Loading...
HomeMy WebLinkAboutDrawingsPROJECT BENCHMARK: SQUARE CUT ON BACK OF CURB OF NORTHEAST CORNER OF HOLLEMAN & LASSIE. X: 3561069.26, Y. 10210476.97, ELEV: 302.12' SITE PLAN SCALE 7 "=4' .l•]I r; � ►i?- .illi -.-�. � _!. �_ •' I I 299.36 I PROP. SIDEWALK MAX. ALLOWABLE CROSS SLOPE IS 2% A 299.15 LMOF OCA BE RELD VERF ED BY CONTRACIOR MD MM ►S:E► DURMC «• LOCATION OF ELECTRICAL LINE SHALL BE FIELD VERIFIED BY CONTRACTOR AND REMAIN UNDISTURBED DURING CONSTRUCTION. - -- . . 2"x4" vertical ridge O o N.T.S.) I / I 299.36 I PROP. SIDEWALK MAX. ALLOWABLE CROSS SLOPE IS 2% A 299.15 LMOF OCA BE RELD VERF ED BY CONTRACIOR MD MM ►S:E► DURMC «• LOCATION OF ELECTRICAL LINE SHALL BE FIELD VERIFIED BY CONTRACTOR AND REMAIN UNDISTURBED DURING CONSTRUCTION. BACK OF CURB HOLLEMAN DRIVE (60R.O.W.) • • ti r «• :3-,r ♦ ► • • r,r • WIN Ia «• 111111L$_�41 GRADING PLAN &EROSION CONTROL SCALE 1 "=4' METAL T -POST -1 AS REQ'D. TO MAINTAIN. SPACED 6' APART SILT FENCE AND/OR HAY BALES TO BE USED IN AREAS OF DRAINAGE FLOW. NATURAL GROUND -7 / - 2"X4" WIRE MESH FASTENED TO T=POST SEDIMENT CONTROL FABRIC FASTENED SECURELY TO T -POST & WIRE MESH 8" OF FILTER FABRIC TO EXTEND INTO A TRENCH AND BE ANCHORED WITH COMPACTED BACK FILL ALLOW 2,5' TO 5' AT TOE OF SLOPE FOR SEDIMENT TO ACCUMULATE. ALIGN FENCE ALONG SLOPE CONTOURS. i. DIRECTI_ of FLOW C_ II 4.. 4"X4" MIN. TRENCH 4" f 20" L-1 SILK FENCE ASSEMBLY I ` Q� Cot 19_- #3 Rebar ® 12" Centers Centered Within 4" Concrete �P (3500 psi) WPC BEDlCAT10N Backfill Backfill Cot lA AREA Wood Float Finish e� I I= I �I 4 Thick Concrete 1 Cot 1 T97 2. I FEI 11=f I FEI I 111-1 I RSI I -III I I I I I I C 11j1I I 2 y' 1R 11=11 rI 1 �I I I _ 2" CEMENT STABILIZED SAND Prepared Subgrade �' 8 OR LIME STABILIZED SUBGRADE G' ( n 10 ,� PMfl@HH&= Expansion Joints ® 40' o.c. SGS 0 9 Contraction Joints ® 5' o.c. 3 'S' B 14 5 STANDARD CONCRETE SIDEWALK DETAIL �s, 12 13 15A 2 3 2 �P 13B 4 NTS �� 11 �, 3 1C 0V 2 40 9 1 VI C I N ITY MAP 2"x4" vertical ridge 299.10 r {°s 299.04 - N.T.S.) SAWED OR FORMED, GENERAL CONSTRUCTION NOTES: C .• ELEC •� c C .' ELEC - - c . ELEC C ELEC , - r • -. - •_ l ^ - t ELEC r- -: . r , r c c / r r -r-'. rC' .� •' _ �- r i r - / r - T, • �: r -. - r � - - rt- - ►`� - •EF c. - - r-. c c.:' c c r •c � r c• r c• -� - r• � _ r rr c . /• - r- r. •r. r TTICbNNEC;f Al KEXISTING - : -_ c �� - r -•- � _� . SIDEWALK EXISTING SIDEWALK . r. / - - r - "- r� � � c ' - .,. (SEE CONNEECXTS ISTING r - .c n : c c - r - / • / •� • r' .. r -D;r - _ - - - c. cCd CR DETAIC�- c . � �.,, �.- S r • :r r �.. - r r' i - r c r _ r 7 f. Contact Union Pacific Resources ® 778-8525 O a- VN ��F ✓ BACK OF CURB HOLLEMAN DRIVE (60R.O.W.) • • ti r «• :3-,r ♦ ► • • r,r • WIN Ia «• 111111L$_�41 GRADING PLAN &EROSION CONTROL SCALE 1 "=4' METAL T -POST -1 AS REQ'D. TO MAINTAIN. SPACED 6' APART SILT FENCE AND/OR HAY BALES TO BE USED IN AREAS OF DRAINAGE FLOW. NATURAL GROUND -7 / - 2"X4" WIRE MESH FASTENED TO T=POST SEDIMENT CONTROL FABRIC FASTENED SECURELY TO T -POST & WIRE MESH 8" OF FILTER FABRIC TO EXTEND INTO A TRENCH AND BE ANCHORED WITH COMPACTED BACK FILL ALLOW 2,5' TO 5' AT TOE OF SLOPE FOR SEDIMENT TO ACCUMULATE. ALIGN FENCE ALONG SLOPE CONTOURS. i. DIRECTI_ of FLOW C_ II 4.. 