HomeMy WebLinkAboutDrawings14
3LCPC3 1 4 1 5 1 6 ( 7 1 8 1 9 11
6
3
BLOCK 28
I
2
dam'
I
33�N�'
2
3
4
5
6
7
/
BLOCK 1
LOT 1
16
/
COMMERCIAL � � fl 7
TRACT 1
3.85 ac.
19
20
rn 1
70
1
2
10
4
5 6 7 891
it
12
29
"'i
70BLC
X13
14
3LCPC3 1 4 1 5 1 6 ( 7 1 8 1 9 11
COLLEGE STATION ISD
_ 27.017 ACRE TRACT
CITY OF COLLEGE STATION
BRAZOS COUNTY
N/F
OAK CREEK L.L.P.
REM, 58.52 ACRE TRACT
4030/98
BRAZOS COUNTY
N/F
HENRY P. MAYO AND
WIFE, SANDRA K. MAYO
23,00 ACRE TRACT
TRACT 2,1253/878
BRAZOS COUNTY
2001 100 0 200
SCALE IN FE T
1 1 2 3 4 5 6 7 8 9
OLD IR❑NSIDES DR
OC
6
3
BLOCK 28
I
LOT
dam'
I
1 1
2
3
4
5
6
7
8 9
15
16
17
18
19
20
rn 1
70
1
2
3
4
5 6 7 891
z8
29
"'i
70BLC
CK 4J
Z
-0
3
AREA NOT INCLUDED)
I
ALLEY
'10
11 12
13
14
J1067
1�K
10 I
S42' 14' 17"W - 36.00'
J
11Ln
12
S47' 45' 43"E - 113.00'
COLLEGE STATION ISD
_ 27.017 ACRE TRACT
CITY OF COLLEGE STATION
BRAZOS COUNTY
N/F
OAK CREEK L.L.P.
REM, 58.52 ACRE TRACT
4030/98
BRAZOS COUNTY
N/F
HENRY P. MAYO AND
WIFE, SANDRA K. MAYO
23,00 ACRE TRACT
TRACT 2,1253/878
BRAZOS COUNTY
2001 100 0 200
SCALE IN FE T
1 1 2 3 4 5 6 7 8 9
OLD IR❑NSIDES DR
OC
6
3
BLOCK 28
I
LOT
dam'
I
1 1
2
3
4
5
6
7
8 9
15
16
17
18
19
20
21
22
LOCK
HLLLT
DEACON DRIVE
1 - _"ffl1
N/F
JOHN WHEELER BARGER, TRUSTEE
29,175 ACRE TRACT
7583/90
ZONED A-❑
BLOCK 7
9 2
3
4
O 5
3 6
D 7
Z B
C
f C3
� SO
p I1
1 f 22
13
14—
N42' 14' 17"E - 1858.55'
=------I--------------------I
h
3
BLOCK 28
I
LOT
dam'
I
110
11
12
13
14
15
16[17
18
15
16
17
18
19
20
21
22
LOCK
DEACON DRIVE
1 - _"ffl1
N/F
JOHN WHEELER BARGER, TRUSTEE
29,175 ACRE TRACT
7583/90
ZONED A-❑
BLOCK 7
9 2
3
4
O 5
3 6
D 7
Z B
C
f C3
� SO
p I1
1 f 22
13
14—
N42' 14' 17"E - 1858.55'
=------I--------------------I
h
3
BLOCK 28
I
LOT
dam'
I
S42' 14' 17"W - 402.25'
F—BL& i
2
3
4
5
6
7
8
9
10
11
L 12
HEATH PHILLIPS INVESTMENTS, LLC
THE
BARRACKS II
HYESLANE
-FUTURE DEVELOPMENT
r1_ WE9Cx 1
PHASE 300
3
BLOCK 28
LOT
FP 1
W14
II I
3
I II \ I
Z
II
S42' 14' 17"W - 402.25'
F—BL& i
2
3
4
5
6
7
8
9
10
11
L 12
HEATH PHILLIPS INVESTMENTS, LLC
THE
BARRACKS II
HYESLANE
-FUTURE DEVELOPMENT
r1_ WE9Cx 1
KATEILANE
31
PARKLAND
0.35 ac.
