Loading...
HomeMy WebLinkAboutApplicationFOR QFFdQE.USE QNLY P&Z CASE NO.: DATE SUBMITTED: CITY OF COLLEGE STATION Planning & Development Services MASTER PLAN APPLICATION The following items must be submitted by an established filing deadline date for P & Z Commission consideration. MINIMUM SUBMITTAL REQUIREMENTS: N.A. $400 Filing Fee No fees due as per Molly Hitchcock, AICP. X_ Application completed in full. X Thirteen (13) folded copies of plan. (A revised mylar original must be submitted after staff review.) _X A copy of the attached checklist with all items checked off or a brief explanation as to why they are not. N.A. Rezoning Application if zone change is proposed. Date of Required Preapplication Conference: August 8, 2007 NAME OF SUBDIVISION Peach Creek Development SPECIFIED LOCATION OF PROPOSED SUBDIVISION South of Indian Lakes and between S.H. 6 F.M. 2154. APPLICANT/PROJECT MANAGER'S INFORMATION (Primary Contact for the Project): Name J. Dale Browne, Jr., P.E., McClure & Browne Engineering/Surveying, Inc. Street Address 1008 Woodcreek Drive, Suite 103 City College Station State Texas Zip Code 77845 E -Mail Address dbrowne(a)-mcclurebrowne.com Phone Number 979-693-3838 Fax Number 979-693-2554 PROPERTY OWNER'S INFORMATION: Name Jack McFarlane, Peach Creek Partners, LTD. Street Address P.O. Box 591 City Millican State Texas Zip Code 77866 E -Mail Address mcfarlane_je@hotmail.com Phone Number 979-595-5151 Fax Number 979-987-3403 ARCHITECT OR ENGINEER'S INFORMATION: Name J. Dale Browne, Jr., P.E., McClure & Browne Engineering/Surveying, Inc. Street Address 1008 Woodcreek Drive, Suite 103 City College Station State Texas Zip Code 77845 E -Mail Address dbrowne@mcclurebrowne.com Phone Number 979-693-3838 Fax Number 979-693-2554 Page 1 of 3 TOTAL ACREAGE OF SUBDIVISION: 2,274 acres TOTAL ACREAGE BY ZONING DISTRICT: Not applicable - property is located in ETJ. TOTAL FLOODPLAIN ACREAGE +/- 522 acres WILL PARKLAND DEDICATION BE MET BY ACREAGE OR FEE ? (CIRCLE ONE) (if acreage, please show approximate size and location on plan) Not applicable - Property is located in ❑ the ETJ. REQUESTED VARIANCES TO SUBDIVISION REGULATIONS & REASON FOR SAME At this time, needed variances are not known. If needed, variances will be requested during the preliminary plat process. REQUESTED OVERSIZE PARTICIPATION Oversize participation will be coordinated with each respetive utility provider as development [ occurs. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true and correct. The undersigned hereby requests approval by the City of College Station of the above -identified plan. Uig ature and Tide rz IL� c' Date Page 2 of 3 CITY OF COLLEGE STATION Planning & Development Services SUBMIT APPLICATION AND THIS LIST CHECKED OFF WITH 13 FOLDED COPIES OF PLAT FOR REVIEW MASTER PLAN MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: ® 1. Drawn on 24" x 36" sheet to scale of 100' per inch or larger. Multiple sheets may be re�uired. Re er to Note 7 of the Revise Master Plan. ® 2. Vicinity map which includes enough of surr � a to show general location of subject property in relationship to College Station d its City Limits. No scale required but include north arrow. 3. Title Block with the following information: Name and address of subdivider, recorded owner, planner, engineer and surveyor. Proposed name of subdivision. Date of preparation. Engineer's scale in feet. Total area intended to be developed. ® J h Arrow. ® Subdivision boundary indicated by heavy lines. ® 6. If more than 1 sheet, an index sheet showing entire subdivision at a scale of 500 feet per inch or larger. Refer to Note 7 of the Revised Master Plan. Proposed land uses, including but not limited to street rights-of-way. N.A. ❑ 1,e Proposed zoning changes, if applicable. ® V"' Proposed drainage development, including the location of the 100 Year Floodplain and Floodway, if applicable, according to the most recent available data. 10'. Proposed public improvements, including but not limited to parks, schools, and other public facilities. ® 1. Proposed phasing of future development. Refer to Note 6 of the Master Plan. ® 1 Lot corner markers and survey monuments (by symbol) and clearly tied to basic survey data. f 13. All proposed ROW locations required to meet the Comprehensive Plan. N.A.❑ 14. All proposed Utility Services (Water & Sanitary Sewer) sufficient to meet the Utility Master Plan. Page 3 of 3