4"X4" MIN. TRENCH 4" f 20" L-1 SILK FENCE ASSEMBLY I ` Q� Cot 19_- #3 Rebar ® 12" Centers Centered Within 4" Concrete �P (3500 psi) WPC BEDlCAT10N Backfill Backfill Cot lA AREA Wood Float Finish e� I I= I �I 4 Thick Concrete 1 Cot 1 T97 2. I FEI 11=f I FEI I 111-1 I RSI I -III I I I I I I C 11j1I I 2 y' 1R 11=11 rI 1 �I I I _ 2" CEMENT STABILIZED SAND Prepared Subgrade �' 8 OR LIME STABILIZED SUBGRADE G' ( n 10 ,� PMfl@HH&= Expansion Joints ® 40' o.c. SGS 0 9 Contraction Joints ® 5' o.c. 3 'S' B 14 5 STANDARD CONCRETE SIDEWALK DETAIL �s, 12 13 15A 2 3 2 �P 13B 4 NTS �� 11 �, 3 1C 0V 2 40 9 1 VI C I N ITY MAP -- 14'-11" 2"x4" vertical ridge 1/2"02" G LVANIZED THREADED J BOLT stiffener welded N.T.S.) SAWED OR FORMED, GENERAL CONSTRUCTION NOTES: COLLEGE STATION, TX 7784 1/8" TO 3/16" SEAL WITH EXPANSION 1. It shall be the responsibility of the Contractor to verify the exact location of ALL existing underground utilities. Furthermore, the Contractor shall contact all SITE PLANS + SUBDMSIONS JOINT MATERIAL, MIN. utility company representatives a minimum of 48 hours in advance of any excavation. 6-8" 3/8" R 3 - 2" round galvanized 41.4„ W 70 a. Contact Dig Tess 0 1-800-344-8377 supports , *`����` SSIONAL EAG C b. Contact Kimberly Winn ® ATMOS 774-2506 N NST' • ��m-a c+c 3_y a'�Bm C. Contact Mike Lavender ® Suddenlink 846-2229 p � U 4'e. d. Contact Gilbert Martinez ® College Station Electrical 764-3650 O _ - Contact Mitchell Gas 0 779-4460 O LL_ f. Contact Union Pacific Resources ® 778-8525 O a- VN ��F g. Contact Richard Wallace ® Verizon 821-4752 SIDEWALK CONTRACTION JOINT h. Contact Butch Willis ® College Station Water & Sewer 764-3660 2. All construction shall be in accordance with the current City of College Station (C.S.) Standard Specifications for Street Construction, B/CS Unified Technical Specifications, Water and Sewer and Generals, 2009, and BCS Unified Design Details. All inspection shall be performed by the staff of the City Engineer of C.S. All construction shall be coordinated with the City of C.S. City Engineer. SEAL WITH EXPANSION 3. In lieu of using the construction materials indicated in these plans, the Contractor shall obtain written approval from the City Engineer for any substitution JOINT MATERIAL- SMOOTH DOWEL BAR - prior to Construction. Requests for changes >should include product information and an ,engineersseal where applical le. The contractor shall be financially 1/4" R 1 /2" 0 X 18", 12" O.C. responsible for the engineer's time spent reviewing changes and redesigning based on contractors requests. a: 3/4" (COATED W/HEAVY GREASE) 4. Trench Safety Requirements shall be in accordance with O.S_H.A. Standard 29 CFR Part 1926 Subpart P. For general 5. TRENCHING AND BACKFILLING: All trenching and backfilling shall conform to the specifications set out herein. Testing requirements, see Sheet S3 for details. shall be provided by a certified K laboratory, at the Owner's expense, to verify these standards. Any retesting due to substandard work shall be at the expense of the Contractor. Structural , 4 areas shall include all sidewalks and shall extend 5' beyond the curb lines "of all streets, alleys and parking areas. 