1
7' 45' 43"W - 198.00'
42' 14' 17"W - 40.00'
N47' 45' 43"W - 24.00' PARIQ-AND
-S42' 14' 17"W - 110.00' 0.35 ac
ALLEY N47' 45' 43"W - 113.18'
2 PARKLAND ARKLAND �j C
0.38 ac. 3 59.88 ACRE S
3
0.26 ac.
004
N
ING ZONING: "
N42'
BLOCK 1
9
11
12 N47'
13
�'4
EXIST00
PDD - PLANNED
W
-DEVELOPMENT DISTRICT i
PROPOSED ZONING: I o
PDD - PLANNED I y
F❑XTR❑j
2
CZ
—I
a
H
r
3
W14
3
0
N/F
CHARLES I. TURNER AND
MARY E. TURNER
22.97 ACRE TRACT
3331/61
ZONED A-❑
(PREVIOUSLY
15
16
17
18
19
20
21
22
4
-
-
25
zb
27
z8
29
KATEILANE
31
PARKLAND
0.35 ac.
1
7' 45' 43"W - 198.00'
42' 14' 17"W - 40.00'
N47' 45' 43"W - 24.00' PARIQ-AND
-S42' 14' 17"W - 110.00' 0.35 ac
ALLEY N47' 45' 43"W - 113.18'
2 PARKLAND ARKLAND �j C
0.38 ac. 3 59.88 ACRE S
3
0.26 ac.
004
N
ING ZONING: "
N42'
BLOCK 1
9
11
12 N47'
13
�'4
EXIST00
PDD - PLANNED
W
-DEVELOPMENT DISTRICT i
PROPOSED ZONING: I o
PDD - PLANNED I y
F❑XTR❑j
Y
N34' 14' 36"W - 51.34'
DEVELOPMENT DISTRICT
G1 1 24.31' 1 25.00' 055'43'15" 13.21 23.37' NOr29'O8'E
3
0
(PREVIOUSLY
;
o
'
DEDICATED PARKLAND
i
5
Z
3
AREA NOT INCLUDED)
I
o
d'
(
10 I
S42' 14' 17"W - 36.00'
J
11Ln
12
S47' 45' 43"E - 113.00'
I
W
3
1
1
11
N47' 45' 43"W - 3.50'
I
13
la
't
Z
S42' 14' 17"W - 24.00'
S42' 14' 17"W - 180.00'
I
Q
I
15
I
Q
PARKLAND
N47' 45' 43"W - 113.00'
PARKLAND
N47' 45' 43"W - 269.70'
0.38
0.37 ac
CAPPS DRIVE S42' 14' 17"W - 557.00'
HEATH PHILLIPS INVESTMENTS, LLC
THE BARRACKS U
S41' 55' 50"W - 116.50'
FUTURE DEVELOPMENT
— — —
— (
1 S41' 12' 34"W - 517.37'
l i I j____) n
KEEFER LOOP I-
r�
Z
a
r
' a
J m
od
O H
c
w
d
H
H
0
Z
N/F
❑SAGE, LTD
12,40 ACRE TRACT
1130/570
ZONED A-❑
ROCK PRAIRIE ROAD WEST
NAVARRO DRIVE
DEACON DRIVE
Q
Q -
o
ry
Z
w
0
Pq
J
W
3
Ln
V_
REZONING AND PROPERTY BOUNDARY
= DRAINAGE EASEMENTS
UTILITY EASEMENTS
RAILROAD
_P--P-Pi, GAS PIPELINE
NOTE:
1. PARKS 3,L 4 & 5 ARE NOT INCLUDED IN THIS REZONING
VICINITY MAP
_ Q-
9
A AN
A�,� QIP
G< \
�d PROJECT SOP
LOCATION p
N
�0
NOT TO SC
REZONING MAP
HE BARRACKS II DEVELOPMEN
59.88 ACRES
EXISTING ZONING
PDD -PLANNED DEVELOPMENT DISTRICT
PROPOSED ZONING
PDD -PLANNED DEVELOPMENT DISTRICT
CRAWFORD BURNETT LEAGUE A-7
COLLEGE STATION, BRAZOS COUNTY, TEXAS
SCALE: 1" =
DEVELOPER:
Heath Phillips Investments, LLC.
