1 1 1 1 1 I_ 1 1 1 1 L I H 111LI l l ,L L t I L T h o m a s P a r k 6 Wall Mounted Signage .male, Monuement Signage Thom-C Park O fr. {. S 4 Wallt Hung Signage 3 Alt. North Signage Elevation Ysle, lb'=I'O' K nR A N L K A C HI T E C T S co b O r ti J > N 1 ¢ x L N (� N F LL O N O � N N � O (D r O U 2 Alt. West Signage Elevation galD tW M To jr. 9LCC COLLEGE N ILLS ESao.a o.L..e 1. PAGE610 OLLEGESTATION, 9RPZOS.O ol. T.. Toot ce. Pre a: 1J o.. All. East Signage Elevation Yale: r ....roP rmY rot Jesse Durden P O. a- I.o 1 seg.fto bn. T%2T&2 Om r: CC BCS 1 LP do Go Clint Cooper . tnoearNPariwry oec. pn>o ta0on.M r]NS 19T9)2fi0.1LW Ar[MM Hill& Frank, Inc. 1eo9 f1l.—Face.sum. p1J)eiT- 12. f. ereune Schultz Engineering 2To Lapm9e coo Ccroo., . To,., rern'.. Project: Date.' June 6, 2014 Pm9nt 2912 xm . rrnn.. IJr, Sheet of me Oro any:, Speoifrcouor, roof rote, nocomenl, prepono q the arnimn for mh wojen ce m:nomenla o/ the Arcnned::e a for es coleiy m1h ,peel to m¢ nn Pmjecl, a marne necl Act ee memm mc e oloc, or mete o mmis nn n s-I.. on co Ine. alnmtory one offer re rvee r"" mcmemq Inc aopyngnL me 0— or PoPedlee m re topic:, mnuamq reyroeoomm coe/ec,, o/ co ',ro lecl's erreinys, Speti/nations ." of,- oeco--. tar inlormolirn rrd reference in re —turn rim the Oene,s tee end oaoncy upof re the project. fee Act rchites footings, Seocieito ccoons or older 1—orenls stool/not not be used Vure Owner oromere eo other projects, for rtl0ioom to offs Project or for comelclion o/ mis Project by others, ercepl by rgreemenl in ,r ung ono am opprrpriote compensation to the A,chilecl. W W ry U) U 50 Z ry (.0 LL `i FOSTER AVENUE ( 601 ROW ) Site/Ground Signage Plan NORTH H [p�L L F R (A N K A RCHIlE CiS 0 00 o J > in X L N ~ u- O N CO E O � V N N O = O (1) O U l[Des[AgM: It ,d CN COLLEGE LiTfd ..b1. ebGtioJlb robr.. B RFZDB CWNN, iEYAS teal sW N w n Abod, Abdoe.l Jesse Curden In. ol.1 mlh`, n nsaz 19191<93uf35 OxMc CC BCS 1 LP do Clint Cooper 1]W Rnea:N Pe May Cudleye Sle Wn.lX ]IBJS 1919j 380.]WJ 1O11e2 Hill& Frank, Inc. 1BW SI. J7 mes Plan.Sule t05 1]I JI BI]-13y9� CM Eldo be Schultz Engineering loo c7 sl mn�Te Haas 19]91 iaa39W Suldy Kerr Surveying, LLC 1.u.]erae nlobo e, i% 1)B03 19]9)26BJ195 Pr jeer Oct, June 6, 2014 Al z coPlagnl Sou to, a I...1, 1 e. Sheet cf ]bs el—ogs, st—tried. v .1od, Oveumenis pe"boo, by Ile "l:ile[f 1, this P[vje[f boensNumenfs I lie 1"Nlo.l'o s e 1, u solely with [¢sped 1. . 1,1', —1 the "'teed shop be Eeeme, the vine.[ o] Ib,,. Jbeumenh v retain all a .e., v [;,bl,, in Ain, d, e,n,11 too Orne[ s l be 1—iNed Iv -1b. ropies, iod";ng [ep[oEu[ibk [opie; or tie ArtldeO, Oea whngs, Spe[i -1;.ns —1 Doer documents !or ,n /oem vli on ono "alone. w, [on ¢[lion e", Ibe Owne[i use old o [uponcy of file peoje[! Ile Al tlbcl's Oiorvin,s, Spe[iflcvliovs Ae .,be, ltd—old sheet not be used by the Oele[ o aolhers on other p o eelsv lve (..'ions fv tM1 ie Pmj-1 ea roe comple fion el ll:is Pmjeel by vibes, e+[epf by velbloo nl 0 n'ling Old with appeopeiole [o beensvlion to the Archibn,'