6. It is the responsibility of the contractor to comply with all State and Federal Regulations regarding construction lines. Additionally, the contractor shall coordinate all proposed work and procedures with the City of C.S. Electrical Division. activities near energized overhead power COLLEGEm 7. All materials & labor not identified as a Separate Bid Item shall be considered subsidiary to the item in which iit is used. All materials and equipment shall RECYCLED MATERIAL, 1/2" be both furnished and installed unless otherwise noted. V THICK AS MANUFACTUREDJ3" LONG METAL OR PLASTIC CAP, INSIDE 8• The Contractor must provide construction staking from the information ,provide on these plans. BY J.D. RUSSELL CO. OR DIAMETER TO BE 1/16" GREAT€1 -THAN APPROVED EQUAL 9. All soil exposed by construction shall receive cellulose fibermulch seeding. DIAMETER OF DOWEL BAR. CAP MUST 10. Trenches may be left open overnight if properly barricaded. BE LONG ENOUGH TO COVER 2"OF 11. Adjustment of Water Meters, Valves, Manholes, Irrigation Systems, and any other Public or Private Utility, etc. are not separate pay items. The Price of the DOWEL AND HAVE STOP SO END OF adjustment shall be subsidiary to the construction of Bus Shelter. ; CAP IS 1" FROM END OF BAR. 12. The contractor shall coordinate with Suddenlink Communications, Atmos Energy, and Verizon to adjust the locaton of existing facilities, if necessary 13. The contractor is responsible for traffic control. This is not a separate pay item. 14. No spoil areas are available on this site. #4 BARS ®12" O.C.E.W 15. Contractor shall provide 100% coverage of groundcover, decorative paving, decorative rock (not loose), or perennial grass as required in parking lot islands, SIDEWALK EXPANSION swales and drainage areas, the parking lot setbacks, right of ways, and adjacent property disturbed during construction. 16. Sidwalk be in B/CS placement shall accordance with Unified Design Guidelines. 17. Finish: Light Broom Finish. Joints to be tooled 1" deep at an interval equal to the sidewalk width. Expansion Joints ® 40' O.C., Contraction Joints & CONSTRUCTION JOINT 0 5' O.C. 18. Dowel in and tie to any concrete structure adjacent to sidewalk (driveway, inlet box, curb, junction box, etc.) with #3 x 12' Bars CSD 12" O.C. or 1 6" 1 #4 x 12" bars @ 18" O.C. 19. Compaction: Compacted subgrade material compacted to a density at least 98% of maximum dry density ��s determined by proctor compaction test ASTM D698 (Standard) and shall be 0-47. wet of the Optimum Moisture Content_ 20. A minimum clear pedestrian width as defined by TAS and ADA shall be provided for entired length of sidewalk. *ALL STEEL SHALL HAVE 21. All areas where existing vegetation and grass cover have been bared by construction shall be adequately block sodded or hydromulched and watered New Concrete Existing Concrete until growth is established. In development areas where grass is present, block sod will be required. Bared areas shall be seeded or sodded within 14 DAD DETAIL calendar days of last disturbance_ OF CONCRETE 22. Approved erosion control measures must be installed during the entire time that earth has been bared by construction and