4490 Castlegate Drive
College Station, TX 77845
(979) 690-721 0
OWNER:
Heath Phillips Investments, LLC.
4490 Castlegate Drive
College Station, TX 77845
(979) 690-7250
JUNE 2013
MAM"I
Brad Kerr, RPLS No. 4502
Kerr Surveying, LLC.
505 Church Avenue
College Station, TX 77840
(979) 268-3195
ENGINEER:
Schultz Engineering, LLC.
TBPE Firm Reg. No. 12327
2730 Longmire, Suite A
College Station, Tezas 77845
(979) 764-3900
Curve Table
CURVE
LENGTH RADIUS DELTA TANGENT CHORD CHORD DIRECTION
G1 1 24.31' 1 25.00' 055'43'15" 13.21 23.37' NOr29'O8'E
NOTE:
1. PARKS 3,L 4 & 5 ARE NOT INCLUDED IN THIS REZONING
VICINITY MAP
_ Q-
9
A AN
A�,� QIP
G< \
�d PROJECT SOP
LOCATION p
N
�0
NOT TO SC
REZONING MAP
HE BARRACKS II DEVELOPMEN
59.88 ACRES
EXISTING ZONING
PDD -PLANNED DEVELOPMENT DISTRICT
PROPOSED ZONING
PDD -PLANNED DEVELOPMENT DISTRICT
CRAWFORD BURNETT LEAGUE A-7
COLLEGE STATION, BRAZOS COUNTY, TEXAS
SCALE: 1" =
DEVELOPER:
Heath Phillips Investments, LLC.
4490 Castlegate Drive
College Station, TX 77845
(979) 690-721 0
OWNER:
Heath Phillips Investments, LLC.
4490 Castlegate Drive
College Station, TX 77845
(979) 690-7250
JUNE 2013
MAM"I
Brad Kerr, RPLS No. 4502
Kerr Surveying, LLC.
505 Church Avenue
College Station, TX 77840
(979) 268-3195
ENGINEER:
Schultz Engineering, LLC.
TBPE Firm Reg. No. 12327
2730 Longmire, Suite A
College Station, Tezas 77845
(979) 764-3900
CAIN ROAD
180 90 0 180
SCALE IN FEET
NF
JOHN WHEELER BANGER, TRUSTEE 29.175 ACRE TRACT
7583/90
ZONED A-0
/ DETENTION POND 3 & PRACTICE FACILITY
�Z WAKE TOBOARDSKI FACILITY
J
r-- -----------
--- ---- - -- -
Conn �;� �-�ri r T 1-777 ;� r 1
1
SF 1 I 1 ---I I RECREATION I 11
CENTER,
-19
I I
NC, 11 1 ' I o - - - --I _ `---- -- -- - -- -- -- I -- II AMENITIES, ( I i
11 ,1 rt E it 50 ft ROW, 27 ft Pvmt j) &PARKING COMMERCIAL ,
0 - - - - -� , - -- -- -- - -- -- -- I T_H_ 1 i ( DETENTION i I TRACT 2 1
COMMERCIAL i! 8 1 f( I Co I ) n I I e' POND 2 j I
TRACT 1 1 11 �, ►1 �' i 1 i �� i 1 1 I I 1 1 ISE
11 1 1 3 - ALLEY - -� r---- -- --�-� -- -- -- Ln I 1
I t 1 1 1 1 -� COM 1
`'----------��-- l- -- -� i - -----i ��----' RC i j RC Block 1���
85 ft ROW, 48 ft Pvmt DEACON DRIVE 85 ft ROW, 48 ft Pvmt
�- -----'//--- rl---� I TT^i E a: \ 1 1 i t 1 1 1
1 1 1 1 I 1.�- :o.. I l i i I i 1 1 i ,H
, i-1
_ _ _ S14 Blo k 4 ) w l)
-_ - -- -- -- -- - - 1 I -- N - - _ _ _
50 ft ROW, 27 ft Pvmt ALLEY 50 ft ROW, 27 ft Pvmt ALLEY
I I __ I I I I I ( \� ..y. T 1
1 I I ��\\� IT 11. I o :�c:
I 1 1 i 1 1 1 1 1 1 I I __ -- �. � to .m 1
I i I 1 SF 1 I 1 1 1 I FTTT
I SF 11 I 1 ) ..