shall stay in place until Proposed Reinforcement acceptable vegetative growth is established after construction is complete and then removed by contractor. See Detail Drill & Epoxy Proposed 23. All erosion control measures should be cleaned of silt after every -rain. Reinforcement into Existing Concrete (Min. 9" Depth Drill) 24. There will be no Electricity to the bus shelter. (Epoxy per TxDot 5016) SITNAoNOeES: - - . Name Project:The at Wolf Pen Creek Bus ._; . .,Rector 2. Legal Description: Portion of Called 8.21 Acre Tract Morgan Re t A-46 rLeague -Arbors LP3 Owner Rose -, PO Box 40879 Indianapolis, Indiana 46240-0879 4. Engineer. Mitchell &Morgan, L.L.P. O NECT TO y/ST/N A C N E G CONCRETE C DE% lL 511 University Drive East, Suite 204 G%'E College Station, Texas 77840 £ NTS (979) 260-6963 5. Zoning: WPC (Wolf Pen Creek Development Corridor) 6. Existing Use: Multi -Family (& Parking) 7. Project Address: 301 Holleman Drive East - -- 14'-11" 2"x4" vertical ridge 1/2"02" G LVANIZED THREADED J BOLT stiffener welded 511 UNIVERSITY DRIVE EAST to ridge support Standing seam metal COLLEGE STATION, TX 7784 roof (green) 1x3 galvanized angle HYDROLOGY « UTILMES Welded to -the 2' SITE PLANS + SUBDMSIONS supports at corners 7'-7 Firm #F--1443 08/30/1 6-8" ... a: ................................... 3 - 2" round galvanized 41.4„ W 70 VERONICA J.B. MORGAN supports , *`����` SSIONAL EAG 1'!x12"x12" plate 15 sq. stone column base welded to supports add on bench to pad per -1"x12" galv. threaded manufacture details j -bolt anchors 6' Victor Stanley Bench (RB 28) or Approved Equal 1x3 galvanized angle welded at the Aluminum roof panel suppc joined at the rids 15" sq. stone column base 3 2" round galvani supr Fabricated ri welded from 2.5" galvanized flat bar g seam metal :en) T. : ELEVATION =11FICATE C1 REOUIRED C3 +I ♦ 0 +rr29 6... 'Tt7♦ C3 NOT RE-'QUIPED rREVIEWED" FOR VAPI 14N SEP 2'5 2012 i t DEVEE.OPMEN1 SERVICES PLAT FILED: MITCHELL MORGAN T.979.260.6963 1/2"02" G LVANIZED THREADED J BOLT ® " 511 UNIVERSITY DRIVE EAST SUITE 204 COLLEGE STATION, TX 7784 U -ANCHOR FOR COLUMN Ine HYDROLOGY « UTILMES STREETS SITE PLANS + SUBDMSIONS www.mitchellandmorqan.com Firm #F--1443 08/30/1 OF , TFfi ... a: ................................... . rt ti ann VERONICA J.B. MORGAN ...................................... 77689 O ,tea ST E *`����` SSIONAL EAG C m�m N>�> N NST' • ��m-a c+c 3_y a'�Bm p � U O ._v t�. O LL_ N O a- VN ��F ^L Q 0O O a e *__4 a: Z: SEP ) ow , , 2TYPN COLLEGEm O� QD m W �W V f i 12" - ENGINEER #4 BARS ®12" O.C.E.W IE �I FOOTI PERIMETER OF PAD 1 6" 1 *ALL STEEL SHALL HAVE 2" CLEAR FROM EDGE DAD DETAIL (A4) OF CONCRETE NTS MITCHELL MORGAN T.979.260.6963 F.979.260.3564 TX. FIRM # F-1443 511 UNIVERSITY DRIVE EAST SUITE 204 COLLEGE STATION, TX 7784 PLAN & DESIGN SF;ECIAUSTS IN CML ENGINEERING H1VRAULICS HYDROLOGY « UTILMES STREETS SITE PLANS + SUBDMSIONS www.mitchellandmorqan.com Firm #F--1443 08/30/1 OF , TFfi ... a: ................................... VERONICA J.B. MORGAN ...................................... 77689 O ,tea ST E *`����` SSIONAL EAG C m�m N>�> N NST' • ��m-a c+c 3_y a'�Bm p � U O O LL_ N O a- VN ��F ^L Q 0O O N ry Z: ow O� QD m W �W V f i O