L. - --
I I _ -�
N/F I 1 - - - - - -
0O2LLEOG2E STATION �I.ST.D. r = _ - - - - - - - - � -, I I - - E , 1 t;:i 50 ft ROW, 27 ft Pvmt
-- -- --- -- --
I I n.
9s2s ozs_ _-- 1 - - - - - - - -T
ZONEIS A-0 I I 1 _ ..
SF
1 --
I
E I i �(- I T ^� I.
> i J n H 1 -- \� \ -r -- I I ,HI 1 1 I 1 1 1 1 i 1 i i 1 1 1 1 1 1 I
1 \�,\\
50 ft Row, 27 ft Pvmt '----, 1 I -- i TH 1 \\ 1 TH
3
r -4-7*44 �-44--:d=
M
I L_-�� -- I 50 ft ROW, 27 ft Pvmt
1 1 I 1 1 i
SF' 1 1 I I 1 SF 1 rl---
II I
_50 ft ROW, ft Pvmt I _ _ ( 1- - - - - - -
I I -- �---, t------ __ /� :�:.:�;�; I -- � i iHi 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1!1'I
I
50 ft ROW 27 ft Pvmt
I I Park -
?L
ark 0.54_ac) , .�:: ark i i -- I Au EY
1 1 I I 1 SF I __ I // % `` "5� E -
JAII
1 I I 1 1 I = 1 r -- �%� '/� > -- TTT1
--
1--- ---- -- -- - -- -- --- -- 1 I -- I ?�� -- a, 1
EI 1 IBI 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I
.�
1 o> I 1 1 1 1 i 1 1 1 1 I i 1 1 i 1 i i 1 t i ,
-TH OR
t -- 1 -- o -- t
p.; :.:: -- --
I I I % M. I 67 ft ROW, 38 ft Pvmt
__ --
TH
�
�a., r o
OAK CREEK LLP. R/A 58b2 ACRE TRACT HENRY P. MAYO AND WM SANDRA K. MAYO CHARLES 1. TURNER ANFD MARL E TURNER I -- I -- 1 I -- I I -- // �� --
BR:4030 98 23.00 ACRE TRACT TRACT 2, 2297 ACRE TRACT 3331/61
WUNTY 1253/878 ZONED A-0
BRAZOS COUNTY
t-
I _ _ 50 ft ROW, 27 ft Pvmt
1 l1:I �1
-- , 1 1 1 1 1 THi i l i i' c:: :l i i i i i i THi
_ __ 1 1 1 1 1 1 1:;0: �, 1 1
1 Tom- 1 I-- - - - - J :...:a: L - - - - -1
0
BU mak IIl WILLIAMSGATE
SUED s10N SUPBHD�ME ION n = ce a e o
7705/208
Ii1E BARRACKS
SUBDIVISION
�m1 PHASE 2
i I I a
n= Lux
ow muff -ON"
o
s
I T
I f<I
I
T -7--a 1
COMMERCIAL I
TRACT 3 ;
i I I I
•1--- I i
COMALLEY
;
I T f i------�
OSAGEE,F LTD
1240 ACRE TRACT
1130/570
ZONEi) A-0
IRW OF
OEMOM
SITE NOTES:
1. THE BEARING SYSTEM SHOWN HEREON IS
BASED ON GRID NORTH AS ESTABLISHED
FROM GPS OBSERVATION.
2. THE SITE ADDRESS IS 3100 HAUPT
ROAD, COLLEGE STATION, TEXAS.
3. NO PORTION OF THIS TRACT IS WITHIN
THE 100 YEAR FLOODPLAIN ACCORDING
TO THE F.E.M.E. FLOOD INSURANCE RATE
MAP FOR BRAZOS COUNTY AND
INCORPORATED AREAS, COMMUNITY
PANEL NO. 48041 CO305 E, EFFECTIVE
DATE: 05-16-2012.
4. PARKS 3, 4, & 5 ARE NOT INCLUDED IN
THIS REZONING.
VICINITY MAP
!
GENERAL
NOTES
EDGE OF PAVEMENT
1. The land uses proposed for this property are as listed on this plan.
5. Special conditions for the Recreation Facility (RF) are as follows:
RIGHT OF WAY (APPROX.)
a. Townhomes (TIi) meeting R-3 zoning requirements with variances as noted below.
a. Food and beverage services are permitted within the Recreation Facility. Maximum
- - - - - - - - - - -
- - - - - EASEMENT
b. Commercial (COM) meeting C-3 zoning requirements with variances noted below.
size of the restaurant shall be 5000 sf inclusive of all indoor seating, kitchen, office,
- -
PROPERTY LINE
The following additional uses are permitted in Commercial Tracts 2 and 3 only:
and storage spaces.
PREVIOUSLY PLATTED PARK PROPERTY
• Shooting Range - Indoor
b. Commercial amusement activities, including water recreation and associated
FUTURE PARK PROPERTY
• Car Wash subject to supplemental standards contained within the UDO
equipment, shall be allowed within the Recreation Facility boundary shown on the
• Commercial garden/greenhouse/landscape maintenance subject to
Concept Plan. Motorized vehicles such as boats and jets skis are not allowed except
supplemental standards contained within the UDO
for rescue or maintenance purposes.
• Commercial amusement subject to supplemental standards contained in the
C. Any buildings and parking areas associated with the Recreation Facility shall
UDO
comply with the Non -Residential Architectural Standards in the UDO.
• Office and retail sates/services with storage areas being greater than 50% of
d. Landscaping requirements in the UDO will be applied to the building, parking, and
the space (i.e, officefwazehouse with overhead doors)
adjacent amenity areas of the Recreation Facility. The remainder of the Recreation
• Self Storage - equipment, materials, recreational vehicles, or boats - in
Facility is excluded from these requirements.
buildings with at least 3 enclosed sides.
e. A block length of up to 1250 feet is allowed along Deacon Drive in front of the
C. Recreation Facility (RF) including commercial amusement activities, cable wake
Recreation Facility (RC Block 1).
board ski facility, administrative offices, pool, exercise room, jogging track, food &
f. The Recreation Facility will be platted as a single commercial building lot with a
beverage services, micro -industrial use for amicro-brewery, and similar recreational
single or multiple buildings, that encompasses Detention Ponds 1 and 3. Drainage
offerings for members of the HOA and the general public. Retail sales of
and access easements shall be granted to the Homeowners Association for I!
equipment, clothing, and accessories related to these uses are permitted in
maintenance purposes associated with the detention ponds and their related
conjunction with normal operations of the Recreation Facility. Additional accessory
appurtenances.
uses for this area include a development sates office and model residential condo
g. The following operational restrictions shall be im
imposed on the Recreation Facility
P
units, (attached to the commercial building), upon build out of the development the
and its related facilities:
model residential condos will become rental
e e enta condo unit. Also, additional rental
• Hours of operation for the cable wake board ski facility shall be no earlier
condo units for overnight accommodations on a short or long basis will be allowed
than 8:00 am. and no later than 10:00 p.m. All other recreational amenities
in this area. The total number of rental condo units will not exceed 20 units. The
may be open for use between the hours of 7:00 a.m. and 12:00 midnight. The
units will be rental only and will be owned by the Recreation Facility Developer.
restaurant will be allowed to set its own hours of operation.
2. General bulk or dimensional variations (meritorious modifications) are as follows:
• Lighting shall be designed in accordance with the Unified Development
a. Townhome (TI -1) development (variations from R-3 Zoning)
Ordinance. Lights used for the ski facility shall be turned off no later than 1
• Front setback distance - 20 ft without rear access, 15' with rear access
hour following the closing times noted above except when necessary for
• Rear setback distance - 20 ft
maintenance purposes that cannot be undertaken during daylight hours.
Street side setback distance 15 ft
- 15
• A landscaped buffer shall be established between the Recreation Facility and
• Side setback distance - 5 ft
the property immediately north in accordance with the Unified Development
Common area side setback distance - 5 ft
Ordinance. Plantings shall include shrubs and trees that, when fully mature,
b. Commercial (COM) development (variations from C-3 Zoning)
shall be of sufficient density to provide 100% opacity to a height of at least 6
• Restaurants shall not be permitted in Commercial Tracts 2 or 3.
feet as measured from the adjoining property line.
• The rear setback for self storage structures adjacent to a public alley or
• The Recreation Facility shall have a maximum of three 2 -tower cable wake I
n area w
ski systems.
• In locations ons wh a the rear wall of self storage building is adjacent to an alle
g g J y
6. Density for the residential portions of this tract shall not exceed 8.50 dwelling
serving residential units, the.rear wall may serve as the buffering wall between
units per acre. This figure is computed by dividing the total number of dwelling units by
land uses. The wall shall be constructed of stone.
the sum total of open space areas (parks, detention pond, common areas) plus the privately
owned properties inside the residential areas. Detention ponds used in conjunction with the
• The maximum height of buildings in the Recreation Facility shall not exceed
Recreation Facility are excluded from this computation as long commercial operations are
50 feet.
offered at the facility.
C. Commercial Tracts 2 and 3 shall each be permitted to erect a freestanding sign in
7 All commercial and residential buildings shall be limited to 2.5 stories (35 feet) except at
accordance with Section 7.4.N of the UDO. These signs may be raised to a
the Recreation Center. Unless otherwise noted herein, all non-residential buildings shall
maximum height of 20 feet.
meet the single-family height setback requirements of the UDO where they adjoin
d. Dead-end streets in residential areas are permitted up to maximum of 100 feet in
townhome or single family homes.
length. The dead-end alley adjacent to Commercial Tract 3 shall extend to the
8. When there are morethan 30 lots to be served by external street connections, a minimum
property line (approximately 110 feet).
of two connections to external paved public streets shall be required. A Remote Emergency
3. Special conditions for Townhome (TM development:
Access is permitted to serve as one of these connections. Two street connections to
a. The townhome structures shall not exceed 9,000 s£
external paved public streets shall be required when 100 or more lots are served.
4. Special conditions for Commercial (COM) development:
9. Unless otherwise noted herein, buffer areas will be provided in accordance with the UDO.
a. The total building area of all commercial buildings shall not exceed 100,000 sf. This
10. Driveway access from residential lots shall not be permitted onto streets designated as
figure excludes self storage units and buildings associated with the Recreation
minor collector or larger.
Facility.
11. Right-of-way and pavement widths shown on this pian reflect the widths that are required
b. Self storage units shall be allowed in Commercial Tract 3 only. The total leasable
along the majority length of each street. These widths can be increased at intersections of
area of all self storage units shall not exceed 60,000 s£
collector streets as needed to accommodate turning lanes, medians or other traffic controls.
C. No openings to self storage buildings are allowed on the sides adjacent to any street
12. All stormwater requirements (including detention) shall be designed to comply with the
right -of --way or alley that is associated with residential development.
BCS Drainage Design Guidelines. The detention pond adjacent to Commercial Tract 2
d. The self storage facility will be permitted to incorporate an office on the premises for
shall also meet commercial standards including landscaping and treatment of concrete
management and security. The office shall be permitted to sell equipment or
structures.
N
materials related to storage and moving, but shall not sell/rent trucks or trailers. The
13. If the City of College Station or another entity constructs a regional detention facility in the
LL
office will be limited to a maximum of 1,000 sf. Living quarters for the managers
drainage basin encompassing this tract of land that has capacity to serve this development,
'
of the facility will also be permitted within the premises. These quarters shall be no
one or more of the detention facilities shown here may be eliminated upon approval by the
larger than 1,000 s£
Individual buildings
City Engineer. Any land released from use as a detention facility may be developed for
Q
e. commercial shall not exceed 10,000 sf with the following
endin
other uses approval of revised PDD Zoning.
pending PP g
exception. --- - '
I 14. Pedestrian and bicycle circulation will be provided throughout the project as required`by
_
Z
• One commercial building will be allowed up to a maximum of 15,000 sf. The
the UDO. Location and details of these facilities will be determined at platting or site plan
obuilding
may be located on Commercial Tract 3.
submittal
m
• This maximum building size does not apply to the Recreation Center.
W
f. Unless otherwise noted herein, commercial buildings and related parking areas shall
comply with the Non -Residential Architectural Standards in the UDO. Design of
these structures shall be compatible in size, roof type and pitch, architecture, and lot
coverage with the surrounding single-family residential uses.
g. All commercial tracts shall provide cross access in accordance with the UDO.
IRW OF
OEMOM
SITE NOTES:
1. THE BEARING SYSTEM SHOWN HEREON IS
BASED ON GRID NORTH AS ESTABLISHED
FROM GPS OBSERVATION.
2. THE SITE ADDRESS IS 3100 HAUPT
ROAD, COLLEGE STATION, TEXAS.
3. NO PORTION OF THIS TRACT IS WITHIN
THE 100 YEAR FLOODPLAIN ACCORDING
TO THE F.E.M.E. FLOOD INSURANCE RATE
MAP FOR BRAZOS COUNTY AND
INCORPORATED AREAS, COMMUNITY
PANEL NO. 48041 CO305 E, EFFECTIVE
DATE: 05-16-2012.
4. PARKS 3, 4, & 5 ARE NOT INCLUDED IN
THIS REZONING.
VICINITY MAP
CONCEPT PLAN
THE BARRACKS II SUBDIVISION
59.88 ACRES
CRAWFORD BURNETT LEAGUE, A-7
COLLEGE STATION, BRAZOS COUNTY, TEXAS
JUNE 2013
OWNER/DEVELOPER: ZONING STATUS:
Heath Phillips Investments, LLC. Current: PDD
4490 Castlegate Parkway Proposed: PDD
College Station, TX 77845
(979) 69)-7250
ENGINEER:
SURVEYOR:Schultz Engineering, LLC
Brad Kerr, RPLS No. 4502
Kerr Surveying, LLC (� i
P.O. Box 269 TBPE Firm Reg. No. 12327
College Station, Tx 77841 2730 Longmire Dr., Suite A
(979) 268-3195 College Station, Tx 77845
_E (979) 764-3900
!
LEGEND
EDGE OF PAVEMENT
RIGHT OF WAY (APPROX.)
-
- - - - - - - - - - -
- - - - - EASEMENT
ZONING CHANGE BOUNDARY
- -
PROPERTY LINE
PREVIOUSLY PLATTED PARK PROPERTY
(NOT INCLUDED IN 59.88 ACRES)
FUTURE PARK PROPERTY
DRAINAGE EASEMENT
CONCEPT PLAN
THE BARRACKS II SUBDIVISION
59.88 ACRES
CRAWFORD BURNETT LEAGUE, A-7
COLLEGE STATION, BRAZOS COUNTY, TEXAS
JUNE 2013
OWNER/DEVELOPER: ZONING STATUS:
Heath Phillips Investments, LLC. Current: PDD
4490 Castlegate Parkway Proposed: PDD
College Station, TX 77845
(979) 69)-7250
ENGINEER:
SURVEYOR:Schultz Engineering, LLC
Brad Kerr, RPLS No. 4502
Kerr Surveying, LLC (� i
P.O. Box 269 TBPE Firm Reg. No. 12327
College Station, Tx 77841 2730 Longmire Dr., Suite A
(979) 268-3195 College Station, Tx 77845
_E (979) 764-3900